THE IMPACT OF BUDGETING AND BUDGETARY CONTROL IN CONSTRUCTIONS PROJECT DELIVERY IN NIGERIA
ABSTRACT
This research project examined the impact of budgeting and budgetary control in construction project delivery in Nigeria. The study tried to find out how industries make budget and uses budget to achieve the objective of the firm. It also sought to ascertain the importance of budgeting and budgetary control to a construction firm. It also identified the limitation to the application of sound budgeting and budgetary control system in a construction firm. In constructing this research project, the researcher had to review some literatures and subsequently embarked on data collection through observation, interview and questionnaire.
The objective of chapter one of this research project is to introduce the topic which the need for the research is given and stated.
The hypothesis and other important aspects like the significant of the problem, the scope and limitation were given.
The objective of chapter two is to present a piece of the extensive literature review carried out in order to reveal the expressed opinion of notable authors and scholars as regards, to the relevance of the budgeting and budgetary control to an organization.
Chapter three present the research design and methodology. Chapter four and five presents the analysis of the research and results, conclusion and recommendation respectively.
These chapters reviewed that budgeting and budgetary control is a sound management system which has the potential to drive a construction firm into prime position in the construction sector of the Economy.
CHAPTER ONE
1.0 Introduction
1.1 background of the Study
In Nigeria, building construction have gone through a lot of setback due to unplanned programme of works, and the proper utilization of the available capital or resources of the project and this has caused the abandonment of project.
Building projects form an important ingredient in the development process of communities, nations and regions of the world. Ability to conceive and implement building project successfully is important after the measurement of a nation's wealth.
The construction industry in the last decades and the environment in which it operates has changed significantly. The changing process is increasing continuously and it seems to be a nearer ending and lactic process. With the changes in construction procurement process, one thing has not changed, which is the importance of cost control (Budgeting and Budgetary control).
According to Alan (1977) Budgeting is a critical decision making process which involves the allocation of limited financial resources to meet constructional goals and objectives.
Formerly, building firms used the appropriate type of budget adopted from government. The purpose was to limit the expenses on some items such as advertising, research and development which where considered as luxury items. Nothing was done to control construction cost through the establishment of periodic standard and the analysis of variance between actual and predetermined performances.
According to Anyaogu (1999) the word “ Budget” was defined as an expression in financial and quantitative term of an organizational plan of action prepared in advance of the period to which it relate and with the aim of attaining a certain objective. It is a management document that serves as a control medium over the spending activities of an organization. Budget can equally be defined as a format or statement of management expectation on output, cost and other financial transaction.
Budgetary control was originated in the 1920's as a means of planning and control. Organization's wanted to see the possibility and the outcome of their plans and forecast, budget were prepared for this purpose, at this period however, the impact of budgetary control was not fully understood by organizations.
Budgeting and budgetary control are (2) techniques which top management adopted to achieve its task of planning, co-operating, directing and controlling in an organization. In a lecture delivered in an annual workshop of the Nigeria Institute of Quantity Surveyors (NIQS), Wahab (2000) said while budgetary planning is concerned with setting targets at the onset of a project, Budgetary control is concerned with checking actual performance with those targets and where effective remedial action is necessary to ensure that the project remains with budget at all, times. The exercise embraces the entire construction process which it cycle covers the pre-design, post design, detailed and construction phases.
1.2 Statement of the Problem
The impact of budgeting and budgetary control in the construction industry cannot be overlooked, but the problem is how effective do they use it to achieve the organizational goals.
In the course of planning, many firms prepares budget as a technique that will quick on them to achieved the objective of their business, but still after preparing the budgets as a technique that will help them in the planning, controlling and co-ordinations of their activities to achieve the goal, the problem mentioned to be solved in the budget remains the some due to the inability of the firm to control their contract cost annually to rhyme with their annual budget.
