ABSTRACT
Load flow studies in power system constitute a study of paramount importance. This is the study that reveals the electrical performance and power flow (Real and reactive) for specified conditions when the system is operating under steady state. The load flow study also provides information about the line and transformer loads (as wall as losses) throughout the system and voltages at different points in the system for evaluation and regulation of the performance of the power system under conditions known as priori (problem in order of importance).
The term contingency in the power system network is the loss of major transmission elements or a large generating unit. The necessary information obtained from load flow are the active and reactive power flow along the transmission lines, voltage magnitude and phase angles of different buses of the network.
The chapter one of this project topic introduces the load flow study and its contingency in the Eastern part of Nigeria which includes Afam, Sapele, Benin, Onitsha, New Heaven, Delta Alaoji etc. The literature review and historical development of contingency analysis via load flow are contained in chapter one of this project. Chapter two of this project report discusses the various ways of modeling transmission lines. Chapter three of this discusses load flow methods and its comparison.
In chapter four of this work is the brief discussion on Nigeria National grid and the design on single mode contingency analysis in the eastern part of Nigeria using NEPLAN electricity software.Finally, the conclusion and recommendation made on the course of this project topic are contained in chapter five of this project topic.
CHAPTER ONE
1.0 Introduction
The load flow study in a power system constitutes a study of paramount importance. This is the study that reveals the electrical performance and power flows (real and reactive) for specified conditions when the system is operating under steady state. The load flow study also provides information about the line and transformer loads (as well as losses) throughout the system and voltages at different points in the system for evaluation and regulation of the performance of the system under conditions known as prior (problem in order of importance).
The term contingency in the power system network is the loss of major transmission element or a large generating unit. The necessary information obtained from load flow are the active and reactive power flow along the transmission lines, voltage magnitude and phase angles of different buses up the network.
In a 3 — phase A-C power system active and reactive power flows from the generating stations to the load through different network bases and branches/transmission line. The flow of active and reactive power is known as power or load flow. The bus voltages are affected by the reactive power flow due to the compiling between the two of them.
Load flow provides a systematic mathematical approach for determination of various bias voltages, their — phase angles, active, and reactive power flow through different branches, generators and loads under steady state conditions.
We shall see in chapter four how NEPLAN software is used to simulate the reactive and the active power in 330KV network on the Eastern part of Nigeria.
1.1 Literature Review
Load flow study in power system, a parlance (a particular way) is the steady state solution of the power system network. The power system is usually modeled as an electric network and solved for the steady — state powers and voltages at various buses.
The loads are given in terms of complex power rather than impedance. The generators behave more like power sources than voltages and as a result of these failures directs analysis of the circuit is not possible. The main information obtained from load flow studies comprises the magnitude and phase angles of load bus voltages, real and reactive power flows on transmission lines and the power at the reference bus.
Load flow calculation is most frequently performed in power system planning, operating planning and operation control and is increasingly being used. To solve very large system for purposes such as outage, security, assessment, transmission line loss.
A review of load flow calculation has been presented below:
Form ward and Hale I in 1956, describe the first real computed program for solving load problems .Gauss — seidel algorithm for the solution of linear equations was the first method developed for solution of the equation that describes an electrical method. Since the network equations are quadratic, an iterative procedure is required.
Because of the nature f parameters in power system work, a solution is usually obtained.
The Gauss-seidel method encountered greater difficulty in arriving at a solution of the larger networks. Since the effect of an adjustment in the bus voltage during an iteration is reflected only to the buses that are the immediate neighboring buses, several iterations are required for the adjustments to propagate across the system.
Conflicting adjustments may be made and number of iteration increased dramatically for large systems. In some cases no solution was obtained for an actual workable system.
According to B. Stott (2) prior to 1930, all power flow calculations were made by hand. Between 1930 and 1956, network calculator or network analyzers were used to perform load flow calculation. There devices are miniature models of the network being studies. The behaviour of the system is determined by measuring the electrical quantities in the model.
