ROUTE SURVEY OF 4KM FROM NKWOEMEKE TO UBOWALA EMEKUKU IN OWERRI NORTH LOCAL GOVERNMENT AREA OF IMO STATE
ABSTRACT
This project was carried out in Emekuku ranging from Ubowala Autonomous Community in Owerri North to Umuaguru Isinkor in Ikeduru Local Government Area of Imo State, covering a distance of 4,558.065 meters (4km). The method used in carrying out the project was integrated approach which involves 3D data acquisition by the combination of traversing and trigonometric heighting using total station.
It is also carried out to acquire data for design and construction of works such as roads, railways, pipe lines, canals etc. Various instruments/tools were used to enable data capturing for the prosecution of the project in order to check met the amount of accuracy obtained. The instrument used for this project is total station kolida (KTS 44-2L), it reads in 5 seconds, it was used in carrying out traversing and cross section of the study area.
Various test such as horizontal collimation test were carried out before the commencement of the project. Temporally Benchmarks were established using hand held GPS at the starting point, change point and at the end of the 4,558.065 meters (4km) chainage. The height of all points including the beginning of curve was determined with total station and reflector as a target.
The cross-section was run with total station at every 25m interval along the line of the road. The data acquired on course of this project was used to plot the longitudinal profile of the road using Auto Card for plotting, Goecal for the computation and survey soft with a scale of 1:3500 respectively.
Ten (10) personnel were involved in the project exercise. The project write up consists of five chapters. Chapter one is introduction, chapter two shows the literature review, chapter three explains the method of data acquisition, chapter four focuses on analysis of results and chapter five states the problems encountered, summary, conclusion, recommendations, and references.
CHAPTER ONE
1.0 Introduction
A route survey is collection operation to gather information about the proposed route of a roadway, utility pipe or railway.
The details of the method of surveying to be used in a given project depends upon the topography, the nature of the project and other factors.
In this modern age, the goods system of transportation has actually become a measure of country's economic and social development. While discussing the effect of good transportation system, it may be said that the increase in productivity and efficient transportation can lower the cost of production; the transportation cost is always an influencing factors of cost of commodity.
Route survey involves activities like planning, designing and execution of survey for the location design, construction operation and maintenance of good engineering project.
Route survey is required for all phase of planning designing and construction of transportation facilities. The rehabilitation of existing road include the terrain data design, the engineer should prepare the plan with specification deferring the work to be done vividly.
Seeing the fact that state government has limited resources to carter for the survey needs of the state, the department of surveying and geoinformatics federal polytechnic Nekede Owerri sees it as a wise decision to contribute towards the national development by helping in construction of 4KM road in Emekuku Owerri north L.G.A to Umuagwu Isinkwo in Ikeduru Imo State through surveying of the road.
The data collected can a well be submitted to ministry of work as a record which could be reviewed wherever the state government wants to embark on the maintenance of this road. Subsequently, this project was allocated to a particular group in the award of higher national diploma (HND) this project was carried out using total station, measuring tape, GPS, reflector.
1.2 Aim of Study
The aim of this project is to gather relevant information of the said route by determining the longitudinal section for profile, along Umuagwuisinkwo North Local Government Areas in Imo State; keeping in view the method and technology of achieving a successful route /road construction project and the stand and of these road construction project.
1.3 Objectives of Study
- To analysis process and present the data in digital format.
- To design the formation level of the road and also the cut and fill.
- To provide formation (data) that are needed to show or portray the nature of terrain along the centre line of the road.
- To provide information needed for the construction of the route.
1.4 Scope of the Study
The scope of this covers the total distances of about 4KM. it started at Emekuku chainage 0+00 and ended at Umugwuisisnkwo it involve route surveying methods and techniques using the following operation.
- Traversing along the centre line of the route.
- Profile leveling
- Production of plan using Microsoft excel and survey soft and plot the following survey.
- Traversing
- Profile
1.5 Study Area
The project site is located at Emekuku in Owerri north to Umuagwuisinkwo Local government in Ikeduru Area of Imo State.