To this affect the question is, is budgeting important or useful to a construction company in the areas of planning, controlling and coordinating of their activities, since after all the effort in preparing budget and the objective of the organization remains unachieved . Is there no co-committee to integrate the effort of all the functional staff who prepares the budget and explain the deviation arising from the budget
1.3 Significance of the Study
The significance cannot be overemphasized. This research has been useful for being able to find out that there is need for budgeting in a construction firm.
Budgeting is a way of managing, it is a management tool. It also has a lot of importance to contract in the building construction firm, although it is a means, not an end itself.
The benefit of budgeting in a construction firm includes planning co-ordination, classification of responsibility, improved communication, increased in control avert the abandonment of capital constructional projects and the motivation of personnel.
Budgeting also increases the morals, thus the productivity of the labour force by seeking their useful participation in the formulation of plans and policies by bringing a harmony between individual goals and the company's objective.
It helps the firm in resources optimization, capital and human, it aids the most profitable channels.
1.4 Purpose of the Study
The purpose of the study is to find out the need for budgeting in a construction company.
This study is fashioned to know if:
a) Budgetary control can be used in comparing actual contract sum with the expected expenditure.
b) Budgetary control as a continued monitoring system can be used to expect new event in a construction company and react quickly to changes.
c) Budgetary control, through its check and balance method can be used in making and controlling profit plan in a construction firm.
d) Budgetary control can be used to monitor the cash flow of the project.
1.5 Scope and Limitation of the Study
This study is based on budgeting strategies of small construction firms and their budgeting procedure, the process of this research did not cover much location but his immediate environment (Owerri) to facilitate his work.
Although the study was successful, some problems were encountered.These problems include impossibilities faced as to get in touch to firms, companies and persons who should supply the needed information.
The word construction is also limited to the building industry as construction comprises a wide range of activities.
Other limitation to this work is time constraint.
1.6 Research Questions/ Hypothesis
The following hypothesis and Research were made to guide the study:
a) Budgeting and budgetary control is not useful to a construction firm in project delivery.
b) Budgeting and budgetary control cannot be used in the monitoring of cash flow in construction project.
c) Budgeting and budgetary control has contributed in construction project delivery
d) Budgeting and Budgetary control is useful to a construction firm in project delivery
1.7 Organization of Works
This project is divided into five chapters.
Chapter one is the introduction.
Chapter two is literature review.
Chapter three is the research mythology where all the techniques, procedures and tools of analysis of data would be presented.
Chapter four is data presentation and analysis.
Chapter five is summary, conclusion and recommendation.
1.8 Definition of Term
Budget: Is the plan or forecast in which to monitor the performance of a set target which is used to measure the actual achievement of people, department or “the firm itself”.
Budgetary Control: Is a system of controlling cost through the preparation of budget, co-ordination of the development, establishing responsibilities, relating the responsibilities of the executive to her requirement of a policy. It is a technique which embarrasses all activities of the project and serves to support the key aspects of management control process.
Planning: Is the methodical process which occurs first with determining the precise course of action to achieving a desired target through established production objectives.
Rolling Plan: Is a part of perspective plans. Its purpose is to ensure continuity in the implementation of a perspective plan objective.
Planning Programming Budgeting System: This is one of the budgeting system which calls for a comprehensive application of the cost benefits analysis to detailed expenditure project applied to functional expenditure categories.
Zero Based Budget: This system calls for a total review of the entire budget each year with emphasis on a ranking of alternative project rather than on a detailed item by item analysis.
Balance Budgeting: This is where the budgeted revenue is equal to the budgeted expenditure.
Budget Centre: A responsibility center where the manager is responsible only for cost (expenses) incurred in the sub-unit.
CHAPTER TWO
2.0 Literature Review
2.1 Introduction
The review of relevant literature is the main topic of this chapter. A literature review covers theoretical and methodological contributions to a certain issue in addition to the state of knowledge at the time of writing. It provides information about the state of the art in relation to the subject you are writing about. It examines the body of work on the chosen subject. The literature evaluation in this study comprises the …
Procedure for Downloading the PDF (Docx) Material
The Impact of Budgeting and Budgetary Control in Constructions Project Delivery in Nigeria can be downloaded by requesting the full set of materials at the project or seminar cost. The document will be sent via Microsoft Word (MS-Word) format via WhatsApp (e-mail) following payment confirmation.
