Project Topics | Seminar Topics | Related Topics
Study of factors affecting construction cost performance in Jalingo Taraba State

STUDY OF FACTORS AFFECTING CONSTRUCTION COST PERFORMANCE IN JALINGO TARABA STATE


ABSTRACT

Maintaining steady cost projection on construction projects had been until recently an issue of serious concern, both to the client and project contractors. Cost deviation from initial Cost plan, had been prevalent on Construction sites. However, little or no efforts has made to curtail the phenomenon, it is against this background that this research work attempt to study the factors that are responsible, so as to identify them and proffer possible ways of tackling the menace. The study attempt this through chosen construction practitioners as population and samples were drawn to this effect at random from the category of professionals, using probability sampling methods. The Data were collected from primary source consisting of structured questionnaire designed in Likert Scale in rating Scale of 1 to 5, while the Secondary Data were collected through review of Journal articles and relevant Text books. The Data were analysed using Severity Index, Ranking and Simple Percentages. It was discovered from the analysis that factors such as Contractors inexperience, inadequate planning, Inflation, incessant variation order, and change in project design were critical to causing cost overrun, while project complexity, shortening of project period and fraudulent practices are also responsible. The study concluded with recommending, adequate planning using conventional techniques, Studying and applying project history, material bulk purchase, proper project design and establishing proactive fraud prevention system on sites, as panacea for effective cost performance on sites.


CHAPTER ONE

1.0 Introduction

Construction industry in Nigeria had been a major source of employment for 70% of labour force in the country, thus it controls the capital flow, as well as labour resources, which has cost implications. Adequate management of these resources is considered an important aspect of project works; it determines to a large extent the overall success of project works. So also if the resources are adequately harnessed, issues that pertains to cost overrun would not arise which could result to variations and claims.

Some firms rely on claim as a result of variation incurred during the course of the Project execution and afterward evaluate their profit after incurring necessary and unnecessary cost on a project. This however has tendency of positioning such in a disadvantageous profit position. An effective cost management strategy is therefore necessary, this could be achieved through putting in place a proactive cost management strategy (Love et al, 2005; Ogunsemi and Jagboro, 2005; Ferry et al, 1998).

They described cost management system as a process that should be carried out throughout the life cycle of a project, from the inception to final completion and final payment to the contractor. In the light of this, the timeliness and cost effectiveness of various operation and decision carried out will determine to an extent the magnitude of cost that could be saved on the project. ( Kerzner, 2005; Ogunsemi and Jagboro, 2005).

However Dissanayaka and KuJTSswamy(1999) opined that Time, Cost, Quality target as well as project satisfaction tend to be most important key to measure the overall performance of a project work. Furthermore, various research works have also indicated that most project records cost or time overrun during their tenure of execution.( Odusami and Olusanya, 2000). (Mbachu and Olaoye, 1989; Madewsley, et al, 2004); opined that 51percent of average delay were experienced yearly which culminates in cost overrun, certain factors are responsible for this, to this end however this study attempts at investigating such factors and proffer solution to the pandemic. The scope of this research work shall be limited to building construction sites within the selected area in Nigeria, Ogun state, Lagos state and Northern part of Nigeria. This is attributable to unique project environment they possess. The aim and Objectives of the research are as follows:

The research work is to determine the various factors that interplay in impacting project cost performance, investigating the order of severity of the factors, and recommending ways of curtailing the effects. Field survey was carried out with 100 questionnaire distributed and 67 were used for analysis of response from construction practitioners selected randomly from population of construction firms, The primary data were collected with the aid of structured questionnaire designed on Likert Scale of 1to 4 rating scale. Mean item score, Simple percentages and severity index were used as analytical tool of the generated data. SPSS (Statistical Packages for Social Science Students) was used in determining pattern of relationship among the cost determinants and variables. The factors were ranked in order of their degree of severity. It was discovered from the findings that, these factors are the major ones that results in cost overrun on construction sites.

