CONSTRUCTION OF A CIRCUIT FOR FOUR-WAY TRAFFIC LIGHTS
ABSTRACT
The study was conducted to design and construct a Four Way Traffic Light Control Circuit. In achieving this aim, the following specific objectives were laid out to build a prototype four-way traffic light control circuitry and construct a Four Way Traffic Light Control Circuit that will efficiently and effectively control the traffic light for twenty-four hours. This research work has been aimed at efficient means of controlling the traffic effectively for twenty-four hours. As the world is growing technologically more and more vehicles jump into the public road adding to the already existing number. Consequently, more efficient way of controlling the traffics becomes more desirable as compared to the obsolete way of using the traffic personnel's. The design of this traffic light control is grouped basically into three; digital logic design, the power circuit and the power supply design. The digital logic design is based on integrated circuit which happens to be the modern way of designing digital systems, the power circuit design is aimed at lighting the different LEDS as and when due, while the power supply design strives to achieve a constant 8V dc supply for powering the circuit. For this work, the frame with the LEDS mounted on it has been constructed, the driven circuit was implemented and the entire system enclosed in the smoothened frame. The realized work was tested and guaranteed to give a firmly good level of performance.
CHAPTER ONE
1.1 Introduction
Traffic lights, also known as traffic lamps, traffic signals, stoplight, stop-and-go lights semaphore or robots, are signaling devices positioned at pedestrian crossings, road intersections, and other locations to control competing flows of traffic. Traffic lights have installed in most cities around the world to control the flow of traffic. It assign the right of way to road users by the use of lights in standard colors (Red - Yellow - Green), using a universal color code (and a precise sequence, for color blind). Traffic lights are used at busy intersections to more evenly apportion delay to the various users. The increasing amount of traffic in the cities has a large impact on the congestion and the time it takes to reach a certain destination. The traffic light system is made up of all the components and circuits used to realize to lighting effect at the Output.
As a prelude to other parts of this study, this chapter will discuss the background upon which this study was initiated, the statement of problems that led to this study, the Aim and Objectives of the study. Others are Significance of the study, Scope of work, Limitations of the Study and Definition of technical terms.
1.2 Background of Study
In the ever fast-growing world of business and technology today, there has become an increasing column of vehicles on every road in different place of the world. Traffic control light has become a very effective tool for sequential control of the teaming number of vehicles on the road to avert what would have been a recurrent saga of ghastly accidents at the junctions. There have been many ways of achieving this, uppermost among these being the employment of electronic monitoring circuits that which is controlled by presto clock.
In developed countries, the employment of traffic personnel who would be jumped up and down at the centres of the junction just for the motorists to acknowledge their rigorous signs has long come of age. In developing countries where 24 hours traffic flow is involved, many societies are adopting the usage of the traffic light control. The advantage offered by this method of traffic control cannot be over emphasized. For one, it offers a more advanced technology that is less prone to miscalculation and its regrettable occurrence. They stand out better at night, then offer illumination to the immediate surroundings which become important for security purpose and in general add to their entire aesthetic beauty of night life.
The technology behind the design may vary from place to place, but the fact remains that in all cases an electronic (logic) circuit is made to control a power circuit. The electronic logic circuit is normally composed of the basic digital components of electronic design which includes oscillators, timers, counters, decoders, microprocessors, etcetera, while the power circuit includes the lamps and the drivers circuits. The digital circuit is designed to give an output commensurate to the design choice. The power supply unit is designed to generate a steady supply voltage which is used to power the logic circuit.
Traffic lights are signaling devices that are positioned at road intersections, pedestrian crossings or two or more roadways to control the competing flows of vehicle and human traffic in an orderly manner without which the busy roads would be chaotic. This is achieved by providing a visual indication to drivers when to proceed, when to slow down, when to stop and at times when to take a turn. Traffic lights are installed in almost all the cities in the world to control the flow of traffic. They are used to assign the right of way to road users by the use of lights in standard colours (Red Amber Green). They are very useful at busy intersections which are used to evenly apportion delay to the various users on different lanes. These signals may be operated manually or by a simple timer which allows traffic to flow on one roadway for a fixed period of time, and then on the other road-way for another fixed period of time before repeating the cycle.
