THE IMPACT OF COST CONTROL TECHNIQUES ON CONSTRUCTION PROJECTS DELIVERY
CHAPTER ONE
1.0 Introduction
1.1 Background Of The Study
It is a known fact that the Nigerian construction industry continues to occupy an important position in the nation’s economy even though it contributes less than the manufacturing or other service industries, (Aibinu and Jagboro, 2002). The contribution of the construction industry to national economic growth necessitates improved efficiency in the industry by means of cost effectiveness and timeliness, and would certainly contribute to cost savings for the country as a whole. It is also common knowledge that the implementation of the construction project in the industry is usually accompanied with time delay and cost increase as well as owner dissatisfaction (Hafez, 2001).
In general most (if not all), construction projects experience time delays and cost overruns during their implementation phase (Koushki and Kartam,2004). Numerous researchers, both in the developed and developing nations have also examined and identified the causes of time and cost overrun in the construction industry. Mansfield, Ugwu and Doran (1994), for example performed a comprehensive analysis of most important factors responsible for project delays and cost overrun in Nigerian construction projects. This analysis indicated poor contract management, financing and payment of completed works, change in site conditions, shortages of materials, design changes, subcontractors and nominated suppliers, other factors were price fluctuation inaccurate estimates, delays and additional works as factors responsible for project delays and cost overrun.
A comprehensive classification of causes of construction delays has also been determined by Henesy (1993). The classification system included materials, labour, equipment and financial constraints, as the main contributory variable to causes of construction time overrun. The list of major factors causing construction delay in Thailand by Ogunlana and Proumkunting (1996) included the inadequacy of resources supplies, client and consultant shortcomings and incompetence. Koushki and Kartan (2004) studied the impact of construction materials on project time and cost in Kuwait and identified the project related variable affecting the on time delivery of materials as material selection, time, type of materials and their availability in the local market.
Time impacts are inevitable on construction projects, primarily because of the uniqueness of each project and the limited resources of time and money that can be spent on planning, executing and delivering the project.
Time factors are inherent in all of project construction’s undertakings. Construction projects have long been recognized as particularly cost, time and risk-laden. Some of the time and cost factors associated with the construction process are fairly predictable or identifiable; others may be totally unforeseen. The constructed project may not perform as anticipated because the owner may have unrealistic expectations regarding the delivery time of construction forcing contractors into unrealistic gambles, corner-cutting or commitments that may not be realistic (Frimpong 2003).
Project success can be defined as meeting goals and objectives as prescribed in the project plan. A successful project means that the project has accomplished its technical performance, maintained its schedule, and remained within budgetary costs. Project management tools and techniques play an important role in the effective management of a project. Therefore, a good project management lies in the management tools and techniques used to manage the project. Project management involves managing the resources’workers, machines, money, materials and methods used. Some projects are effectively and efficiently managed while others are mismanaged, incurring much delay and cost overruns and negatively affecting the economy (Frimpong 2003).
Assessing construction projects’ delivery time is critical in today’s market-driven economy.
1.2 Problem Statement
Construction can be considered as a dynamic industry which is constantly facing uncertainties. These uncertainties and the many stakeholders in these kinds of projects, make the management of costs difficult which consequently causes cost overruns. Therefore, cost overruns are considered one of the most critical issues during the execution of construction projects (Chan, et al., 2004; Doloi, 2011).
As mentioned by Van Der Westhuizen and Fitzgerald (2005), the presence of cost overruns can be a reason for project delays or possible project failures. However this idea has been refuted by many authors who considered that project success depends on many other factors that should be assessed to conclude the success or failure of a project (Chan, et al., 2004). Moreover, there have been many studies that suggest that the success of a project depends on the presence of certain critical factors which can also change depending on the objective to be met (Iyer and Jha, 2005). In other words, some authors ascertained that there are some critical success factors that help to improve cost performance and prevent cost overruns.
1.3 Aim and Objectives of the Study
The main aim of the study is to examine various cost control techniques used in construction projects and the impact they have on project delivery.