  • Inadequate planning
  • Contractors project inexperience
  • Inflation
  • Incessant variation order
  • Change in project design
  • Project complexity
  • Shortening of contract period and
  • Fraudulent practices.

In order to prevent occurrence of cost overrun or a practice action towards prevention of such, the following are recommended.

  1. Inadequate planning: breaking of project planning into short term achievable goals, medium term planning and Long term planning
  2. Studying of project history for possible application on another similar projects
  3. Bulk purchase of material
  4. Proper design of the Project during design stage so as to avoid. Undue on-project variation
  5. Establishing fraudulent detecting system or system of individual accountability to discourage pilfering, stealing and other related vices.

1.2 Aim and Purpose of Study

This study has focused on investigating procurement strategies adopted in Jalingo, Taraba State large construction projects. It also identified various factor affecting construction cost performance of Jalingo, Taraba State large construction projects.

Purpose of Study

Very rarely Jalingo, Taraba State projects are finished within estimated project cost. For improving cost performance, it is very important to identify the reasons affecting cost performance of Jalingo, Taraba State projects. Hence, there is a need of study in understanding the reasons and factors affecting project cost performance of construction projects.


1.3 Statement of Problem

This study revealed that;

  1. Fluctuation in price of the material,
  2. Cash flow and financial difficulties faced by contractors,
  3. Shortage of site workers,
  4. Lack of communication between parties,
  5. Incorrect planning and scheduling by contractors

Are most severe factors while frequent design changes and owner interference are least affecting factors on construction cost performance in Jalingo, Taraba State large projects.


1.4 Research Approach

The project was carried out through interviews and survey using the questionnaire among the personnel involved in handling Jalingo, Taraba State large projects. Gathered data was analyzed statistically using SPSS software package.


1.5 Limitations of the Study

This study was limited to large construction projects administrated by Jalingo, Taraba State. During the course of this study, many things militated against its completion, some of which are:

  1. Time Constraint: The time frame given to accomplish this project was very short due to school academic calendar and it was carried out under pressure which made the researcher not to implement some necessary features.
  2. Establishment Policies: Establishment policies posed a serious limitation as most staffs are not ready to release information needed for this project work. There were lots of information needed from the staffs of this institution to enhance the study which took them time to release or they did not release at all for security purposes, hence the scope was reduced.

1.6 Significance of Study

This study has highlighted various issues causing poor project performance in Jalingo, Taraba State large projects. Ranking of the factors will enable the Jalingo Taraba State engineers for taking appropriate actions in improving the performance of cost in construction projects.


1.7 Definition of Terms

Builder: this is a professional in which is responsible for hazardous translating and developing all designs by other consultants.

Culture: this is defined as the total way of peoples life in terms of attitude benefits, perceptions, values and morality.

Management: It is the discipline of planning co-coordinating, organizing, controlling, leading, forecasting, securing and managing resources to being about the successful completion of specific project goals and Objectives.

Architects: this is a professional in the field of architecture who design building plan and supervision.

Construction: according to Wikipedia's encyclopedia construction is designed as a process of assembling of infrastructure and consists of building up of several activities into final project.

Project: it is a temporary endeavor having a defined beginning and end which is an undertaken to meet unique goals and Objectives.

Building Construction: it is the process off aiding structure to real property.

Building: It is defined as a structure erected where it is to stand with the main functions of shelter and habitation for man.

Project Manager (PM): is the person accountable for accomplishing the stated project Objectives.

Project Management (PM): This is field of study or discipline of planning organizing securing and managing resources for a successful completion of project within the stipulated time to meet its desired goals and Objectives.

Project Proposals (PP): They are documents designed to present a plan to action.

Quality: The general standards or grade of something it also means the highest of finest standard.

Management: this has to do with the ways and pattern in zerock construction organizer, plan, and control and managed all site and construction administration.

Project: is a temporary effort to create a unique product or several which the building construction that has to be done by Zerok construction without unnecessary delays and on time too.