The output consists of a series of lamps which are expected to light in a particular sequence depending on the design. By the logic circuit design, the lamps are made to come up in a particular sequence depending on the design with each colour meaning different motional status of the vehicles in that column.
Therefore, in Nigeria where the research was carried out, the activities that was conducted is to Design and Construct a Four Way Traffic Light Control Circuit.
1.3 Statement of Problems
Investigation revealed that the need for traffic control started even before the invention of automobiles. Then the traffic consisted of wagons, horse carts, bicycles and pedestrians only, but this on its own caused problems at busy road intersections. To control the traffic, police officers were assigned at the intersections to control the flow of traffic.
1.4 Aim and Objectives of Study
The aim of the study is to Design and Construct a Four Way Traffic Light Control Circuit. In achieving this aim, the following specific objectives were laid out as follows:
- To construct a Four Way Traffic Light Control Circuit that will efficiently and effectively control the traffic light for twenty-four hours.
- To build a prototype four-way traffic light control circuitry.
- To design a system that will direct vehicles in order to illuminating the environment in the night
Going by the rapid advancement in technology all over the world, the need for better ways of solving a problem keep coming up every day. Necessity is the mother of invention. It has become imperative for societies, companies, industries, business ventures, clubs etc to offer 24 hour service, hence thereby has to be a way of controlling the teaming column of vehicles which convey both individuals and goods to different destinations of that type.
The most elegant way of directing the motorists is by the use of traffic light control. This type of control serves a dual purpose. In the day type it directs the vehicles, whereas it turns out to additionally illuminating the environment in the night, so that at very far distance, its effect is noticeably felt, conveying its message to an oncoming vehicle very far from the point.
1.5 Significance of Study
This study will be of immense benefit to Road Safety Officers, Engineering student and other researchers who intend to know more on this study and can also be used by non-researchers to build more on their research work. This study contributes to knowledge and could serve as a guide for other study.
1.6 Scope of Study
The scope of the research is focused on Design and Construction of Four Way Traffic Light Control Circuit.
1.7 Limitations of the Study
During the course of this study, many things militated against its completion, some of which are:
- Time Constraint: The time frame given to accomplish this project was very short due to school academic calendar and it was carried out under pressure which made the researcher not to implement some necessary features.
- Research material: availability of research material is a major setback to the scope of the study.
- Frequent power failure: This made the researcher append more money on fuel to ensure sustainable power.
- Financial Constraint: Insufficient fund tends to impede the efficiency of the researcher in sourcing for the relevant materials, literature or information and in the process of data collection.
1.8 Methodology
Priority was given to the nature of the junction and how far away they are at different seasons of the year. A lot of design research was carried out on digital logic design and choice of digital families. Data books were consulted to make the most suitable choice of components at the most reasonable cost.
After the design, a market survey was conducted and some components used in the design were not obtainable in the market. Hence, alternative components had to be used and the circuit redesigned. The subsequent stage involves physically realizing the design work, constructing and packaging the entire circuitry on the frame. Finally, he work was given a fine finish and tested.
CHAPTER TWO
2.0 Literature Review
2.1 Introduction
The review of relevant literature is the main topic of this chapter. A literature review covers theoretical and methodological contributions to a certain issue in addition to the state of knowledge at the time of writing. It provides information about the state of the art in relation to the subject you are writing about. It examines the body of work on the chosen subject. The literature evaluation in this study comprises the …
Procedure for Downloading the PDF (Docx) Material
Construction of a Circuit for Four-Way Traffic Lights can be downloaded by requesting the full set of materials at the project or seminar cost. The document will be sent via Microsoft Word (MS-Word) format via WhatsApp (e-mail) following payment confirmation.
