MINIMIZING DEFECTIVE PRODUCT THROUGH EFFECTIVE PRODUCTION PLANNING AND CONTROL IN DEFENCE INDUSTRIES CORPORATION OF NIGERIA
ABSTRACT
This research work examine production planning and control as a tool for minimizing defective products through effective production planning and control in Defence Industries Corporation of Nigeria (DICON), Kakuri Kaduna. Hence the scope of the research cover every activity which has to do with production planning and control. The work covers statement of the general problems, research objectives, scope of the study, significance of the study and limitation of the study. Also diverse view of authors on production planning and control and other related areas in review. The research work employs the descriptive method for the purpose of an in-depth investigation. A sample size of 70 respondents was selected from the total population of 180 staff, questionnaire were administered to them, oral and verbal interview as well as obtaining information. Hypothesis H0 and H1 formulated on using effective production planning and control to minimize defective product in production performance. Date collected were presented and daily analyzed in tabular format using percentages, other findings of the studying centered on the required raw materials used by the organization but sourced outside the country, government policies such as hinge tax payments, customers and excise charges contributes to high production cost with locally sourced raw materials not maintaining a stable price from time to time with future plans having limitation due to some government regulations, economic downs turn, environmental factors technological changes, competitors actions. The study also brought to the fore the importance of production planning and control in the role of forecasting in production and operation management. Finally based on the findings a number of quality recommendation were offered to the organization to embrace in raw materials sourcing using alternative means i.e. research and development department, the complete computerization of the control system and other key system should be pursued effectively.
CHAPTER ONE
Introduction
1.1 Background Of The Study
Production Planning and Control provides the foundation for any effective production management in every organization or manufacturing sector by minimizing defective products is very vital issue to a production managers.
To guarantee effective material flow Production Planning and Control represents the beating heart of any manufacturing process. Production Planning and Control purpose is to minimize production time and costs, efficiently organize the use of resources and maximize efficiency in the work place.
Production Planning as defined by Digreens (2009, pg. 21) “is a set of function concerned with the effective utilization of limited resources (such as raw materials, manpower, machinery etc.) and the management of materials flow through these resources, so as to satisfy customer demands and create profit.
As can be seen in other related field of management, Production Planning and Control plays the primary functions of the production management and operations.
This has prompted this research work to look at Production Planning and Control as a tool for minimizing defective product in manufacturing industries of Nigeria economy as exemplified by Defence Industries Corporation of Nigeria Kakuri, Kaduna. Production is the central focus of any manufacturing concern. It is the platform where the real mix takes place i.e. The conversion of raw materials (in-put, starters) into completed or finished products (output) after a well planned logical form or process production planning incorporate a multiplicity of production elements, ranging from the every day activities of staff to the ability to realize accurate delivery times for the customers.
Modern and improve production is complex hence technologically related operations and administrative activities must be planned carefully to make account and benefits. With an effective production planning cooperation at its nucleus, any form of manufacturing process has the capability of exploit its full potential.
In Production Planning, it not only involves the type of operation to be used but also the order of these operations as well as time which the operation should take and how it should be properly and effectively laid out.
There are different function performed by Production Planning and Control Department of an organization. Procedures may also vary; all the production planning and control department are essentially expected to perform the following functions:
According to Buffa, E.S, Modern Management, New Delhi: Willy 1988 “Production Planning may be defined as the technique of foreseeing every step in a long series of separate operations, each step to be taken at the right time and in the right place and each operation to be performed in maximum efficiency.” It helps entrepreneur to work out the quantity of material, manpower, machine and money requires for producing predetermined level of output in a given period of time.
Routing: Under this, the operations their path and sequence are established. To perform these operations, the proper class of machines and personnel required are also worked out. The main aim of routing is to determine the best and cheapest sequence and to ensure that this sequence is strictly followed.
Routine procedure involves following different activities:
- An analysis of the article to determine what to make and what to buy.
- To determine the quality and type of material.
- Determining the manufacturing operations and their sequence.
- A determination of lot sizes
- Determination of scrap factors
- An analysis of cost of the article
- Organization of production control firm
Scheduling: It means working out of time that should be required to perform each operation and also the time necessary to perform the entire series as routed, making allowance for all factors concerned. It mainly concerns with time element and priorities of a job. The pattern of scheduling differs from one another which is listed below:
a) Production Schedule:
The main aim is to schedule that amount of work which can easily be handled by plant and equipment without inference. Its not independent decision as it takes into account the following factors.