Coordinate of Emekuku
Latitude coordinate 50 28' 14”
Longitude coordinate 70 06' 13”
1.6 Other Miscellaneous Services
- Survey to show the final product of the construction
- Survey to find out what the existing condition is (preliminary survey)
- Survey to monitor determination of the project (post excavation survey).
- Survey to stakeout the processed data on the ground (location survey).
CHAPTER TWO
2.0 Literature Review
2.1 Introduction
The review of relevant literature is the main topic of this chapter. A literature review covers theoretical and methodological contributions to a certain issue in addition to the state of knowledge at the time of writing. It provides information about the state of the art in relation to the subject you are writing about. It examines the body of work on the chosen subject. The literature evaluation in this study comprises the …
Procedure for Downloading the PDF (Docx) Material
Route Survey of 4Km From Nkwoemeke to Ubowala Emekuku in Owerri North Local Government Area of Imo State can be downloaded by requesting the full set of materials at the project or seminar cost. The document will be sent via Microsoft Word (MS-Word) format via WhatsApp (e-mail) following payment confirmation.
Seminar Material Cost ₦3,000 | Project Material Cost ₦5,000 |
Request Complete Material
Click here to request the Complete Material via WhatsApp including;
|
TABLE OF CONTENTSPRELIMINARY PAGES
- Title page
- Approval page
- Dedication
- Acknowledgement
- Table of Contents
- Abstract
- 1.1 Introduction
- 1.2 Aim
- 1.3 Objectives
- 1.4 Scope of study
- 1.5 Study area
- 1.6 Other miscellaneous service
- 2.0 Literature review
- 3.0 Methodology
- 3.1 Reconnaissance
- 3.1.1 Office reconnaissance
- 3.1.2 Field reconnaissance
- 3.1.3 Data acquisition
- 3.2 Instruments used
- 3.3 Personnel
- 3.4 Instrument test
- 3.4.1 Horizontal collimation test
- 3.4.2 Optical plumet test
- 3.4.3 Total station EDM test
- 3.5 Traversing
- 3.6 Linear measurement
- 3.7 Leveling
- 3.8 Detailing
- 4.0 Data Analysis Processing and Presentation
- 4.1 Preambles
- 4.2 Linear measurement reduction
- 4.3 Computation of co-ordinate
- 4.4 Computation of initial bearing
- 4.5 Computation of unadjusted co-ordinate
- 4.6 Computation of final co-ordinate
- 4.7 Data presentation
- 4.8 Plotting of traverse
- 4.8.1 Procedure for plotting of profile using land development involves the following steps
- 4.8.2 Entity / layer creation
- 5.0 Summary, Problem encountered, Recommendations and Conclusion
- 5.1 Summary
- 5.2 Problem encountered
- 5.3 Conclusion
REFERENCES
APPENDIX
Disclaimer for Complete Material Utilization
The displayed research work titled "Route Survey of 4Km From Nkwoemeke to Ubowala Emekuku in Owerri North Local Government Area of Imo State" is stated as a research guideline towards accomplishing your assigned project / seminar research work. All the research materials on this website are ONLY for research purposes and should be used as a guideline in developing your research work. For no reason should you copy word for word as projectlist.com.ng will not be liable for any who copied the material. By ordering the complete research guideline, it signifies that you've accepted our terms of service.