In 1967, W. F. Tinney and C. E. Hart describe load flow using Newton-Raphson Method Solution as the important and most sophisticated method of power flow studies, which users polar coordinate preferably, because rectangular coordinates needs more memory. The number of iteration is more on less independent of the system vary between 3 and 5 iterations.
The Newton-Raphson method solution of power flow problem was described by Van Ness the technique produced a solution in very few iterations. It is faster than Gauss method but it requires large computer memory for the strage of the Jacobian matrix.
Due to the ability of the N — R method to store difficult problems and speed advantage, the Beneville power replaced their power program with the N. R. method. One characteristic of the system is that the real power is mostly dependents on the voltage magnitude. Due to these factors, the fast decompiled load flow 5 solution was developed by B. Stalt in 1974, the decompiled technique took the advantages of the weak compiling between the real and voltage magnitude and also between the reactive power and the voltage magnitude and also between the reactive power and the voltage angle.
Bonneville Power administration was the first to develop a very successful method of calculating load flow. This method uses Newton-Raphson algorithm to solve the simultaneous quadratic equations that describe the power system. In this method the number of iteration required to obtain a solution is practically independent of the size of the system is practically independent of the size of the system.
Other assumptions which are valid in power system operations were also made in order to simplify the power flow problem. The time The N — R method and the memory requirement is about sixty, percent of the normal Newton's method. Several requirements have been made such as reactive model and the hybrid model by Behnam-Gudani for improved convergence characteristic.
Also research have been going on in developing load flow fast convergence algorithm, the Qausi — Newton power flow was developed by Adam Semlyen. This method exploits the combination of Newton —Raphson steps where the whole jacobian is computed and consequently factorized, the recent Jacobian is reused with forward and backward substitution were only a small portion of the Jacobian Matrix is updated.
The partial Jacobian updates are introduced in the power flow program into two ways. Partially refactorization of the Jacobian and a simple step solution is corrected using the Metrix Modification Lemma (MML).
The strategy to reduce the computational burden of the Newton power solution is to keep the Jacobian constant for a number of iterations. An idea introduces to reduce the computing time is partial updates of the Jacobian matrix. It was noticed that not all equations converge at the sometimes, there is not need for updating the whole Jacobian Matrix at every step as it is done in the conventional Newton method.
It was also noticed that at a certain step in the iteration process some residuals have already converged and most residuals are decaying within a few iterations and also few identifiable residuals will converge fast only if the corresponding part (rows) of the Jacobian is updated.
A saving in the order of 50% was achieved compared to the Newton method. The rectangular formulation of the N — R method has cover the years received great attention, such improvement in N R load flow is reported in this paper, an attempt was made to use as linear a model as possible, both the model and the bus constraints are retained.
The N — R method was then applied to the enlarge set of equations written in terms of bus voltages and currents. The scheme combined with a procedure for handling P I buses loads to a computationally efficient algorithm particularly efficient and advantageous in the presence of zero — injection buses.
The idea is to solve an augmented system in which both bus voltages and current injections appear as state variable and both power and current mismatches are zerned. When rectangular coordinates are employed, this yields a set of linearly — coupled quadratic equations rather than the usual set of fully coupled non-linear equations.
This material contains electrical diagrams, circuits, illustrations and more (Very detailed)
CHAPTER TWO
2.0 Literature Review
2.1 Introduction
The review of relevant literature is the main topic of this chapter. A literature review covers theoretical and methodological contributions to a certain issue in addition to the state of knowledge at the time of writing. It provides information about the state of the art in relation to the subject you are writing about. It examines the body of work on the chosen subject. The literature evaluation in this study comprises the …
Procedure for Downloading the PDF (Docx) Material
Contingency Analysis of the Eastern Part of Nigeria Grid Network (330Kv) Via Load Flow Using NEPLAN can be downloaded by requesting the full set of materials at the project or seminar cost. The document will be sent via Microsoft Word (MS-Word) format via WhatsApp (e-mail) following payment confirmation.