Seminar Material Cost ₦3,000 | Project Material Cost ₦5,000 |
Request Complete Material
![]() | Click here to request the Complete Material via WhatsApp including;
|
TABLE OF CONTENTSPRELIMINARY PAGES
- Title page
- Approval page
- Dedication
- Acknowledgement
- Table of Contents
- Abstract
INTRODUCTION
- 1.1 Introduction
- 1.2 Background of Study
- 1.3 Statement of Problems
- 1.4 Aim and Objectives of Study
- 1.5 Significance of Study
- 1.6 Scope of Study
- 1.7 Limitations of the Study
- 1.8 Methodology
LITERATURE REVIEW
- 2.1 Introduction
- 2.2 Conceptual Review of Traffic Light System
- 2.3 The Power Supply Unit
- 2.3.1 The Transformer
- 2.3.2 The Rectifier
- 2.3.3 The Filter
- 2.3.4 The Voltage Regulator
- 2.4 The Digital Logic Circuit
- 2.4.1 The Oscillator
- 2.4.2 The Counter
- 2.4.3 The Decoder
- 2.5 The Logic Gates
- 2.5.1 The Power Circuit
- 2.5.2 The Booster/Amplifier Stage
- 2.5.3 The Lamp/LEDs
MATERIALS AND METHODS
- 3.1 Introduction
- 3.2 The Traffic Light Control Design and Construction
- 3.3 The Power Supply Design Specifications
- 3.3.1 The Transformer
- 3.3.2 Rectifier
- 3.3.3 The Filter Capacitor
- 3.3.4 The Voltage Regulator
- 3.4 The Digital Logic Design
- 3.4.1 The Oscillator
- 3.4.2 The 4017 Decade Counter
- 3.5 The Output Logic Gate Circuit and the Power Circuit
SYSTEM IMPLEMETATION AND COST ANALYSIS
- 4.1 Introduction
- 4.2 Problem Encountered
- 4.3 Construction and Testing
- 4.4 Cost Analysis
SUMMARY, CONCLUSION AND RECOMMENDATION
- 5.1 Introduction
- 5.2 Summary of Findings
- 5.3 Conclusion
- 5.4 Recommendation
REFERENCES
Disclaimer for Complete Material Utilization
The displayed research work titled "Construction of a Circuit for Four-Way Traffic Lights" is stated as a research guideline towards accomplishing your assigned project / seminar research work. All the research materials on this website are ONLY for research purposes and should be used as a guideline in developing your research work. For no reason should you copy word for word as projectlist.com.ng will not be liable for any who copied the material. By ordering the complete research guideline, it signifies that you've accepted our terms of service.
PRELIMINARY PAGES
- Title page
- Approval page
- Dedication
- Acknowledgement
- Table of Contents
- Abstract
INTRODUCTION
- 1.1 Introduction
- 1.2 Background of Study
- 1.3 Statement of Problems
- 1.4 Aim and Objectives of Study
- 1.5 Significance of Study
- 1.6 Scope of Study
- 1.7 Limitations of the Study
- 1.8 Methodology
LITERATURE REVIEW
- 2.1 Introduction
- 2.2 Conceptual Review of Traffic Light System
- 2.3 The Power Supply Unit
- 2.3.1 The Transformer
- 2.3.2 The Rectifier
- 2.3.3 The Filter
- 2.3.4 The Voltage Regulator
- 2.4 The Digital Logic Circuit
- 2.4.1 The Oscillator
- 2.4.2 The Counter
- 2.4.3 The Decoder
- 2.5 The Logic Gates
- 2.5.1 The Power Circuit
- 2.5.2 The Booster/Amplifier Stage
- 2.5.3 The Lamp/LEDs
MATERIALS AND METHODS
- 3.1 Introduction
- 3.2 The Traffic Light Control Design and Construction
- 3.3 The Power Supply Design Specifications
- 3.3.1 The Transformer
- 3.3.2 Rectifier
- 3.3.3 The Filter Capacitor
- 3.3.4 The Voltage Regulator
- 3.4 The Digital Logic Design
- 3.4.1 The Oscillator
- 3.4.2 The 4017 Decade Counter
- 3.5 The Output Logic Gate Circuit and the Power Circuit
SYSTEM IMPLEMETATION AND COST ANALYSIS
- 4.1 Introduction
- 4.2 Problem Encountered
- 4.3 Construction and Testing
- 4.4 Cost Analysis
SUMMARY, CONCLUSION AND RECOMMENDATION
- 5.1 Introduction
- 5.2 Summary of Findings
- 5.3 Conclusion
- 5.4 Recommendation
REFERENCES
Disclaimer for Complete Material Utilization
The displayed research work titled "Construction of a Circuit for Four-Way Traffic Lights" is stated as a research guideline towards accomplishing your assigned project / seminar research work. All the research materials on this website are ONLY for research purposes and should be used as a guideline in developing your research work. For no reason should you copy word for word as projectlist.com.ng will not be liable for any who copied the material. By ordering the complete research guideline, it signifies that you've accepted our terms of service.