PRELIMINARY PAGES
- Title page
- Approval page
- Dedication
- Acknowledgement
- Table of Contents
- Abstract
- 1.1 Introduction
- 1.2 Aim
- 1.3 Objectives
- 1.4 Scope of study
- 1.5 Study area
- 1.6 Other miscellaneous service
- 2.0 Literature review
- 3.0 Methodology
- 3.1 Reconnaissance
- 3.1.1 Office reconnaissance
- 3.1.2 Field reconnaissance
- 3.1.3 Data acquisition
- 3.2 Instruments used
- 3.3 Personnel
- 3.4 Instrument test
- 3.4.1 Horizontal collimation test
- 3.4.2 Optical plumet test
- 3.4.3 Total station EDM test
- 3.5 Traversing
- 3.6 Linear measurement
- 3.7 Leveling
- 3.8 Detailing
- 4.0 Data Analysis Processing and Presentation
- 4.1 Preambles
- 4.2 Linear measurement reduction
- 4.3 Computation of co-ordinate
- 4.4 Computation of initial bearing
- 4.5 Computation of unadjusted co-ordinate
- 4.6 Computation of final co-ordinate
- 4.7 Data presentation
- 4.8 Plotting of traverse
- 4.8.1 Procedure for plotting of profile using land development involves the following steps
- 4.8.2 Entity / layer creation
- 5.0 Summary, Problem encountered, Recommendations and Conclusion
- 5.1 Summary
- 5.2 Problem encountered
- 5.3 Conclusion
REFERENCES
APPENDIX
Disclaimer for Complete Material Utilization
The displayed research work titled "Route Survey of 4Km From Nkwoemeke to Ubowala Emekuku in Owerri North Local Government Area of Imo State" is stated as a research guideline towards accomplishing your assigned project / seminar research work. All the research materials on this website are ONLY for research purposes and should be used as a guideline in developing your research work. For no reason should you copy word for word as projectlist.com.ng will not be liable for any who copied the material. By ordering the complete research guideline, it signifies that you've accepted our terms of service.
Frequently Asked Questions (FAQ)
Can the material for “Impacts of Information and Communication Technology on Business Organisation Performance” be used as a guide for Business Administration and Management (BAM) Project?
Yes it can be used — This research work was carried out to determine the Impact of Information and Communication Technology on Banking Industry and First Bank of Nigeria Plc. (Iganmu Branch) has been used for the purpose of this study. A survey of (200) Two Hundred respondent were used comprising all the middle and the top management of First Bank of Nigeria Plc. (Iganmu Branch). Data were generated through primary and Secondary Sources. The Primary Data were collected through the Administration of Questionnaire from the respondent. The Secondary Data were generated from collection of different related Textbooks, Journals and the internet. The analysis of the questionnaire was done using simple percentage approach and the Karl Pearson Chi – Square Statistic to test the hypothesis. The result of …
Can the material for “Effect of Bank Failure on Nigeria Economic Development” be used as a guide for Banking and Finance (BF) Project?
Yes it can be used — Effect of bank failure and economic development in Nigerian Banks occupy the most strategic point in the financial system of the economy for a total of bank to fait between 1992 to 2002 a space of four years, means that something definitely is wrong. This study is not antagonistic of any other rather it is complementary. Others works have to been used here and duty acknowledge but everything is with an intent to find a lasting solution to the issue of bank failure. The study will be base upon data collected through information sifted from books journals annuals, periodicals. All the relevant data obtain during the collection is going to be analyze generally ad used to deduce the findings. In the process of this …
Is the topic “An Investigation Into the Attitudes of Family Planning Among Health Care Users and Market Women” recommended for Guidance and Counselling Project?
Yes it is highly recommended — This study examined the influence of attitude on family planning among the health workers and market women in Ikosi/Iheri Local Government Area of Lagos State. The objectives of this research were to find out the influence of family size, socio-economic status of families, marital status and religion on the health care users and market women attitude towards family planning. Four research questions and research hypotheses were stated for the study, the research design was survey in nature. The total number of 90 women of child bearing age were selected using the simple random method. The t-test of significance was employed to test the null hypotheses stated for the study. The of this research include the study revealed that family size will …
Is the topic “An Assessment of the Management Performance of Public Enterprises” recommended for Business Administration and Management (BAM) Project?
Yes it is highly recommended — This study was conducted to assess the management performance of public enterprises in Nigeria using Enugu state transport company as a case of study. The researcher using the questionnaire method collected first hand information from the management and staff of the company in question. Interviews were also granted to some selected management staff. Based on the findings, the researcher were able to draw reasonable, conclusions from where they were able to give useful recommendations which they strongly immuned that if religiously followed will liberate government owned company from immuned decay. …
Can the material for “Human Resource Management and Local Government Productivity” be used as a guide for Public Administration (PA) Project?