- Physical plant facilities of the type required to process the material being scheduled.
- Personnel who possess the desired skills and experience to operate the equipment and perform the type of involved.
- Necessary material and purchased parts.
b) Master Schedule:
Scheduling usually start with preparation of master schedule which is weekly or monthly break-down of the production requirement for each, product for a definite time period; by having this as a running record of total production requirement. This forms a base for all subsequent scheduling activities. A master schedule is followed by operator schedule which fixes total time required to do a piece of work with a given machine or which shows the time required to do each detailed operation of a given job with a given machine or process.
c) Manufacturing Schedule:
It is prepared on the basis of type of manufacturing process involved. It is very useful where single or a few product are manufactured repeatedly at regular interval. Thus it would show the required quality of each product and sequence in which the same to be operated.
d) Scheduling of Job Order Manufacturing:
Scheduling acquires greater importance in job ordering manufacturing. This will enable the speedy execution of job at each center point. It enables the foreman to see at a glance;
- The total load on any section
- The operational sequence
- The stage, which any job has reached
Loading:
The next step is the execution of the schedule plan as per the route chalked out, it includes the assignment of the work to the operators at their machines or work places. So loading determines who will do the work as routing determine where and scheduling determines when it shall be done.
Production Control:
Samuel Elison (1994) in his book, Element of Production Planning and Control, Bombay: Universal Book Co., 1985 says “Production control is the process of planning production in advance of operation, establishing the extract route of each individual item part or assembly, setting, starting and finishing production and releasing the necessary order as well initiating the necessary follow-up to have the smooth function to the enterprise.
Dispatching:
Dispatching involves issue of production order for starting the operation, necessary authority and confirmation is given for:
- Movement of materials to different work station
- Movement of tools and fixtures necessary for each operation
- Beginning of work on each operation
- Recording if time and cost involved in each operation.
- Movement of work from one operation to another in accordance with the route sheet.
- Inspection or supervision of work.
Dispatching is an important step as it translate production plan into production.
Follow Up:
Every production programme involve determination of the progress of work, removing bottlenecks in the flow of work and ensuring that the productive operation are taking place in accordance with the plans. It spot delays or deviation from the production plans. It helps to reveal defects in routing and scheduling, misunderstanding or orders and instruction, under loading or over loading of work etc.
Inspection:
This is mainly the quality of goods, it can be required as effective agency of production control.
Corrective Measure:
Corrective action may involve any of those activities of adjusting the route, rescheduling of work changing the work loads, repairs and maintenance of machinery or equipment, control over inventories of the cause of deviation in the poor performance of the employees. Certainly personnel decisions like training, transfers, demotion etc. may have to be taken alternative methods may be suggested to handle peak loads. The following are required to be able to achieve the activities successfully:
- Sales or contract programmes
- Approval of design for manufacturers
- Jigs and fixture tools for manufacturer
- Rate fixing and time study – work study
- Estimate of costs – labour, overhead experience etc.
- Routine and machine allocation
- Amount of inspection required and necessary
- Labour/workforce required e.g. skilled or unskilled
- Report writing i.e. finding reported for appropriate action
1.2 Statement Of Research Problem
For a manufacturing organization and indeed any other organization besides the general planning and control planning, control of materials is particularly very crucial for its survival hence effective producing planning and control is necessary in every organization.
The success of our present day industries depends on how to effectively utilize and to enhance growth and development and sustain for better industrialization.
Therefore, this research work is concerned with identifying the way in which defective product can be minimized through effective production planning and control in Defence Indus tries Corporation of Nigeria.
To this end, the following questions occupy our mind before the research as problem generally associated on what roel does the choice of production planning and control plays in a Defence industries.
The researcher wants to know why production planning and control is vital and useful in minimizing defective products in Defence Industries.
While there is not standard system in production planning and control which can be universally recommended, even production planning and control system must be designed to meet the particular needs and concern of the manufacturing organization.
1.3 Objective Of The Study
The importance of production planning and control motivated me to undertake a study of how the principle and techniques of production planning and control are applied in defence industries corporation of Nigeria (DICON), Kakuri Kaduna.