Seminar Material Cost ₦3,000 | Project Material Cost ₦5,000 |
Request Complete Material
![]() | Click here to request the Complete Material via WhatsApp including;
|
TABLE OF CONTENTSPRELIMINARY PAGES
- Title page
- Approval page
- Dedication
- Acknowledgement
- Table of Contents
- Abstract
CHAPTER ONE1.0 Introduction
- 1.1 Overview of the study
- 1.2 Statement of the problem
- 1.3 Significant of the study
- 1.4 Purpose of the study
- 1.5 Scope and limitation of the study
- 1.6 Research questions/Hypothesis
- 1.7 Organization of work
- 1.8 Definitions of terms
- 2.0 Literature review
- 2.1 Types of budget
- 2.2 Purpose of budget
- 2.3 Essentials of budgeting
- 2.4 Budget limitation
- 2.5 Budgetary controls
- 2.6 Budgetary controls in the building process
- 2.7 Objective of budgetary control
- 2.8 The process of budgetary control
- 2.9 Administration of budgetary control
- 2.10 Benefits of budgetary control
- 2.11 Planning programming budgeting system
- 2.12 Rolling plans
- 2.13 Stages in budgeting
- 2.14 Budget and standard costing
- 2.15 Budgeting and project cost control
- 2.16 Cost forecasting and cost control
- 2.17 Cost control mechanism
- Research methodology
- 3.0 Introduction
- 3.1 Research design
- 3.2 Method of data collection
- 3.3 Populations
- 3.4 Sample
- 3.5 Questionnaire design and administration
- 3.6 Data analysis technique
- 4.0 Data presentation and analysis
- 5.0 Conclusion
- 5.1 Recommendations
- 5.2 REFERENCES
APPENDIX - “QUESTIONNAIRE”
Disclaimer for Complete Material Utilization
The displayed research work titled "The Impact of Budgeting and Budgetary Control in Constructions Project Delivery in Nigeria" is stated as a research guideline towards accomplishing your assigned project / seminar research work. All the research materials on this website are ONLY for research purposes and should be used as a guideline in developing your research work. For no reason should you copy word for word as projectlist.com.ng will not be liable for any who copied the material. By ordering the complete research guideline, it signifies that you've accepted our terms of service.
PRELIMINARY PAGES
- Title page
- Approval page
- Dedication
- Acknowledgement
- Table of Contents
- Abstract
CHAPTER ONE1.0 Introduction
- 1.1 Overview of the study
- 1.2 Statement of the problem
- 1.3 Significant of the study
- 1.4 Purpose of the study
- 1.5 Scope and limitation of the study
- 1.6 Research questions/Hypothesis
- 1.7 Organization of work
- 1.8 Definitions of terms
- 2.0 Literature review
- 2.1 Types of budget
- 2.2 Purpose of budget
- 2.3 Essentials of budgeting
- 2.4 Budget limitation
- 2.5 Budgetary controls
- 2.6 Budgetary controls in the building process
- 2.7 Objective of budgetary control
- 2.8 The process of budgetary control
- 2.9 Administration of budgetary control
- 2.10 Benefits of budgetary control
- 2.11 Planning programming budgeting system
- 2.12 Rolling plans
- 2.13 Stages in budgeting
- 2.14 Budget and standard costing
- 2.15 Budgeting and project cost control
- 2.16 Cost forecasting and cost control
- 2.17 Cost control mechanism
- Research methodology
- 3.0 Introduction
- 3.1 Research design
- 3.2 Method of data collection
- 3.3 Populations
- 3.4 Sample
- 3.5 Questionnaire design and administration
- 3.6 Data analysis technique
- 4.0 Data presentation and analysis
- 5.0 Conclusion
- 5.1 Recommendations
- 5.2 REFERENCES
APPENDIX - “QUESTIONNAIRE”
Disclaimer for Complete Material Utilization
The displayed research work titled "The Impact of Budgeting and Budgetary Control in Constructions Project Delivery in Nigeria" is stated as a research guideline towards accomplishing your assigned project / seminar research work. All the research materials on this website are ONLY for research purposes and should be used as a guideline in developing your research work. For no reason should you copy word for word as projectlist.com.ng will not be liable for any who copied the material. By ordering the complete research guideline, it signifies that you've accepted our terms of service.