Clients: proper funding will assist Zerock construction to execute their work effectively.

Structural Engineer: should ascertain that the correct size and type of reinforcement bar is used for each project to discourage collapse.

Quantity Surveyor (QS): As a cost analyst, the QS must ensure that the bill of quantities (BOQ) is adequately prepared for good quality project by Zerock construction Nigeria limited.

Site: it is the central point of all construction activities.


CHAPTER TWO

2.0 Literature Review

2.1 Introduction

The review of relevant literature is the main topic of this chapter. A literature review covers theoretical and methodological contributions to a certain issue in addition to the state of knowledge at the time of writing. It provides information about the state of the art in relation to the subject you are writing about. It examines the body of work on the chosen subject. The literature evaluation in this study comprises the …


Procedure for Downloading the PDF (Docx) Material


Study of factors affecting construction cost performance in Jalingo Taraba State can be downloaded by requesting the full set of materials at the project or seminar cost. The document will be sent via Microsoft Word (MS-Word) format via WhatsApp (e-mail) following payment confirmation.


Seminar Material Cost
₦3,000
Project Material Cost
₦5,000


Request Complete Material

Complete Material Chapters of Study of factors affecting construction cost performance in Jalingo Taraba StateClick here to request the Complete Material via WhatsApp including;
  • Preliminary Pages,
  • Chapter 1-5,
  • References and Appendix.



TABLE OF CONTENTS

PRELIMINARY PAGES


CHAPTER ONE

INTRODUCTION

  • 1.0 Introduction
  • 1.2 Aim and Purpose of Study
  • 1.3 Statement of Problem
  • 1.4 Research Approach
  • 1.5 Limitation of Study
  • 1.6 Significance of Study
  • 1.7 Definition of Terms

CHAPTER TWO

LITERATURE REVIEW

  • 2.1 Introduction
  • 2.2 Budget Planning and Control
  • 2.2.1 Traditional Procurement
  • 2.2.2 Management Procurement
  • 2.2.3 Integrated Procurement
  • 2.2.4 In House Procurement
  • 2.3 Cost Performance is the Fundamental Norm of Measuring Project Success
  • 2.4 Construction Site
  • 2.4.1 Types of Construction
  • 2.4.1.1 Residential Building
  • 2.4.1.2 Institutional and Commercial Building
  • 2.4.1.3 Specialized Industrial Construction
  • 2.4.1.4 Infrastructure and Heavy Construction
  • 2.5 Performance in the Construction Industry
  • 2.5.1 Contractual performance
  • 2.5.2 Performance specification
  • 2.5.3 Performance bond
  • 2.6 Definition of Time and Cost Performance
  • 2.6.1 Time Performance
  • 2.6.2 Cost Performance
  • 2.7 Time Variance for Water and Sanitation Projects
  • 2.7.1 Bromilow’s Time-Cost Model
  • 2.8 Problem of Performance in Construction Industry
  • 2.9 Project Management and Performance

CHAPTER THREE

RESEARCH METHODOLOGY AND THE STUDY AREA

  • 3.1 Introduction
  • 3.2 Research Methodology
  • 3.3 Questionnaire
  • 3.3.1 Questionnaire Design
  • 3.4 Study Population
  • 3.5 Data Requirement
  • 3.6 Sample Frame
  • 3.7 Sampling Techniques
  • 3.8 Data Collection and Analysis
  • 3.9 Data Collection Instrument
  • 3.9.1 Administration of Questionnaire
  • 3.9.2 Personal Interview
  • 3.9.3 Personal Observation
  • 3.9.4 Relevant Publication

CHAPTER FOUR

DATA COLLECTION, ANALYSIS, PRESENTATION AND INTERPRETATION

  • 4.1 Introduction
  • 4.2 Classification of Jalingo, Taraba State (JTS) Projects
  • 4.3 JTS Construction Procurement
  • 4.4 Factors Affecting Construction Cost Performance
  • 4.4.1 Fluctuation in Prices of Materials
  • 4.4.2 Cash Flow and Financial Difficulties Faced by Flow and Financial Contractors
  • 4.4.3 Shortage of site workers
  • 4.4.4 Lack of communication between parties