Specifically, the objectives needed to achieve the above stated aim of the study are outlined below:
- To identify cost control technique frequently used by contractors in construction projects.
- To examine problems encountered by contractors in managing construction project cost.
- To determine the impact of costcontrol techniques on the duration of construction projects.
1.4 Research Questions
In-order to guide the study and achieve the above stated research objectives; the following research questions were formulated:
- What cost control techniques are frequently used by contractors in construction projects?
- What are the problems faced by contractors in controlling cost in the construction project process?
- What impact does cost controlling techniques have on the duration of construction projects?
1.5 Research Hypotheses
In order to pursue the objective of this study, the following generalized statements have been designed to guide and aids in obtaining the result for the experiment to be conducted. For this work, the null hypothesis will be represented with H0 while the alternative hypothesis will be represented with hypothesis H1.
Hypothesis One
- H0: Cost control problems do not lead to project delivery failures.
- H1: Cost control problems lead to project delivery failures.
Hypothesis Two
- H0: Cost Control techniques do not lead to construction delivery failures
- H1: Cost Control techniques lead to construction delivery failures
1.6 Significance Of The Study
This study will be of importance to building professionals and the general public because it would not only clarify but also create awareness of the extent to which inadequacies in cost control techniques can adversely affect project performance.
The study will also help contractors, clients, consultants and all parties involved in construction projects about ways of improving their current method of cost management and control.
The study will also be of great benefit for other student researchers’ who may want to venture into the same subject matter. Having gotten results-both empirically and theoretically, the study will serve as a foundation for future research studies.
1.7 Scope Of The Study
The study will cover some selected quantity surveyors from Owerri. All findings and recommendations from the study may not reflect the true view of the traditional roles and changing roles of quantity surveyors as the researcher could not cover a wider area due to financial and time constraints.
1.8 Limitations of the Study
During the course of this study, there were some problems encountered which stood as limitations to the research work. Some of the limitations include:
- Time Constraint:
The time frame given to accomplish this project was very short due to school academic calendar and it was carried out under pressure which made the researcher not to implement some necessary features.
- Financial Constraint:
Insufficient fund tends to impede the efficiency of the researcher in sourcing for the relevant materials, literature or information and in the process of data collection (internet, questionnaire and interview).
- Initial Cooperation Delay from Respondents:
A particular limitation of this work came as a result of the respondent refusal to offer their cooperation at the initial time they were contacted. This contributed in making the success of this research study difficult.
1.9 Definition Of Terms
Construction:
In the fields of architecture and civil engineering, construction is a process that consists of the building or assembling of infrastructure. Far from being a single activity, large scale construction is a feat of human multitasking. Normally, the job is managed by a project manager, and supervised by a construction manager, design engineer, construction engineer or project architect.
Deliverable:
Deliverable is a term used in project management to describe a tangible or intangible object produced as a result of the project that is intended to be delivered to a customer (either internal or external). A deliverable could be a report, a document, a server upgrade or any other building block of an overall project.
Project management:
This is the discipline of planning, organizing, motivating, and controlling resources to achieve specific goals. A project is a temporary endeavour with a defined beginning and end (usually time-constrained, and often constrained by funding or deliverables), undertaken to meet unique goals and objectives, typically to bring about beneficial change or added value.
Time:
This is a dimension in which events can be ordered from the past through the presentinto the future, and also the measure of durations of events and the intervals between them.
Cost:
A cost is the value of money that has been used up to produce something, and hence is not available for use anymore. In business, the cost may be one of acquisition, in which case the amount of money expended to acquire it is counted as cost.
Cost overrun:
Occurs when the final cost of the project exceeds the original contract value at the time of completion.
Good cost performance project:
Project in which the cost overrun of the project does not exceed 10 percent of the initial budget.
Poor cost performance project:
Project in which the cost overrun of the project exceeds 10 percent of the initial budget.
