
DESIGN AND IMPLEMENTATION OF PROJECT MANAGEMENT SYSTEM
ABSTRACT
This project is aimed at developing a web-based system, which manages the activity of “Student Project Management system”. This system will manage the database and maintain a list of all student or groups of student that have registered as a finalist in this site, and for those students that been shortlisted who have passed the eligibility criteria as set by the lecturer/supervisor. The programming Language used is Microsoft ASP.NET. This Language was chosen because of its object oriented features and class libraries for developing online applications.
CHAPTER ONE
1.0 Introduction
One of the recent advances in the world of information technology is the rapid development of communication which has turned the world into a global village, we can send mails electronically (e-mail), search for information (www), buy goods online (e-commerce), withdraw/ transfer money (e-banking), school online (e-learning); this has affected the society positively to a great extent, as a result, computerization of project management should not be exempted in this revolution.
Project Management (PM) is the discipline of planning, organizing, and managing resources to bring about the successful completion of a specific project goals and objectives. A project is a finite endeavor having a specific start and completion date, undertaken to create a unique product or service which brings about beneficial change or added value. This finite characteristic of a project stand in sharp contrast to processes, or operations, which are permanent or semi-permanent functional works to repetitively produce the same product or service. In practice, the management of these two systems is often found to be quite different, and as such requires the development of distinct technical skills and the adoption of separate management philosophy, which is the subject of this study.
The primary challenge of project management is to achieve all of the project goals and objectives while adhering to classic project constraints usually scope, quality, time and budget. The secondary and more ambitious challenge is to optimize the allocation and integration of inputs necessary to meet pre-defined objectives. A project is a carefully defined set of activities that use resources (money, people, materials, energy, space, provisions, communication, motivation, etc.) to achieve its goals and objectives.
Project management is quite often the province and responsibility of an individual project manager. This individual seldom participates directly in the activities that produce the end result, but rather strives to maintain the progress and productive mutual interaction of various parties in such a way that overall risk of failure is reduced. A project manager is often a client representative and has to determine and implement the exact needs of the client, based on knowledge of the firm they are representing. The ability to adapt to the various internal procedures of the contracting party, and to form close links with the nominated representatives, is essential in ensuring that the key issues of cost, time, quality, and above all, client satisfaction, can be realized.
Regardless of the approach employed, careful consideration needs to be given to clarify surrounding project objectives, goals, and importantly, the roles and responsibilities of all participants and stakeholders. In software development, this approach is often known as “waterfall development”, i.e., one series of tasks after another in linear sequence. In software development many organizations have adapted the Rational Unified Process (RUP) to fit this methodology, although RUP does not require or explicitly recommend this practice. Waterfall development can work for small tightly defined projects, but for larger projects of undefined or unknowable scope, it is less suited.
The Cone of Uncertainty explains some of this as the planning made on the initial phase of the project suffers from a high degree of uncertainty. This becomes specially true as software development is often the realization of a new or novel product, this method has been widely accepted as ineffective for software projects where requirements are largely unknowable up front and susceptible to change. While the names may differ from industry to industry, the actual stages typically follow common steps to problem solving “defining the problem, weighing options, choosing a path, implementation and evaluation.”
1.1 Background Of Study
In many tertiary institutions in the country, students seek a project in a given field of specialty as part of the upper level of their degree programme. Usually, a project can be filled by at most one student, though in some cases a project is suitable for more than one student to work on simultaneously. To give students something of a choice, there should be as wide a range of available projects as possible, and in any case the total number of project places should not be less than the total number of students. Typically a lecturer will also offer a range of projects, but does not necessarily expect that all will be taken up.
Each student has preferences over the available projects that he/she finds acceptable, whilst a lecturer will normally have preferences over the students that he/she is willing to supervise. There may also be upper bounds on the number of students that can be assigned to a particular project, and the number of students that a given lecturer is willing to supervise. In this paper we consider the ways of allocating student project in our various institutions.