CHAPTER FIVE

SUMMARY OF FINDINGS, RECOMMENDATIONS AND CONCLUSION

  • 5.1 Summary of findings
  • 5.2 Recommendations
  • 5.3 Conclusion

REFERENCES

APPENDIX


Disclaimer for Complete Material Utilization

The displayed research work titled "Study of factors affecting construction cost performance in Jalingo Taraba State" is stated as a research guideline towards accomplishing your assigned project / seminar research work. All the research materials on this website are ONLY for research purposes and should be used as a guideline in developing your research work. For no reason should you copy word for word as projectlist.com.ng will not be liable for any who copied the material. By ordering the complete research guideline, it signifies that you've accepted our terms of service.


Frequently Asked Questions (FAQ)


Can the material for “Design and Construction of Corn Threshing Machine” be used as a guide for Mechanical Engineering Project?

Yes it can be used — A machine for corn threshing is highly and greatly needed to consistency of usage of corn in local and international levels. With regards to this indispensable needs, a corn threshing machine is designed which operates to remove the corn grains and leaving the cobs intact. The study was conducted to design, construct, test a low-cost corn / maize thresher, evaluate the efficiency of the maize sheller, and use the maize sheller in establishing an agro-processing centre for rural farmers. In attainment to this design objective and aims, a proper considerations was given to the machinability factor which includes installation, simplification, durability, choice material, machine, low costly and prolonged life span when operate with high utilization with minimal down fine. The …


Can this topic “Single Phase Auto-Transformer of Rating Ikva, 240v/110, 80 12v, 6v” be used for Electrical / Electronics Engineering (EE) Project?

Yes it can be utilized for research — This project work-up deals on the design and construction of a single phase step down nations fermor, with raking IKVA, 240V/11OV, 80V 12U, 6V. It is a multi-circuit transformer that has one input as the primary and tappins to produce the output (secondary). It is considered as a single coil in series with the supply and a common coil to the head. It is experimentally done using flat metal shocks of cast steel to form the “E” and “I” shaped laminations and coils of various turns. Not much progress has been made by those who were in the field in the production of a much circuit auto-transformer. While working this project, we got information from some textbooks on auto-transformer and …


Can this topic “Design and Implementation of Payroll Management System” be used for Computer Science (CS) Project?

Yes it can be utilized for research — A payroll system is software which organizes and arranges all the tasks of employee payment and the filing of employee taxes. The aim of the study is to design and implement a Payroll Management System that will eliminate the problems of the existing system. In achieving this aim, the following specific objectives were laid out as follows to develop an application software that will calculate the basic salary and allowance of staff, provide an easy way not only to automate all functionalities involved, and manage the leaves and Payroll for the employees of the Federal Polytechnic Nekede. The motivation that led to the implementation of the proposed system, is as a result of the difficulty in handling personnel records and …


Can this topic “The Midwife-led Continuity of Care on Women and Babies during the Postnatal Period” be used for Midwifery Project?

Yes it can be utilized for research — The study scrutinized the Midwife-led Continuity of Care on Women and Babies during the Postnatal Period. In achieving this aim, the following specific objectives were laid out to examine the potentiality of midwives adherence to midwifery continuity of care on Women and Babies during the Postnatal Period and determine whether the midwives are having positive thinking and potentiality to adhere to Midwife-led Continuity of Care or not. Midwife-led continuity of care has generally improved continuity of care over a period of time. However, the general literature on continuity notes that a lack of clarity in definition and measurement of different types of continuity has been one of the limitations in research in this field. It is mostly accepted that Midwife-led …


Can the material for “Proposed Poultry Feed Mill Processing Factory” be used as a guide for Architecture Project?