Frequently Asked Questions (FAQ)
Can the material for “Design and Implementation of a Web Based CGPA System for Students Result Computation” be used as a guide for Computer Science (CS) Project?
Yes it can be used — Comprehensive Grade Point Average (CGPA) Computation System is the process of calculating students GP and record in the primary, secondary school and higher institution of learning. This project deals with the calculation of Grade Point (GP) in higher institution. The existing method in Federal Polytechnic Nekede, Owerri is the tedious manual process therefore the write up consists of detail of grade point and the various problems associated with it. The objective of this project now is to provide a more authentic reliable and efficient Grade Point Average Computation System to minimize the errors and the tedious nature of the manual system. The motivation that led to the implementation of the proposed system is that grades are not based on effort, …
Can the material for “Relationship Between Study Habits and Attitudes of Secondary School Students Toward Examination Malpractice” be used as a guide for Education Project?
Yes it can be used — Examination malpractice is a common form of deviant behavior among secondary school students. It is rated as one of the greatest problems that undermine the foundations of educational development in Nigeria. The prime objective of this paper therefore is to examine the relationship between secondary school students study habits and their attitudes toward examination malpractice. The study was conducted ex-post factor under a descriptive survey research design. Stratified random sampling technique was employed to select 300 students from secondary schools in the district II in Lagos State Nigeria. Collected data on students attitude toward examination malpractice and study habits were obtained using two research instruments designed by the researcher. The instruments are Students’ Study Habit Questionnaires (SSHQ) and Students’ Attitudes toward …
Can the material for “Code Mixing as a Sociolinguistic Medium in Some Selected Songs in the Nigerian Music Industry” be used as a guide for English Language Project?
Yes it can be used — Language plays an important role in the society and this leads to the study of code mixing in relation to sociolinguistics and how code mixed utterances have been triggered as a result of language gap, stylistic motivations, domains, societal factors, message intrinsic factors, physical settings and situational factors. This work examined how these motivations have resulted in code mixed utterances by critically analyzing randomly selected utterances from the randomly selected songs of artistes in the Nigerian music industry. It was discovered that English language has adapted to the Nigerian context which brings out the creative and unpredictable nature of language users. It is therefore safe to conclude that motivations for code mixing enhance communication among cadres of people linguistically united …
Can the material for “Influence of Personal Growth Initiative and Public Self-Consciousness on Perceived Stigmatization Among Drug Users” be used as a guide for Psychology Project?
Yes it can be used — The study examines Influence Of Personal Growth Initiative And Public Self-Consciousness On Perceived Stigmatization Among Drug Users using Youths in Keffi Local Government Nasarawa State as a case study. In achieving this aim, the following specific objectives were laid out to examine the effect of stigmatization on personal growth initiative of drug users, assess the Public Self Consciousness among stigmatized Drug Users, find out the factors that influence stigma toward people with a drug addiction, investigate the reason of drug intake among the youths in Keffi Local Government, and investigate the stigmatizing attitudes toward people with a drug addiction have detrimental effects on the lives of the youths in Keffi Local Government Nasarawa State. The research design used in this …
Can the material for “Design and Implementation of an Online Students Result Alert System using Email and SMS” be used as a guide for Computer Science (CS) Project?