CHAPTER TWO
2.0 Literature Review
2.1 Introduction
The review of relevant literature is the main topic of this chapter. A literature review covers theoretical and methodological contributions to a certain issue in addition to the state of knowledge at the time of writing. It provides information about the state of the art in relation to the subject you are writing about. It examines the body of work on the chosen subject. The literature evaluation in this study comprises the …
Procedure for Downloading the PDF (Docx) Material
The Impact of Cost Control Techniques on Construction Projects Delivery can be downloaded by requesting the full set of materials at the project or seminar cost. The document will be sent via Microsoft Word (MS-Word) format via WhatsApp (e-mail) following payment confirmation.
Seminar Material Cost ₦3,000 | Project Material Cost ₦5,000 |
Request Complete Material
![]() | Click here to request the Complete Material via WhatsApp including;
|
TABLE OF CONTENTSPRELIMINARY PAGES
- Title page
- Approval page
- Dedication
- Acknowledgement
- Table of Contents
- Abstract
INTRODUCTION
- 1.0 Introduction
- 1.1 Background …
- ⋮
LITERATURE REVIEW
- 2.1 Introduction
- 2.2 Conceptual Review
- 2.3 Theoretical Framework
- ⋮
- 2.4 Empirical Studies
- 2.5 Research Gaps
- 2.6 Summary of Literature Review
CHAPTER THREE
RESEARCH METHODOLOGY
- 3.1 Introduction
- 3.2 Research Design
- 3.3 Population of Study
- 3.4 Sampling and Sampling Technique
- 3.5 Validation of Research Instrument
- 3.6 Method of Data Collection
- 3.7 Method of Data Analysis
- 3.8 Questionnaire Administration
- 3.9 Ethical Consideration
- 3.10 Statistical Analysis
CHAPTER FOUR
DATA ANALYSIS, RESULT AND DISCUSSION
- 4.1 Introduction
- 4.2 Presentation and Analysis of Data
- 4.3 Re-statement of Research Questions
- 4.4 Test of Hypotheses
- 4.5 Discussion of Findings
CHAPTER FIVE
SUMMARY, CONCLUSION AND RECOMMENDATION
- 5.1 Introduction
- 5.2 Summary of Findings
- 5.3 Conclusion
- 5.4 Recommendation
- 5.5 Suggestion for Further Study
REFERENCES
APPENDIX A - “QUESTIONNAIRE”
Disclaimer for Complete Material Utilization
The displayed research work titled "The Impact of Cost Control Techniques on Construction Projects Delivery" is stated as a research guideline towards accomplishing your assigned project / seminar research work. All the research materials on this website are ONLY for research purposes and should be used as a guideline in developing your research work. For no reason should you copy word for word as projectlist.com.ng will not be liable for any who copied the material. By ordering the complete research guideline, it signifies that you've accepted our terms of service.
PRELIMINARY PAGES
- Title page
- Approval page
- Dedication
- Acknowledgement
- Table of Contents
- Abstract
INTRODUCTION
- 1.0 Introduction
- 1.1 Background …
- ⋮
LITERATURE REVIEW
- 2.1 Introduction
- 2.2 Conceptual Review
- 2.3 Theoretical Framework
- ⋮
- 2.4 Empirical Studies
- 2.5 Research Gaps
- 2.6 Summary of Literature Review
CHAPTER THREE
RESEARCH METHODOLOGY
- 3.1 Introduction
- 3.2 Research Design
- 3.3 Population of Study
- 3.4 Sampling and Sampling Technique
- 3.5 Validation of Research Instrument
- 3.6 Method of Data Collection
- 3.7 Method of Data Analysis
- 3.8 Questionnaire Administration
- 3.9 Ethical Consideration
- 3.10 Statistical Analysis
CHAPTER FOUR
DATA ANALYSIS, RESULT AND DISCUSSION
- 4.1 Introduction
- 4.2 Presentation and Analysis of Data
- 4.3 Re-statement of Research Questions
- 4.4 Test of Hypotheses
- 4.5 Discussion of Findings
CHAPTER FIVE
SUMMARY, CONCLUSION AND RECOMMENDATION
- 5.1 Introduction
- 5.2 Summary of Findings
- 5.3 Conclusion
- 5.4 Recommendation
- 5.5 Suggestion for Further Study
REFERENCES
APPENDIX A - “QUESTIONNAIRE”
Disclaimer for Complete Material Utilization
The displayed research work titled "The Impact of Cost Control Techniques on Construction Projects Delivery" is stated as a research guideline towards accomplishing your assigned project / seminar research work. All the research materials on this website are ONLY for research purposes and should be used as a guideline in developing your research work. For no reason should you copy word for word as projectlist.com.ng will not be liable for any who copied the material. By ordering the complete research guideline, it signifies that you've accepted our terms of service.