Yes it can be used — This research work is a conceptual frame work of Human Resource Management and Local Government Productivity. The aim of this research work is to investigate the Impact of Human Resource Management on Local Government Production level. with particular reference to Amuwo Odofin Local Government Area. This study also covers the various principles of human resource management such as manpower planning or procurement; Training and Development Performance Appraisal, problems of Local Government etc. This research work will be beneficial to the local government managers, the populace of the local area, and other researcher in Local Government issues. This study discussed the procedure for data through the means of secondary source aim at presenting analysis and interpreting the research findings. The null hypothesis tested was …
Can the material for “Installmental Payments Plans in Real Estate Development and Their Effects on Housing Delivery” be used as a guide for Estate Management (EM) Project?
Yes it can be used — The study scrutinizes the Installmental Payments Plans in Real Estate Development and Their Effects on Housing Delivery. In achieving this aim, the following specific objectives were laid out to examine the modern strategies that can be used for effective housing delivery, and examine the challenges associated with real estate development Installmental Payments Plans in Jim-Surv Estate, Sabon Lugbe East Extension Layout Lugbe, Abuja FCT. The motivation that led to this research is the problem encountered in housing delivery which is of great concern in many countries. This problem is especially prominent in Nigeria. The challenge as been magnified as a result of a myriad of issues, not least, a high population growth rate, shortage of necessary skills and disintegrated supply …
Can the material for “Management Strategies of Conflict Between Academic and Non-Academic Staff” be used as a guide for Education Project?
Yes it can be used — This study investigated management strategies of conflict between academic and non-academic staff of federal universities in South East, Nigeria. The study was guided by nine research questions and nine null hypotheses. The design of the study was descriptive survey. The population of the study was 16,387 respondents. A multi-stage sampling technique was used to select a sample of 1,025 subjects, comprising 527academic and 488 non-academic staff from the universities. Purposive sampling technique was also used to select another 10 academic and non-academic staff for the focus group discussion (FGD). The instrument for data collection was a questionnaire titled: Management Strategies of Conflict Questionnaire (MSCQ) and focus group discussion guide which was put in prose form. The research questions were answered using …
Can the material for “Computer Based Students Id-Card Processing System” be used as a guide for Computer Science (CS) Project?
Yes it can be used — Student identification card processing system is an application software packaged with all of the components needed to be up-and-running and printing Identification Cards within a stipulated period of time. The aim of the study is to design and develop a Computerized Students Id-card Processing System. In achieving this aim, the following specific objectives were laid out to examine the recent procedures employed in IMT Enugu with regards to ID-card processing, design a system with the capability of providing a wait-and-take processed ID-card and design an ID-card processing system that ensures timely processing. The methodology adopted in this study is the object oriented analysis and design methodology (OOADM) which is a technical approach for analyzing and designing an application or system …
Can the material for “The Causes of Conflict and It’s Management in a Modern Day Organization” be used as a guide for Industrial Relations and Personnel Management (IRPM) Project?
Yes it can be used — This research is designed to examine the organizational conflict and its management in modern day organization. Question were used to collect data interview and observation by the researcher. The statistical method used in this research is the chi-square; this method was used to analyse the responses to the question from the questionnaire. The outcome of the analysis is that the null hypothesis was rejected while the alternative hypothesis was accepted. The study revealed that organizational conflict actually exists in organizations. The study recommended any others that adequate care should be taken in handling differences in goals between management and employees. It was concluded that conflict is inevitable in an organization and it is caused by goals difference between management and employees, …
Is the topic “Design and Implementation of an Enhanced Online Visa Processing System” recommended for Computer Science (CS) Project?
Yes it is highly recommended — VISA is a sticker endorsed in the applicant’s passport or other travel document. The aim of the study is to Design and Implement an Enhanced Online Visa Processing System. In achieving this aim, the following specific objectives were laid out as follows to design a: computerized system for online registration, computerized payment platform, system that accurately stores data and retrieves payment history when needed, and computerized system for tracking vacation time, maternity and paternity leave. The Manual systems of visa registration always put pressure on people to be correct in all aspect of their work. With manual systems the level of service is dependent on individuals and this puts a requirement on management to run training continuously for staff to …