1.2 Statement Of The Problem
It has become widely recognized that manual storage of student projects has inherent problems. Looking at our University, students submit hard copies of projects to their various departmental libraries. The disadvantages of this manual method are as listed below;
- Possibility of repeating project topics without detection by a project supervisor
- Records of project topics carried out by a student are stored in the departmental library for a long time which occupies valuable office space
- Projects are prone to loss due to natural disasters such as fire outbreak.
- Difficulty in searching for project topics already done
- Projects cannot be accessed outside the University, that is, it has the problem of geographical barrier.
- Backing up projects becomes a problem since more space will be employed.
Faced with the need to organize projects, the proposed system for management of student projects is unique and totally innovative in its integrated approach. Its functionality of making project storage easier makes it called for. The system to be developed makes use of rich internet technology to replace desktop application with web application running on a remote server. The system shares the advantage of both web application and desktop application, and removes the most disadvantages of both.
1.3 Objectives Of The Study
The aim of this research study is to develop a student project management system for this University to effectively manage students’ research projects.
The objectives of this research study are as listed below;
- To design a database for the system
- To implement the system using MySQL and PHP
- To test the student project management system.
1.4 Significance Of The Study
The significance of this study is to move from manual documentation of projects to computerized documentation of projects for easy retrieval, storage, accuracy and security. This research work will offer the following advantages to the various departments in the University of Port Harcourt;
1. Reduced Storage:
The cost of commercial property and the need to store documentation for e.g. retrieval, regulatory compliance means that paper based project storage competes with people for space within an organisation. Scanning projects and integrating them into a project management system can greatly reduce the amount of prime storage space required by paper.
2. Flexible Indexing:
Indexing paper in more than one way can be done, but it is awkward, costly and time-consuming. Images of projects stored within a project management system can be indexed in several different ways simultaneously.
3. Improved, faster and more flexible search:
Project Management Systems can retrieve files by any word or phrase in the document − known as full text search − a capability that is impossible with paper.
4. Improved Security:
A project management system can provide better, more flexible control over sensitive projects. Many project management system solutions allow access to projects to be controlled at the folder and/or document level for different groups and individuals. Paper projects stored in a traditional filing cabinet or filing room does not have the same level of security i.e. if you have access to the cabinet you have access to all items in it.
5. Disaster Recovery:
A project management system provides an easy way to back-up projects for offsite storage and disaster recovery providing failsafe archives and an effective disaster recovery strategy. Paper is a bulky and expensive way to back-up records and is vulnerable to fire, flood, vandalism and theft.
6. No Lost Files:
Lost projects can be expensive and time-consuming to replace. Within a Project Management System, imaged projects remain centrally stored when being viewed, so none are lost or misplaced. New documents are less likely to be incorrectly filed and even if incorrectly stored can be quickly and easily found and moved via the full-text searching mechanisms.
7. Digital Archiving:
Keeping archival versions of projects in a project management system helps protect paper documents that still have to be retained, from over-handling.
1.5 Scope Of The Study
The scope of this project covers Students’ Research Project Management in our University. This scope will be achieved in the following areas;
- Keeping track of research projects both approved and completed
- Harnessing the energy of staff at a faster pace
- Managing complex changes in an organized way
- Retrieving data as at when required.
CHAPTER TWO
2.0 Literature Review
2.1 Introduction
The review of relevant literature is the main topic of this chapter. A literature review covers theoretical and methodological contributions to a certain issue in addition to the state of knowledge at the time of writing. It provides information about the state of the art in relation to the subject you are writing about. It examines the body of work on the chosen subject. The literature evaluation in this study comprises the …
Procedure for Downloading the PDF (Docx) Material
Design and Implementation of Project Management System can be downloaded by requesting the full set of materials at the project or seminar cost. The document will be sent via Microsoft Word (MS-Word) format via WhatsApp (e-mail) following payment confirmation.