Frequently Asked Questions (FAQ)
Can the material for “The Effect of Federal Expenditure and Money Supply on the Rate of Unemployment (1989-2000)” be used as a guide for Banking and Finance (BF) Project?
Yes it can be used — This study is motivated by the fact that federal expenditure and money supply as a tool on the rate of unemployment. But to which extent, these instrument have contributed either to worsen the problem of unemployment or alleviate it. To investigate this problem, two hypotheses were formulated as follows. Ho: There is no relationship between money supply and unemployment. Hi: There is no relationship between federal expenditure and unemployment. In testing the hypothesis, secondary data was used and analyzed using regression and correlation analysis as well as student t-test. The following are summary of the major findings from the analysis carried out in the study. Federal expenditure and money supply contributed little to the reduction on the rate unemployment between (1980-2000). The package of National directorate …
Can the material for “Management of Organizational Conflict in Government Agency” be used as a guide for Business Administration and Management (BAM) Project?
Yes it can be used — The cause of conflict, it’s consequences and the management of conflict in the Nigerian security printing and miniting company limited have been studied in this project. Survey questionnaires was adopted in collection of data. Respondents were drawn equally from all the departments of the company. Sample selection was by stratified probability sampling and it constitutes only the senior employees of the company. Data generator were analyzed using single percentage. Question were drawn is such a way that enabled the respondents the opportunity to express their consequences and ways it can be effectively managed. The result and findings of the study revealed that the causes of conflict in the Nigeria security, printing and miniting company limited was largely due to lack …
Is the topic “Teachers’ Perception of Their Public Image and It’s Influence on the Students’ Achievement in Physics” recommended for Education Project?
Yes it is highly recommended — This study examined how the teachers’ perception of their public image influences the Achievement of Secondary School Physics Students in Lagos, Nigeria. The research design adopted was quasi-experimental of the pretest − post-test non-randomized control group. Purposive sampling was used to obtain a sample of three co-educational secondary schools. Each school provided one S.S.I and S.S. II class for the study. Two instruments were used in the study, the PhysicsAchievement Test (PAT) to measure students’ achievement and Teachers questionnaire to train the teachers in the experimental groups. The instrument was pilot tested to ascertain reliability. Also, there was no significant effect of gender on students ‘achievement in Physics although, females did better than males. Finally, there was no significant interaction effect …
Can this topic “Design and Implementation of an Online Public Private Partnership System” be used for Computer Science (CS) Project?
Yes it can be utilized for research — Public private partnership (PPPs) is a form of cooperation between the public and private sectors. Its goals are to finance, build (reconstruction), operation and maintenance of the infrastructure and to provide public service through the infrastructure. Within the PPPs entities of public sector are partner and customers of the private sector from which the purchase services. In principle the private partner finances, builds, and operate the infrastructure and is enabled to provide respective service compensated by payment from the end-user (concession) or from the public partner. The substantial attribute of public private partnerships is the sharing of risks relating to build and operation of the infrastructure between the private and public partner and a long time contract. Regarding the fact …
Can the material for “Misuse of Power in Chinua Achebe’s Anthill of the Savannah and Chimammanda Adichie’s Purple Hibiscus” be used as a guide for Linguistics and Communication Project?