However, the primary concern of this research work is to investigate.
- The tool to minimize defective product in Defence Industries that deals with the production of arms and ammunition.
- The study is also aimed at examining the effectiveness of the application of production planning and control in today’s manufacturing for the growth of the organization and at the same time provide useful suggestion to the identified problems by advising the management all cost associated and increase efficiency in the organization as a whole.
- The factors influencing the choice of production.
- Various factors, which are crucial for designing the production.
It is hoped that, this objectives when attain will be tremendous benefit to the Defence Industries Corporation of Nigeria (DICON) and Nigeria in general.
1.4 Significance Of The Study
This study will be of great significance in that it seeks to emphasize on:
- How the principle and technique of production planning and control has been practiced as DICON ordnance factory complex, Kakuri Kaduna.
- The entire process involve that make production of each arm and ammunition possible from the start of production, steps it passes through and detail of the whole process.
- It will help in broadening the academic horizon of the researcher.
Finally, it is hoped that the work will serve as a reference guide to students and scholars who ought to use it.
CHAPTER TWO
2.0 Literature Review
2.1 Introduction
The review of relevant literature is the main topic of this chapter. A literature review covers theoretical and methodological contributions to a certain issue in addition to the state of knowledge at the time of writing. It provides information about the state of the art in relation to the subject you are writing about. It examines the body of work on the chosen subject. The literature evaluation in this study comprises the …
Procedure for Downloading the PDF (Docx) Material
Minimizing Defective Product Through Effective Production Planning and Control in Defence Industries Corporation of Nigeria can be downloaded by requesting the full set of materials at the project or seminar cost. The document will be sent via Microsoft Word (MS-Word) format via WhatsApp (e-mail) following payment confirmation.
Seminar Material Cost ₦3,000 | Project Material Cost ₦5,000 |
Request Complete Material
Click here to request the Complete Material via WhatsApp including;
|
TABLE OF CONTENTSPRELIMINARY PAGES
- Title page
- Approval page
- Dedication
- Acknowledgement
- Table of Contents
- Abstract
INTRODUCTION
- 1.1 Background …
- ⋮
LITERATURE REVIEW
- 2.1 Introduction
- 2.2 Conceptual Review
- 2.3 Theoretical Framework
- ⋮
- 2.4 Empirical Studies
CHAPTER THREE
RESEARCH METHODOLOGY
- 3.1 Introduction
- 3.2 Research Design
- 3.3 Population of Study
- 3.4 Sampling and Sampling Technique
- 3.5 Validation of Research Instrument
- 3.6 Method of Data Collection
- 3.7 Method of Data Analysis
- 3.8 Questionnaire Administration
- 3.9 Ethical Consideration
- 3.10 Statistical Analysis
CHAPTER FOUR
DATA ANALYSIS, RESULT AND DISCUSSION
- 4.1 Introduction
- 4.2 Presentation and Analysis of Data
- 4.3 Re-statement of Research Questions
- 4.4 Test of Hypotheses
- 4.5 Discussion of Findings
CHAPTER FIVE
SUMMARY, CONCLUSION AND RECOMMENDATION
- 5.1 Introduction
- 5.2 Summary of Findings
- 5.3 Conclusion
- 5.4 Recommendation
- 5.5 Suggestion for Further Study
REFERENCES
APPENDIX A - “QUESTIONNAIRE”
Disclaimer for Complete Material Utilization
The displayed research work titled "Minimizing Defective Product Through Effective Production Planning and Control in Defence Industries Corporation of Nigeria" is stated as a research guideline towards accomplishing your assigned project / seminar research work. All the research materials on this website are ONLY for research purposes and should be used as a guideline in developing your research work. For no reason should you copy word for word as projectlist.com.ng will not be liable for any who copied the material. By ordering the complete research guideline, it signifies that you've accepted our terms of service.