Seminar Material Cost ₦3,000 | Project Material Cost ₦5,000 |
Request Complete Material
![]() | Click here to request the Complete Material via WhatsApp including;
|
TABLE OF CONTENTSPRELIMINARY PAGES
- Title page
- Approval page
- Dedication
- Acknowledgement
- Table of Contents
- Abstract
- 1.0 Introduction
- 1.1 Literature Review
- 2.0 Transmission Line Modeling
- 2.1 Transmission Short Lines
- 2.2 Transmission Medium Lines
- 2.2.1 Nominal —T Representation
- 2.2.2 Nominal — N Representation
- 2.3 Transmission Long Lines
- 2.4 Modeling of Transformers
- 2.5 On-Load Tap-changing Transformers
- 2.6 Modeling of Synchronous Machine
- 3.0 Contingency Analysis of Nigeria 330KV Network Using NEPLAN 32
- 3.1 Introducing The Nigeria National Grid Network
- 3.2 Data's of Generators
- 3.3 Transmission Line Data
- 3.4 NELPAN Analysis Software
- 3.4.1 Node
- 3.4.2 Network Feeder
- 3.4.3 Transmission Line
- 3.4.4 Static VAR Compensation (SVC)
- 3.5 Result Analysis
- 3.5.1 Load
- 4.0 Single Mode Analysis of Nigeria 330kV Network Using NEPLAN
- 4.1 Bus
- 4.2 Load Flow Analysis
- 4.3 Admittance Matrix
- 4.4 Y — Bus Matrix
- 4.5 Load Flow Problem Formulation
- 4.6 Newton — Raphson Solution Method
- 4.7 Netwon — Raophson Methods using Polar Coordinates
- 4.8 Gauss — Seidel Method for Load Flow Studies
- 4.9 Comparison of Load Flow Method
- 5.0 Conclusion
- 5.1 Recommendation
REFERENCES
Disclaimer for Complete Material Utilization
The displayed research work titled "Contingency Analysis of the Eastern Part of Nigeria Grid Network (330Kv) Via Load Flow Using NEPLAN" is stated as a research guideline towards accomplishing your assigned project / seminar research work. All the research materials on this website are ONLY for research purposes and should be used as a guideline in developing your research work. For no reason should you copy word for word as projectlist.com.ng will not be liable for any who copied the material. By ordering the complete research guideline, it signifies that you've accepted our terms of service.
PRELIMINARY PAGES
- Title page
- Approval page
- Dedication
- Acknowledgement
- Table of Contents
- Abstract
- 1.0 Introduction
- 1.1 Literature Review
- 2.0 Transmission Line Modeling
- 2.1 Transmission Short Lines
- 2.2 Transmission Medium Lines
- 2.2.1 Nominal —T Representation
- 2.2.2 Nominal — N Representation
- 2.3 Transmission Long Lines
- 2.4 Modeling of Transformers
- 2.5 On-Load Tap-changing Transformers
- 2.6 Modeling of Synchronous Machine
- 3.0 Contingency Analysis of Nigeria 330KV Network Using NEPLAN 32
- 3.1 Introducing The Nigeria National Grid Network
- 3.2 Data's of Generators
- 3.3 Transmission Line Data
- 3.4 NELPAN Analysis Software
- 3.4.1 Node
- 3.4.2 Network Feeder
- 3.4.3 Transmission Line
- 3.4.4 Static VAR Compensation (SVC)
- 3.5 Result Analysis
- 3.5.1 Load
- 4.0 Single Mode Analysis of Nigeria 330kV Network Using NEPLAN
- 4.1 Bus
- 4.2 Load Flow Analysis
- 4.3 Admittance Matrix
- 4.4 Y — Bus Matrix
- 4.5 Load Flow Problem Formulation
- 4.6 Newton — Raphson Solution Method
- 4.7 Netwon — Raophson Methods using Polar Coordinates
- 4.8 Gauss — Seidel Method for Load Flow Studies
- 4.9 Comparison of Load Flow Method
- 5.0 Conclusion
- 5.1 Recommendation
REFERENCES
Disclaimer for Complete Material Utilization
The displayed research work titled "Contingency Analysis of the Eastern Part of Nigeria Grid Network (330Kv) Via Load Flow Using NEPLAN" is stated as a research guideline towards accomplishing your assigned project / seminar research work. All the research materials on this website are ONLY for research purposes and should be used as a guideline in developing your research work. For no reason should you copy word for word as projectlist.com.ng will not be liable for any who copied the material. By ordering the complete research guideline, it signifies that you've accepted our terms of service.