Seminar Material Cost ₦3,000 | Project Material Cost ₦5,000 |
Request Complete Material
![]() | Click here to request the Complete Material via WhatsApp including;
|
TABLE OF CONTENTSPRELIMINARY PAGES
- Title page
- Approval page
- Dedication
- Acknowledgement
- Table of Contents
- Abstract
INTRODUCTION
- 1.0 Introduction
- 1.1 Background …
- ⋮
LITERATURE REVIEW
- 2.1 Introduction
- ⋮
CHAPTER THREE
SYSTEM ANALYSIS AND DESIGN
- 3.1 Methodology Adopted
- 3.1.1 Problem Identification Using SSADM
- 3.2 Analysis of the Existing System
- 3.2.1 Dataflow of the Existing System
- 3.2.2 Disadvantages Of The Existing System
- 3.2.3 Weakness of the existing System
- 3.3 Feasibility Study
- 3.3.1 Economic Feasibility
- 3.3.2 Technical Feasibility
- 3.3.3 Operational Feasibility
- 3.4 Analysis of the Proposed System
- 3.4.1 Data Flow Diagram of the Proposed System
- 3.4.2 Advantages of the Proposed System
- 3.4.3 Justification of the Proposed System
- 3.5 Functional Requirements
- 3.5.1 Use Case Diagram Of The Admin / User Privileges
- 3.6 Data Requirements
- 3.7 High Level Model of the Proposed System
CHAPTER FOUR
SYSTEM DESIGN AND IMPLEMENTATION
- 4.1 Objectives of the Design
- 4.2 Cohesion and Decomposition High level Model
- 4.3 Control Center / Overall Dataflow Diagram
- 4.3.1 Proposed System Operation Flowchart
- 4.4 System Specification and Design
- 4.4.1 Input and Output Specification
- 4.4.2 Database Specification and Design
- 4.4.3 Data Dictionary
- 4.5 Choice and Justification of Programming Language
- 4.6 Program Documentation
- 4.7 Implementation Techniques
- 4.7.1 System Testing
- 4.8 Programming Module Specification
- 4.8.1 Installation
- 4.9 Computer Hardware Minimum Requirement
- 4.10 Software Requirement
- 4.11 Personnel / User Training
- 4.12 File Maintenance Module
CHAPTER FIVE
SUMMARY, CONCLUSION AND RECOMMENDATION
- 5.1 Introduction
- 5.2 Summary
- 5.3 Conclusion
- 5.4 Recommendation
REFERENCES
APPENDIX A - “SOURCE CODE”
APPENDIX B - “OBJECT PROGRAM”
Disclaimer for Complete Material Utilization
The displayed research work titled "Design and Implementation of Project Management System" is stated as a research guideline towards accomplishing your assigned project / seminar research work. All the research materials on this website are ONLY for research purposes and should be used as a guideline in developing your research work. For no reason should you copy word for word as projectlist.com.ng will not be liable for any who copied the material. By ordering the complete research guideline, it signifies that you've accepted our terms of service.
PRELIMINARY PAGES
- Title page
- Approval page
- Dedication
- Acknowledgement
- Table of Contents
- Abstract
INTRODUCTION
- 1.0 Introduction
- 1.1 Background …
- ⋮
LITERATURE REVIEW
- 2.1 Introduction
- ⋮
CHAPTER THREE
SYSTEM ANALYSIS AND DESIGN
- 3.1 Methodology Adopted
- 3.1.1 Problem Identification Using SSADM
- 3.2 Analysis of the Existing System
- 3.2.1 Dataflow of the Existing System
- 3.2.2 Disadvantages Of The Existing System
- 3.2.3 Weakness of the existing System
- 3.3 Feasibility Study
- 3.3.1 Economic Feasibility
- 3.3.2 Technical Feasibility
- 3.3.3 Operational Feasibility
- 3.4 Analysis of the Proposed System
- 3.4.1 Data Flow Diagram of the Proposed System
- 3.4.2 Advantages of the Proposed System
- 3.4.3 Justification of the Proposed System
- 3.5 Functional Requirements
- 3.5.1 Use Case Diagram Of The Admin / User Privileges
- 3.6 Data Requirements
- 3.7 High Level Model of the Proposed System
CHAPTER FOUR
SYSTEM DESIGN AND IMPLEMENTATION
- 4.1 Objectives of the Design
- 4.2 Cohesion and Decomposition High level Model
- 4.3 Control Center / Overall Dataflow Diagram
- 4.3.1 Proposed System Operation Flowchart
- 4.4 System Specification and Design
- 4.4.1 Input and Output Specification
- 4.4.2 Database Specification and Design
- 4.4.3 Data Dictionary
- 4.5 Choice and Justification of Programming Language
- 4.6 Program Documentation
- 4.7 Implementation Techniques
- 4.7.1 System Testing
- 4.8 Programming Module Specification
- 4.8.1 Installation
- 4.9 Computer Hardware Minimum Requirement
- 4.10 Software Requirement
- 4.11 Personnel / User Training
- 4.12 File Maintenance Module
CHAPTER FIVE
SUMMARY, CONCLUSION AND RECOMMENDATION
- 5.1 Introduction
- 5.2 Summary
- 5.3 Conclusion
- 5.4 Recommendation
REFERENCES
APPENDIX A - “SOURCE CODE”
APPENDIX B - “OBJECT PROGRAM”
Disclaimer for Complete Material Utilization