Yes it can be used — Email and SMS is a mobile technology that allows for sending and receiving text or even binary messages to and from a mobile phone. The relative ease of use of SMS makes it possible for a user to learn how to send SMS easily. E-mail and SMS are becoming increasingly popular due to the mobility provided by new ubiquitous systems. The aim of the study is to design and implement an online student result alert application, which will be highly efficient for the process of retrieving necessary information pertaining to every relevant notification about the student results. In achieving this aim, the following specific objectives were laid out as follows to develop an application software that will enable students to …
Is the topic “The Study of Structural and Electrical Properties of Lead Sulphide (PBS) Thin Film Deposited Through Chemical Bath Deposition” recommended for Physics Project?
Yes it is highly recommended — Lead sulphide is a unique direct band gap material which has developed a lot research interest especially in the fabrication of infrared detection and solar cell applications. The study was carried out to Study the Structural and Electrical Properties of Lead Sulphide (PBS) Thin Film Deposited through Chemical Bath Deposition. In achieving this aim, the following specific objectives were laid out to study the components of the deposited layer through X-ray diffraction meter, investigate its charge carrier mobility and deposit lead sulphide thin film through chemical bath decomposition (CBD). Lead sulfide (PbS) thin films were prepared on glass substrates at room temperature by chemical bath deposition (CBD) technique. The influence of dip times on the lead sulphide (PbS) thin films …
Can the material for “Impact of Information and Communication Technology on the Banking Sector” be used as a guide for Banking and Finance (BF) Project?
Yes it can be used — Computers and telecommunication system have become very important as delivery systems and productivity tools of electronic data and information. Nigerian banks have now realized that banking today requires prompt delivery of services, efficiency and the ability of customers to be served in any of their branches any part of the country, without any encumbrance. As a result of this, banks embarked on the use of Integrated banking application that can help them to provide efficient, comprehensive and nationwide services to their customers, through the use of WANs (wide area network). The focus of this study is on “The impact of information and communication technology on banking sector, A case study was on Access Bank Garden Avenue Enugu. 34 staff was …
Is the topic “Assessment of Reproductive Health Care Services for Women” recommended for Public Health Project?
Yes it is highly recommended — Reproductive health is a crucial part of general health and a central feature of human development. The study was carried out to assess the Reproductive Health Care Services for Women in Barkin Ladi Local Government Area, Plateau State. In achieving this aim, the following specific objectives were laid out to determine the adequacy of reproductive health care services provided to women and examine the impact of access to reproductive healthcare services on the health of women in Barkin Ladi Local Government Area. The research design used in this report is descriptive design, utilizing questionnaire method to obtain information from the respondents for this project. A total of 80 (eighty) respondents were selected for this study to represent the entire population …
Can the material for “Low Productivity and Its Effects in Nigeria Public Sector” be used as a guide for Public Administration (PA) Project?
Yes it can be used — The research outlines the low productivity and its effects in Nigeria public sector with a particular reference N.T.A Owerri and its associated low productivity. The introduction part gives brief account of what low productivity is, why this studies was carried out like finding out appropriate processes involved in the low productivity, the statement of effect in Nigeria. Chapter two review some of the literature term used in the study. In the other opinion productivity is defined as level of efficiency of work especially in industrial production. Increased productivity wills impares to enhance security. Chapter three deals with the method used to obtain information and collecting such data, which include area of stuffy, population sample, sampling techniques and sources of data. …
Can this topic “Construction and Design of Variac” be used for Electrical / Electronics Engineering (EE) Project?
Yes it can be utilized for research — Variac is a single primary winding wrapped around a magnetic core is used as in the autotransformer but instead of being fixed at some point, the secondary is tapped continuously over the output voltage range. The aim of the study is to design and construct a 2kva (0v - 240v) range, with a step up of 20v at 10 step. In achieving this aim, the following specific objectives were set out as follows to: power the electrical/electronic and laboratory equipments with a fixed input voltage, design a system that will be able to vary voltage from 0V to 240V, construct the system stated in the aim above using locally available materials, and examine the design process of 2kva autotransformer with …