PRELIMINARY PAGES
- Title page
- Approval page
- Dedication
- Acknowledgement
- Table of Contents
- Abstract
INTRODUCTION
- 1.1 Background …
- ⋮
LITERATURE REVIEW
- 2.1 Introduction
- 2.2 Conceptual Review
- 2.3 Theoretical Framework
- ⋮
- 2.4 Empirical Studies
CHAPTER THREE
RESEARCH METHODOLOGY
- 3.1 Introduction
- 3.2 Research Design
- 3.3 Population of Study
- 3.4 Sampling and Sampling Technique
- 3.5 Validation of Research Instrument
- 3.6 Method of Data Collection
- 3.7 Method of Data Analysis
- 3.8 Questionnaire Administration
- 3.9 Ethical Consideration
- 3.10 Statistical Analysis
CHAPTER FOUR
DATA ANALYSIS, RESULT AND DISCUSSION
- 4.1 Introduction
- 4.2 Presentation and Analysis of Data
- 4.3 Re-statement of Research Questions
- 4.4 Test of Hypotheses
- 4.5 Discussion of Findings
CHAPTER FIVE
SUMMARY, CONCLUSION AND RECOMMENDATION
- 5.1 Introduction
- 5.2 Summary of Findings
- 5.3 Conclusion
- 5.4 Recommendation
- 5.5 Suggestion for Further Study
REFERENCES
APPENDIX A - “QUESTIONNAIRE”
Disclaimer for Complete Material Utilization
The displayed research work titled "Minimizing Defective Product Through Effective Production Planning and Control in Defence Industries Corporation of Nigeria" is stated as a research guideline towards accomplishing your assigned project / seminar research work. All the research materials on this website are ONLY for research purposes and should be used as a guideline in developing your research work. For no reason should you copy word for word as projectlist.com.ng will not be liable for any who copied the material. By ordering the complete research guideline, it signifies that you've accepted our terms of service.
Frequently Asked Questions (FAQ)
Is the topic “Effect of Computerization on Efficient Banking Services in Nigeria” recommended for Banking and Finance (BF) Project?
Yes it is highly recommended — This research project work was undertaken with a purpose of determining and evaluation of the effect of computerizing banking service and its efficiency on the banking services in Nigeria. The effect of computerizing the banking services on the behavioural aspect of management information system are Aggression Avoidance and projection on the other hand, other operational pressures are maintaining the system; personal problems in the book-keeping department, maintaining book-keeping machines. Expanding volume of operation; need to accommodate the increasing volume, need to maintain or reduce cost. Unsatisfactory output; errors in terms of reports and statement delays in work processing. Needs or system change. The study has a library research and empirical study. Additional information were collected from journals bullions textbooks and …
Is the topic “Language of Persuasion; An Examination of Governor Aliyu Wamakko’s Selected Speeches” recommended for English Language Project?
Yes it is highly recommended — This research work focuses on the language of persuasion by examining some selected speeches of Governor Aliyu Magatakurda Wamakko. It has been carefully observed that the Sokoto state Governor is fond of using persuasive expressions in most of his speeches. He uses the language mostly to captivate and convince his audience and this tends to endear him across the state to achieve his political goals …
Can the material for “Effects of Overpopulation on the Academic Performance of Students in Government Secondary Schools” be used as a guide for Education Project?
Yes it can be used — The study aimed at establishing the effects of overpopulation on the academic performance of government secondary schools. It is designed to identify the factors that contribute to the increase in students’ population, find out the students − teacher ratio in government secondary schools and also the impact of the increase on the academic performance of students. A descriptive survey design was used, while the population of the study consists of government owned secondary schools in Owerri educational zone. A simple random sampling technique was used to select the four (4) schools out of the nine (9) schools in the zone. The four secondary schools selected have a total population of five thousand five hundred and thirty (5530) students and eighty (80) …
Can the material for “Constraints of Effective Teaching and Learning of Biology” be used as a guide for Biology Education Project?
Yes it can be used — Biology Education is a process of imparting knowledge, skills and attitudes in Biology to learners at any level. It gives the learner a sound academic knowledge, skills and ample opportunity to apply this knowledge. The study was carried out to find out the Constraints of Effective Teaching and Learning of Biology in Okpe Local Government Area. In achieving this aim, the following specific objectives were laid out to determine the use of instructional materials affect students academic performance in Biology and examine the constraint facing teaching and learning of Biology in Okpe Local Government Area. The research design used in this report is descriptive design, utilizing questionnaire method to obtain information from the respondents for this project. A total of …
Can the material for “The Influence of Employee Motivation and Its Resulting Effects on the Organization Performance” be used as a guide for Business Administration and Management (BAM) Project?