The displayed research work titled "Design and Implementation of Project Management System" is stated as a research guideline towards accomplishing your assigned project / seminar research work. All the research materials on this website are ONLY for research purposes and should be used as a guideline in developing your research work. For no reason should you copy word for word as projectlist.com.ng will not be liable for any who copied the material. By ordering the complete research guideline, it signifies that you've accepted our terms of service.
Frequently Asked Questions (FAQ)
Can the material for “The Impact of Tourism in Alleviating Poverty in Nigeria” be used as a guide for Sociology Project?
Yes it can be used — Tourism is one the largest and fastest growing industries in the world. It is an increasingly important source of income, employment and wealth in many countries. Its rapid expansion has, however, had detrimental environmental (and Scio- cultural) impacts on many regions. In this research I examine the main economic benefits and environmental impacts of tourism and review the development of the international sustainable tourism agenda. While much of international tourism activity takes place with the developed world, this research work will focus on the (economic) development of the industry in developing countries like Nigeria (Owerri Imo State) to be précised, I conclude that new approaches to sustainable tourism development in these countries should not only set to minimize local environmental impact, …
Can this topic “Timely Release of Result and Academic Performance of Student in Business Education” be used for Business Education Project?
Yes it can be utilized for research — Business education is an aspect of vocational and technical education. It is a specialized programme of instruction designed to provide individuals with knowledge, skill, and attitude for occupational work and advancement. The research provides an appraisal of timely release of result and its effect on academic performance of student in business education. It appraises the nature of academic result and determines the importance of its timely release. It stresses the effect on students’ academic performance and as measure for corrective and early preparation of studies. The research design used in this report is descriptive design, utilizing questionnaire method to obtain information from the respondents for this project. A total of 200 (two hundred) respondents were selected for this study to …
Can the material for “Polygamy and Family Size as a Determinants of Students’ Academic Performance in Selected Secondary Schools” be used as a guide for Education Project?
Yes it can be used — The study examines the effect of polygamy and large family size on students’ academic performance in selected secondary schools in Ikorodu Local Government Area of Lagos State. The descriptive research survey was employed in the assessment of the respondents’ opinions with the aid of a questionnaire. A total of 350 (three hundred and fifty) respondents made up (175 males and 175 females) were selected to represent the entire population of the study. Four (4) hypotheses were tested in this study, with the aid of the independent t-test statistical tool for hypotheses one, three and four, while hypothesis two was tested with the use of the Pearson Product Moment Correlational Coefficient statistical instrument. All the hypotheses were tested at 0.05 level of …
Can this topic “Impact of Lesson Plan on the Teaching and Learning of Biology in Secondary Schools” be used for Biology Education Project?
Yes it can be utilized for research — A lesson plan can be regarded as a well thought-out, orderly and sequential arrangement of the lesson on paper. It is the guideline by which the teacher teaches his lesson. The study was carried out to scrutinize the Impact of Lesson Plan on the Teaching and Learning of Biology using Secondary Schools in Ado-Ekiti, Ekiti State. In achieving this aim, the following specific objectives were laid out to find out the impacts of lesson planning on teaching and learning process, determine the difference in performance of students taught with lesson plan and communication skill and those taught without lesson plan and communication skill and determine the difference in performance of students taught with lesson plan and the use of examples …
Can the material for “Statistical Analysis on Fertility and Mortality Rate in Osogbo Local Government Between the Year (2006 – 2009)” be used as a guide for Nursing (Science) Project?