Yes it can be used — Over the ages, some persons or group of persons are known to misuse power to bully their subjects or subordinates. This unwholesome act gives rise to many literary works condemning the act. This work considers the misuse of power as portrayed by the novels Anthills of the Savannah and purple Hibiscus by Chinua Achebe and Chimmamanda Adichie respectively. Achebe in his novel shows the danger of pursuing power for power’s sake and also the impact of a dictator on a populace − the people of Kangan only suffer from Sam’s leadership. He represents the archetypal corrupted Nigerian leaders. Eugene Achike in purple Hibiscus is another character who abuses his patriarchal power over his family. Eugene is both a religious zealot and …
Can this topic “Assessment of Merger and Acquisition as a Survival Tool for Organization” be used for Business Administration and Management (BAM) Project?
Yes it can be utilized for research — Merger and acquisition has been widely acclaimed by scholars and professionals in business as the most desirable and effective strategy to revive the difficult situations facing Nigeria economic climate. The situation is so terrible that organizations had to turn around and adopt strategy to survive through this turbulent water. This research work has the objective undertaking to examines, analyze and evaluate the effectiveness of merger and acquisitions as a strategy for organizational survival in Nigeria and investigates whether it can result to economic of scale and increase profitability of the combined firms. To this end, questionnaire were administrated to Oando Nigeria Plc and some few other organizations that merged. The data and information collected were analyzed using simple tables, frequencies …
Can the material for “School Population and Effective Teaching and Learning in Primary Schools” be used as a guide for Education Project?
Yes it can be used — The research work examined school population and effective learning, teaching and learning in primary school in the Odeda Local Government Area of Ogun State. For the purpose of this study, the target population was made up of the pupils in primary schools. It was realized that population explosion of pupils in primary hindered their academic progress, welfare and quality in the level of education. It was also realized that inadequacies in human and non-human resources placed various problems on teaching and learning, thereby the need for our government and education agencies to arise to check the rate at which pupils are admitted into our primary schools. More facilities for learning should be provided in primary school so as to facilitate …
Can the material for “The Impact of Capital Structure and Performance on the Petroleum Sector” be used as a guide for Economics Project?
Yes it can be used — The purpose of this paper is to empirically investigate the effect which capital structure choice has on performance of petroleum companies in Nigeria as one of the energy or transition economies. I investigated the relationship between return on equity (ROE), return on assets (ROA), and the earnings per share (EPS) and the capital structure for a sample of 4 petroleum companies from the Nigeria Stock Exchange from 2003 to 2012. Secondary data were used for the study. The data were gotten from the Nigeria Stock Exchange fact books issued for the various years under study. I used the linear regression analysis (SPSS 21) in estimating the relationship between leverage and performance. Using two accounting measure of performance (return on equity, ROE …
Can the material for “Maintenance Cultural Practices and Performance of Nigeria Port Authority, Onne” be used as a guide for Maritime and Transport Project?
Yes it can be used — Maintenance culture defines the values, way of thinking, behaviour, perception, and the underlying assumptions of any person or group or society that considers maintenance as a matter that is important and practices it in their life. The study was carried out to evaluate the Maintenance Cultural Practices and Performance of Nigeria Port Authority, Onne. In achieving this aim, the following specific objectives were laid out to investigate the factors affecting the maintenance cultural practices of Onne seaport and determine the ways of enhancing the quality of Nigeria Port Authority Project through improved maintenance culture. The research design used in this report is descriptive design, utilizing questionnaire method to obtain information from the respondents for this project. A total of 133 …
Can the material for “The Role of Commercial Banks in Small Scale Business Financing” be used as a guide for Banking and Finance (BF) Project?
Yes it can be used — New products are developed in the Banking industry to meet the ever-growing needs of customers. In this research work, the research choose four of the products, measured the extend to which they have been able to satisfy the customers. The products selected are SMALL CARD, INTERNATIONAL MONEY TRANSFER, EDUCATIONAL SCHEME AND INTEGRATED BANKING NETWORK TRANSACTION. Data collected through questionnaire are presented in tabular form and percentages and pie chart are needed to analyze them. The research work revealed that the product has been able to satisfy the customer to a very high level. It was also discovered that customers patronize product which involves fund transfer and the most prominent reason for their patronize is based on the convenience. The introduction of the …