Yes it can be used — Motivation has been the focus of intensive research effort in recent times as a result of its contribution in enhancing employees’ performance towards organization performance, how well an organization motivates its workers in order to achieve their mission and vision is of paramount concern. It is obviously worrisome that organizations have encounter incessant insubordination and negative attitude to work by the employees. Therefore, the study examines the influence of employee motivation and its resulting effects on the organization performance, using Anchor Insurance Plc as a case study. This study adopted a quantitative survey research design in investigating the effects of motivation on organizational productivity. A well- structured self-administered questionnaire was used as the main tool for data collection and was administered …
Is the topic “Poverty and Youth Restiveness in Nigeria an Evaluation of the Boko Haram Crisis” recommended for Political Science Project?
Yes it is highly recommended — Over the years, Nigeria was experienced series of attacks, agitations, restiveness and blests ranging from diverse regions and localities. References are; hostage thing in the south-south region, the Niger Delta militancy crisis, the Boko Haram crisis in Northern Nigeria (which is the case study of this research work) etc. most restiveness of youths has often been done under the puise of a ring or body, this makes their operational activities fast and broader. All these group exist in the diverse regions of the country, and this includes. The „OPC? popularly known as the „Oduduwa peoples congress” called the Afenifere group. We can also find the „MASSOB? known as the „movement for the actualization of sovereign state of biafra”, in the …
Can the material for “Stress Coping Strategies Among Student Nurses” be used as a guide for Nursing (Science) Project?
Yes it can be used — The study was carried out to investigate the Stress Coping Strategies among Student Nurses on the safety of patients in Federal Medical Centre Abeokuta. Investigation revealed that occupational stress can no longer be considered an occasional, personal problem to be remedied with palliatives. It is becoming an increasingly global phenomenon, affecting all categories of workers, all workplaces and all countries of which nurses of Federal Medical Centre Abeokuta are not exceptional. Data for the study was gathered from both primary and secondary sources. A sample size of 80 nurses was selected using systematic random sampling method. Empirical results from the data indicate that workload, Conflict among colleagues and supervisors are other major causes of stress in nurses at Federal Medical …
Can the material for “The Impact of Delegation of Authority on Staff Performance” be used as a guide for Public Administration (PA) Project?
Yes it can be used — Delegation of authority is one of modern trends practiced by managers, which is the flow or transmission of authority from top to the bottom of the organization. The study was carried out to investigate the Impact of Delegation of Authority on Staff Performance using Imo State Civil Service Commission as a Case Study. In achieving this aim, the following specific objectives were laid out as follows to: identify the impact of the delegation of authority on employees’ productivity at Imo State Civil Service Commission, determine the most cost-effective means of delegation of authority that will not have an adverse effect on Staff Performance, Ascertain the effect of delegation and responsibilities on staff performance, Ascertain what authorities that are delegated ascertain …
Is the topic “Design and Implementation of Patient’s Management System” recommended for Computer Science (CS) Project?
Yes it is highly recommended — This study investigated online hospital management system as a tool to revolutionize medical profession. With many writers decrying how patients queue up for hours in order to receive medical treatment, and some end-up being attended to as „spillover”Ÿ, the analyst investigated the manual system in detail with a view to finding out the need to automate the system. Subsequently, a computer-aided program was designed to bring about improvement in the care of individual patients, taking the advantage of computer speed, storage and retrieved facilities. The software designed will take care of patient”Ÿs registration, billing, treatment and payments. The programming language employed in this work was Microsoft C#. …
Can the material for “The Role of Human Capital Management in Organization Efficiency in Peugeot Automobile of Nigeria Kaduna (PAN)” be used as a guide for Automobile Technology Education Project?
Yes it can be used — The study examined the role of human capital management in organization efficiency in Peugeot automobile of Nigeria Kaduna. The research objective were to examine the nature of recruitment and selection adopted by the organization in Peugeot automobile of Nigeria Kaduna, to know the extent to which human capital management is important and to also identify the problems the organization encounter in managing their human capital and there causes. To provide solution to the study. A survey research design was adopted for the study. Questionnaire and documentary sources were used for data collection. The statistic mean score was used to analyze data obtained from the field with a total population of 215 employees and 80 sample size was used. The findings …