Yes it can be used — This research envisages the establishment of a plant for the production of poultry feed with a capacity of 2500 tons per annum. Poultry feed it's a balanced feed which aids proper development of chicks and pullet. Poultry feed mill processing factory provided opportunity of employment to the unemployed people of the proposed area. The state requirement of poultry feed is met through local production. The principal raw materials required are maize, rice polish, rice bran, groundnut cake, soya beans, fish meal, vitamin and salt. All the raw materials are locally available except vitamin which is to be imported. The project will create backward linkage with the agricultural and Agro-processing Sectors and forward linkage with poultry sector and also generated income …


Can the material for “Web Based Point of Sales (POS) for Business” be used as a guide for Computer Science (CS) Project?

Yes it can be used — The global community especially the technologically advanced world is striving to attain what has been the global information age. It is an age that is envisaged to go beyond the use of computers as a mere tool for fast information processing, rather they will also become medium for processing and transferring such information from one location to another at equal fast rate. As a result, it’s appalling that sales in developing country like Nigeria have not been able to benefit much from this revolutionized age of Information technology especially in the area of computerized Sales. A computerized sale management and control system is a computer program which takes the best out of a manual system and electronic cash registers features. …


Can the material for “Accessing the Impact of Poor Housing Plan on Residence Health” be used as a guide for Estate Management (EM) Project?

Yes it can be used — The study was carried out to examine the Impact of Poor Housing Plan on Residence Health. In achieving this aim, the following specific objectives were laid out to ascertain the impacts of housing on the health of Nigerians and determine the effect of this housing Estate on the residential housing provision in the area under review. Investigation revealed that the gross level of housing deficit in Nigeria has exposed many of the citizens to various health risks relating directly to poor housing. The Government all over the world especially in developing countries embarks on the provision of housing Estate for their Wizens; this is usually to argument housing provision by the private sector of the economy. The research design used …


Can the material for “Statutory Audit an Effective Tool of Management Control in a Manufacturing Company” be used as a guide for Accounting Technology Project?

Yes it can be used — This research work is aimed at identifying the importance of statutory audit to management control. Statutory audits made mandatory by legislations for business organisation. These legislations include the CAMA 1990 (Company and Allied Matters Act) BOFID 1991 (Bank and Other Financial Institutions Decree). Chapter one contains an introduction of the topic in relation to manufacturing companies, which goes through process to the products of their organisation. It further stretches across various research heating of chapter one. Such as objective of the study, delimitation, research questions, hypothesis and definition of terms. Chapter two basically in details discussed literature review; a check into other materials written by experts concerning the selected topic. The third chapter examines the methods used in acquiring and collecting data which were …


Is the topic “Design and Implementation of Birthday Alarm System for Lecturers” recommended for Computer Science (CS) Project?

Yes it is highly recommended — Birthday alarm system for Lecturers is a simple program that reminds students of their lecturers’ birthdays. The aim of the study is to design and implement a Birthday Alarm System for Lecturers. In achieving this aim, the specific objectives were set out as follows to develop an application software that will enable the Birthday Alarm System for Lecturers to be compatible in any browser accessible devices and facilitate early notification / reminder of scheduled lecture’s birthday. The motivation that led to the implementation of the proposed system is that lecturers sometimes forget their birthday and the existing system lacks compatible devices to execute the application software. The methodology adopted in this study is the structured system analysis and design methodology …


Can the material for “Design and Implementation of a Computerized Management System for Cargo Transportation” be used as a guide for Computer Science (CS) Project?

Yes it can be used — This project was out of the necessity to address the inherent problems encountered by members of staff of super maritime shipping Agency and their customers. The manual process involved in the management of cargo were critical examined and the flows noted. The software so designed offers to a great extent, the solutions to these problems. The project went further to ret the different techniques used in implementing the newly design software in order to facilitate a broader understanding of the design software by any user. …



Chat with us on WhatsApp