Frequently Asked Questions (FAQ)
Can the material for “The Role of Leadership Styles in Driving Military Innovation” be used as a guide for Political Science Project?
Yes it can be used — The Army Military is an institution, since its purpose, objectives, organization, actions, behavior and the roles of its members; the allocated resources are specifically determined and regulated by normative prescriptions. The study scrutinized the Role of Leadership Styles in Driving Military Innovation. In achieving this aim, the following specific objectives were laid out to examine the relationship between the leadership styles of Military officers functioning in Driving Military Innovation and examine the leadership styles required to optimize an organizational climate of military innovation. The research design used in this report is descriptive design, utilizing questionnaire method to obtain information from the respondents for this project. A total of 80 (eighty) respondents were selected for this study to represent the entire …
Can the material for “Management Challenges Facing Mass Transit Programme in Nigeria” be used as a guide for Public Administration (PA) Project?
Yes it can be used — This research explains the Management Challenges Facing Mass Transit Programme in Nigeria, mostly in Kogi State Transport Company. It has been apparent that Mass Transit in Kogi State has not been done in the right procedure which has motivated this research. The objective of this research is not only to give insight into the factors that militate against mass transit but to bring about recommendations so as to eradicate the problems. The method used in collecting data was mainly secondary data and questions which were administered in the Kogi Mass Transport Company. These were analyzed by simple percentage method. It was discovered from the findings that insufficient spare parts affected the operation of the corporation. It was also clear that …
Can this topic “The Effect of Class Size on Academic Achievement of Junior Secondary School Students” be used for Education Project?
Yes it can be utilized for research — The study looked at the class size as it relates to academic performance of student in Abeokuta South Local Government Area of Ogun state. The population of the study were all students in Junior Secondary School in Abeokuta South Local Government Area of Ogun state. 100 respondents were used for the study through Radom Sampling Techniques. The data collected were analysed using simple percentage. The findings of this study shows that the effect of class size on academic achievement of Junior Secondary School student has tremendous positive effects on academic achievement. It was recommended that policy makers and government should ensure that more classrooms are built and number of students in a class should not be more than 30. The Parent …
Can the material for “An Analysis of New Products Development on Marketing Strategy on Organizational Productivity” be used as a guide for Business Administration Project?
Yes it can be used — The study was carried out to analyze the new products development on marketing strategy on organizational productivity in Lagos State manufacturing sector. In achieving this aim, the following specific objectives were laid out to identify the problems encountered in new product development and its introduction into the market and examine the effect of new product development on Lagos State manufacturing sector growth. Investigation revealed that a new product consumes a lot of money to bring a new idea generated into commercialized offer. A new product is expected to be profitable and successful but opposite is the case sometimes to different companies. Products sometimes decline and die natural deaths due to inexplicable circumstance. The research design used in this report is …
Can the material for “A Mathematical Model for Prediction of the Strength of Sancrete Cement Block” be used as a guide for Civil Engineering Project?
Yes it can be used — Sandcrete blocks are prismatic units manufactured from lean (sand-cement) mortar mixes and are the predominant walling materials used in buildings in Nigeria and other countries. Although the blocks are preferred to other similar walling material such as bricks and concrete blocks due to the availability of the dominant material (sand) in the country and the ease of manufacture, the material is known to have several drawbacks: it has a low compressive strength which could be a factor for structural failure in buildings. Apart from the compressive strength, little is known about the other strength and permeation properties of the material. Thirdly, little research has been conducted into the influence of water-cement ratio which is known to wield a strong influence on …
Can the material for “Role of Electronic Media in Combating Drug Abuse and National Security” be used as a guide for Public Administration (PA) Project?