Frequently Asked Questions (FAQ)
Can this topic “Challenges and Prospects of Initiating Small Scale Companies in Ekiti State” be used for Business Administration and Management (BAM) Project?
Yes it can be utilized for research — The study was carried out to investigate the Challenges and Prospects of Initiating Small Scale Companies in Ekiti State. In achieving this aim, the following specific objectives were laid out to appraise the issue of risk of under capitalization and related this to the reluctance of proprietors to bring in partners or adequate financing and analyze the inability of the owned-manager to acknowledge their own weakness and tap the resources of talents of employees. Investigation revealed that the issues of inadequate financing usually derive from inadequate proprietorship equity participation. A strong capital base and financial outlook are required for a successful business. The problems of facing small-medium scale enterprises in Nigeria are not insurmountable since Nigeria is well placed to …
Can the material for “The Suitability of Health Education in the Control of Communicable Disease Spread in Nigeria Industrial Diseases Among Pre-School Age Children (1-5 Years)” be used as a guide for Education Project?
Yes it can be used — The paper discussed the causes, the suitability of health education in the control of communicable disease spread in Nigeria industrial diseases among pre-school age children (1-5 years). It focuses on the pre-school age children because of the existence of six killer diseases and the peculiarity of children’s level of exposure to communicable diseases especially during the outdoor game. Recommendations were made on management and control of communicable diseases. These include public enlightenment, proper hygiene of food, the environment and the general body. …
Can the material for “The Knowledge and Practice of Contraception among Male Adolescent Students” be used as a guide for Sociology Project?
Yes it can be used — Contraceptives are drugs or device used to prevent a woman from being pregnant and also used to protect men and women from sexually transmitted diseases. How can this be driven home is truth to our adolescences, utilized to reduce our teaming population and to reduce the diseases that are sexually transmitted. To assess the knowledge and improve the practice of this knowledge in our teaming adolescent population bearing in mind that a good beginning will eventually grow to a good end. The research design used in this report is descriptive design, utilizing questionnaire method to obtain information from the respondents for this project. A total of 133 (one hundred and thirty three) respondents were selected for this study to represent …
Can the material for “An Econometric Study of the Relative Impact of Monetary and Fiscal Policies on Industrial Output in Nigeria” be used as a guide for Economics Project?
Yes it can be used — This work/study investigated the relative impact of monetary and fiscal policies on industrial output in Nigeria for the period 1979 − 2008. An exposition of monetary and fiscal policies in Nigeria for the period under study (1979 − 2008) showed that monetary policies as against fiscal policies have been more pronounced in the economy due to the fact that these class of policies. The simple linear multiple regression analysis was adopted to estimate the level of significance of various monetary and fiscal policies instrument employed in Nigeria. Using manufacturing output is a proxy for industrial development; the estimated model reveals that these policies have not been responsible for the average changes in the industrial development. Instead, some other variables such as …
Is the topic “An Evaluation of Staff and Manpower Training and Development in Nigerian Organizations” recommended for Business Administration and Management (BAM) Project?