Yes it can be used — This project has the aim of studying the fertility and mortality rate in Osogbo Local Government. The study employed the use of statistical methods like moving Average, least square and Demography analysis. The result of the analysis shows that there is relationship between fertility and mortality. It is also the predictive power of an increase. Therefore, it is recommended that government should provide more medical facilities for easy delivery. …
Can the material for “Factors Associated with Health Seeking and Prevention of Human. Papilloma Virus Infection” be used as a guide for Public Health Project?
Yes it can be used — The purpose of this study is to examine the factors associated with health seeking and prevention of human papilloma virus infection. Three (3) research questions and hypotheses were raised to solve the research problems. The research employs exploratory, survey and descriptive research methods using quantitative and qualitative analysis. The population of this study comprises of all the female students at Babcock University High School Ilishan remo, Ogun State. The sample size of this research comprises of two hundred and twenty (220) respondents using random sampling technique. The data employed for this study is the primary data obtained through the use of questionnaire. Findings revealed that awareness and knowledge on HPV, cervical cancer and vaccination were generally fairly good and marked by …
Can the material for “The Role of Mortgage Institution in Housing in Nigeria” be used as a guide for Banking and Finance (BF) Project?
Yes it can be used — This research work focuses on the “The role of mortgage institution in housing delivery in Nigeria. A case study of Anambra Home Limited (2006-2014). The study aimed at finding out how to reduce the cost of housing in Nigeria and to find out how to deal with the problem of over population in Nigeria effectively so that there will be an effective housing delivery. The instrument used in this research work is questionnaire. In analyzing the data collected the researcher checked all the responses to ensue that each question was well responded. I found out that over population is one of the major problem of housing delivery in Nigeria since Nigeria population seek to rise every day and the government …
Can the material for “Design and Implementation of a Market Survey Reporting System” be used as a guide for Computer Science (CS) Project?
Yes it can be used — Market survey is a pivotal part of the marketing process, it helps businesses identify consumer needs and wants so a company can develop and promote products more successfully. The aim of the study is to Design and Implement a Market Survey Reporting System that will report and evaluate market survey to enhance company status in a competitive marketing. In achieving this aim, the following specific objectives were laid out to design and develop an application software that will: deliver quality goods required by the customer the target of achieving maximum customer satisfaction at minimum possible cost, provide important information to identify and analyze the market size, consumers behaviour and periodic sales evaluation, ensure maximum utilization of any available resources in …
Can this topic “Design and Implementation of Big Data Application to Health Care” be used for Computer Science (CS) Project?
Yes it can be utilized for research — Big Data is a the generic term for data sets of structured and unstructured data that are extremely large and complex so that the traditional software, algorithm, and data repositories are inadequate to collect, process, analyze, and store the information. The aim of the study is to design and implement a Big Data Application to Health Care using ESUT Teaching Hospital as a case study. In achieving this aim, the following specific objectives were set out as follows to develop an application software that will enable the care providers search and browse medical patient record without delay, store big data of patient medical file record in a database that will enable care providers to be able to locate patient files …
Is the topic “Application of Potential Transformer in Power System Protection” recommended for Mechanical Engineering Project?
Yes it is highly recommended — Transformer in Power system protection is a branch of electrical power engineering that deals with the protection of electrical power systems from faults through the disconnection of faulted parts from the rest of the electrical network. The aim of the study is to scrutinize the Application of Potential Transformer in Power System Protection. In achieving this aim, the following specific objectives were laid out to find out the real life application of Potential Transformer in Power System Protection, keep the power system stable by isolating only the components that are under fault, whilst leaving as much of the network as possible still in operation, and proffer solution to the drawbacks of the existing Transformer in Power System Protection. This study …