Yes it can be used — The aim of this study was to examine the role of tectonic media in combating drug abuse and its national implication. Chapter two was specifically intended to find out the role of electronic media in combating drug abuse and national security. It was revealed among other things, that factors includes peer pressure, unemployment, idleness, family disinter gratin .Thus chapter three and four high light the methods used for the research, information were prim any collected through questionnaires and this was analyzed by simple parentage showing diverse opinion or views of respondents as regards drug abuse and its attendant problems. Finally, chapter five went further to suggest areas of improvement and needs that will help both man agent of National Television authority in their …
Can this topic “Online Sim Card Registration” be used for Computer Science (CS) Project?
Yes it can be utilized for research — This project is actually explaining about the importance of online sim cards registration, which has contributed more effectively towards in reduction of phone crime in Nigeria. The Nigeria communication commission (NCC), has taken a drastic method in putting a stop of every criminal act made, in the use of mobile phone. The sim registration process, has not only help in finding out every illegal or criminal act committed by various individuals, but also has contributed to the nation (Nigeria), in knowing the volume or the number of persons using a sim mobile phones. This process has also help telecommunication operators or industries in finding out the specific crime made in the use of sim mobile phones. For example, knowing the …
Is the topic “Sugar Content Analysis Per 10ml of Liquid Fayrouz, Coca Cola, Guinness Malt, Amstel Malt, and Pepsi Drink” recommended for Science Laboratory Technology (SLT) Project?
Yes it is highly recommended — Sugar is a carbohydrate which is one of the major ingredients in the formulation / production of soft drinks such as Amstel malt, pepsi, fayrouze and others, the concentration of sugar in drinks varies from one drink to another. The study was carried out to analyze the Sugar Content Per 10ml of Liquid Fayrouz, Coca Cola, Guinness Malt, Amstel Malt, and Pepsi Drink. This research work revealed that Coca cola contains the highest percentage of sugar compared to the other soft drinks while fayrouz contain the lowest percentage of sugar unlike pepsi, Guinness malt and Amstel malt. After Analyzing, the sugar content per 10ml of each of the beverages are stated below according to their percentage: Coca-Cola contain 2.4%, Amstel …
Is the topic “The Perception of Teachers on the Effect of Hawking on Academics Performances of Student in Some Selection School” recommended for Education Project?
Yes it is highly recommended — This study is designed to find out the perception of teachers on the effect of hawking on academic performance of student in Odeda Local Government Area of Ogun State. The population of the study comprised all primary schools in the Odeda Local Government Area. Random Sample Technique was used in selecting four primary schools out of the thirty primary schools in Abeokuta North Local Government Area of Ogun State. A structured questionnaire is used as the instrument of data collection. In using the questionnaire, some teachers were requested to respond to it and pupils were also selected at random in the primary schools in used four of study. Simple percentage is used for analysis of data. According to the data …
Can this topic “Margarine Production Using Oil Blends From Palm Kernel, Coconut and Melon” be used for Food Science and Technology (FT) Project?
Yes it can be utilized for research — The study examines the Margarine Production using Oil Blends from Palm Kernel, Coconut and Melon. In achieving this aim, the following specific objectives were laid out to investigate the potential of producing margarine from blends of Egusi melon, coconut and palm kernel oil and determine its physicochemical, sensory qualities and overall acceptability of the product. Palm kernel, coconut and melon oils were extracted and refined. Their physical and chemical characteristics were examined. The refined oils were blended to produce three samples of margarine: palm kernel oil margarine (PKO), palm kernel and coconut oils margarine were tested for free fatty acid and Iodine value with the following results 0.27,0.84, 1.68 Free Fatty Acid, 17.77, 20.30, 21.57 Iodine value for PKO, PCO …