Yes it is highly recommended — This research work was designed to study training and development of employees in service organization. This study titled “An Evaluation of the effect of manpower training and development in service organization A case study of Nigeria Port Authority of Nigeria (NPA) Lagos zone is of the view of finding out the way by which training and development can be conducted. The objective of this study is to highlight the advantages of human resources training and development and recommended an appropriate measure that could help improve the current human resources training programmes. Relevant data for this research work were collected from both primary and secondary sources of data. A descriptive method was used for this study. The total population of the …
Can this topic “The Climate of Corruption by Labo Yari and I Do Not Come to You by Chance by Adaobi Nwaubani Tricia: Corruption Examination” be used for English Education Project?
Yes it can be utilized for research — Corruption refers to any act of practice which is deviant to the norm of a given society. It signifies a form of behaviour that departs from morality, ethics, tradition, law and civic virtue. The study was carried out to examine the Corruption in the Novels of Adaobi Nwaubani Tricia's I Do Not Come to You by Chance and Labo Yari's the Climate of Corruption. Investigation revealed that scholars have shown great deal of interest in the problems of corruption. Scholars have been equally pre-occupied with the work of literature and re-interpretation of the work by examining and re-examining of matters related to the social development of the country. Corruption has long been harmful and dangerous to the development of Nigeria …
Can the material for “The Role of Banking in Financing Small Scale Industries” be used as a guide for Banking and Finance (BF) Project?
Yes it can be used — It is to review what essentially constitutes small scale industries for an adequate discussion of the issue involved:- financing of small scale industries by the commercial banks. Often, there is no single criticism for classification of business unit as small scale. The central Bank of Nigeria for example defines small scale enterprises as any enterprise whose annual turnover is less than (N 500,000) five hundred thousand Naira as small scale. Furthermore the National Directorate of employment (NDE)defines it to include projects with capital investment of below five thousand Naira (N500) and a staff strength of three (3) persons. While the centre for management Development (CMD) gave the definition of small scale industry in the policy proposal it submitted to the federal …
Can the material for “Computerized Digital Cash Transaction System” be used as a guide for Computer Science (CS) Project?
Yes it can be used — The digital cash transaction system involves the use of digital pin codes to represent paper cash with transactions carried out during business transaction. The aim of the study is to Design and Implement a Digital Cash Transaction System. In achieving this aim the following objectives were laid out as follows to design and develop an application software that will Incorporate an effective security design into digital cash transaction system to prevent all forms of excess spending of available money in owner’s account and Aids fast synchronization during verification of account which is necessary. The motivation that led to the design of the proposed system is that the current process of cash receipt generation is being operated manually and due to …
Can the material for “Problems and Prospects of Local Government Finance in Nigeria” be used as a guide for Finance Project?
Yes it can be used — The study was carried out to determine the Problems and Prospects of Local Government Finance in Nigeria with reference to Nsukka Local Government Area, Enugu State. In achieving this aim, the following specific objectives were laid out to identify the major causes of these maladies in the financial system of the local government and examine the various instruments of management and control of the local government finances. Investigation revealed that finance and accounting in local governments is probably more complex, than in any other part of the public sector. In Nigeria, the inability of local governments to raise adequate funds and keep accurate accounts to sponsor its expenditure and activate grassroots development has been discovered as one of the major …
Can the material for “Program Result Checker” be used as a guide for Computer Science (CS) Project?
Yes it can be used — Program result checking is a system that checks program source code or programming assignments. The major problems regarding the program result checker using web based programming language such as HTML, CSS, and JavaScript as a case study which include: delays in the release of results which is as a result of syntax error, logical error, or semantic error, errors inherent in handling and assessment of source code program, and cumbersome response systems. The aim of the study is to design application software that will totally or partially eradicate the problems of the existing program result checker system. In achieving this aim, the following objectives were considered to: develop a software that will facilitate the early release of program results, handle …