The study was conducted to design and construct a Four Way Traffic Light Control Circuit. In achieving this aim, the following specific objectives were laid out to build a prototype four-way traffic light control circuitry and construct a Four Way Traffic Light Control Circuit that will efficiently and effectively control the traffic light for twenty-four hours. This research work has been aimed at efficient means of controlling the traffic effectively for twenty-four hours. As the world is growing technologically more and more vehicles jump into the public road adding to the already existing number. Consequently, more efficient way of controlling the traffics becomes more desirable as compared to the obsolete way of using the traffic personnel's. The design of this traffic light control is grouped basically into three; digital logic design, the power circuit and the power supply design. The digital logic design is based on integrated circuit which happens to be the modern way of designing digital systems, the power circuit design is aimed at lighting the different LEDS as and when due, while the power supply design strives to achieve a constant 8V dc supply for powering the circuit. For this work, the frame with the LEDS mounted on it has been constructed, the driven circuit was implemented and the entire system enclosed in the smoothened frame. The realized work was tested and guaranteed to give a firmly good level of performance.
CHAPTER ONE
1.1 Introduction
Traffic lights, also known as traffic lamps, traffic signals, stoplight, stop-and-go lights semaphore or robots, are signaling devices positioned at pedestrian crossings, road intersections, and other locations to control competing flows of traffic. Traffic lights have installed in most cities around the world to control the flow of traffic. It assign the right of way to road users by the use of lights in standard colors (Red - Yellow - Green), using a universal color code (and a precise sequence, for color blind). Traffic lights are used at busy intersections to more evenly apportion delay to the various users. The increasing amount of traffic in the cities has a large impact on the congestion and the time it takes to reach a certain destination. The traffic light system is made up of all the components and circuits used to realize to lighting effect at the Output.
As a prelude to other parts of this study, this chapter will discuss the background upon which this study was initiated, the statement of problems that led to this study, the Aim and Objectives of the study. Others are Significance of the study, Scope of work, Limitations of the Study and Definition of technical terms.
1.2 Background of Study
In the ever fast-growing world of business and technology today, there has become an increasing column of vehicles on every road in different place of the world. Traffic control light has become a very effective tool for sequential control of the teaming number of vehicles on the road to avert what would have been a recurrent saga of ghastly accidents at the junctions. There have been many ways of achieving this, uppermost among these being the employment of electronic monitoring circuits that which is controlled by presto clock.
In developed countries, the employment of traffic personnel who would be jumped up and down at the centres of the junction just for the motorists to acknowledge their rigorous signs has long come of age. In developing countries where 24 hours traffic flow is involved, many societies are adopting the usage of the traffic light control. The advantage offered by this method of traffic control cannot be over emphasized. For one, it offers a more advanced technology that is less prone to miscalculation and its regrettable occurrence. They stand out better at night, then offer illumination to the immediate surroundings which become important for security purpose and in general add to their entire aesthetic beauty of night life.
The technology behind the design may vary from place to place, but the fact remains that in all cases an electronic (logic) circuit is made to control a power circuit. The electronic logic circuit is normally composed of the basic digital components of electronic design which includes oscillators, timers, counters, decoders, microprocessors, etcetera, while the power circuit includes the lamps and the drivers circuits. The digital circuit is designed to give an output commensurate to the design choice. The power supply unit is designed to generate a steady supply voltage which is used to power the logic circuit.
Traffic lights are signaling devices that are positioned at road intersections, pedestrian crossings or two or more roadways to control the competing flows of vehicle and human traffic in an orderly manner without which the busy roads would be chaotic. This is achieved by providing a visual indication to drivers when to proceed, when to slow down, when to stop and at times when to take a turn. Traffic lights are installed in almost all the cities in the world to control the flow of traffic. They are used to assign the right of way to road users by the use of lights in standard colours (Red Amber Green). They are very useful at busy intersections which are used to evenly apportion delay to the various users on different lanes. These signals may be operated manually or by a simple timer which allows traffic to flow on one roadway for a fixed period of time, and then on the other road-way for another fixed period of time before repeating the cycle.
The output consists of a series of lamps which are expected to light in a particular sequence depending on the design. By the logic circuit design, the lamps are made to come up in a particular sequence depending on the design with each colour meaning different motional status of the vehicles in that column.
Therefore, in Nigeria where the research was carried out, the activities that was conducted is to Design and Construct a Four Way Traffic Light Control Circuit.
1.3 Statement of Problems
Investigation revealed that the need for traffic control started even before the invention of automobiles. Then the traffic consisted of wagons, horse carts, bicycles and pedestrians only, but this on its own caused problems at busy road intersections. To control the traffic, police officers were assigned at the intersections to control the flow of traffic.
1.4 Aim and Objectives of Study
The aim of the study is to Design and Construct a Four Way Traffic Light Control Circuit. In achieving this aim, the following specific objectives were laid out as follows:
- To construct a Four Way Traffic Light Control Circuit that will efficiently and effectively control the traffic light for twenty-four hours.
- To build a prototype four-way traffic light control circuitry.
- To design a system that will direct vehicles in order to illuminating the environment in the night
Going by the rapid advancement in technology all over the world, the need for better ways of solving a problem keep coming up every day. Necessity is the mother of invention. It has become imperative for societies, companies, industries, business ventures, clubs etc to offer 24 hour service, hence thereby has to be a way of controlling the teaming column of vehicles which convey both individuals and goods to different destinations of that type.
The most elegant way of directing the motorists is by the use of traffic light control. This type of control serves a dual purpose. In the day type it directs the vehicles, whereas it turns out to additionally illuminating the environment in the night, so that at very far distance, its effect is noticeably felt, conveying its message to an oncoming vehicle very far from the point.
1.5 Significance of Study
This study will be of immense benefit to Road Safety Officers, Engineering student and other researchers who intend to know more on this study and can also be used by non-researchers to build more on their research work. This study contributes to knowledge and could serve as a guide for other study.
1.6 Scope of Study
The scope of the research is focused on Design and Construction of Four Way Traffic Light Control Circuit.
1.7 Limitations of the Study
During the course of this study, many things militated against its completion, some of which are:
- Time Constraint: The time frame given to accomplish this project was very short due to school academic calendar and it was carried out under pressure which made the researcher not to implement some necessary features.
- Research material: availability of research material is a major setback to the scope of the study.
- Frequent power failure: This made the researcher append more money on fuel to ensure sustainable power.
- Financial Constraint: Insufficient fund tends to impede the efficiency of the researcher in sourcing for the relevant materials, literature or information and in the process of data collection.
1.8 Methodology
Priority was given to the nature of the junction and how far away they are at different seasons of the year. A lot of design research was carried out on digital logic design and choice of digital families. Data books were consulted to make the most suitable choice of components at the most reasonable cost.
After the design, a market survey was conducted and some components used in the design were not obtainable in the market. Hence, alternative components had to be used and the circuit redesigned. The subsequent stage involves physically realizing the design work, constructing and packaging the entire circuitry on the frame. Finally, he work was given a fine finish and tested.
CHAPTER TWO
2.0 Literature Review
2.1 Introduction
The review of relevant literature is the main topic of this chapter. A literature review covers theoretical and methodological contributions to a certain issue in addition to the state of knowledge at the time of writing. It provides information about the state of the art in relation to the subject you are writing about. It examines the body of work on the chosen subject. The literature evaluation in this study comprises the …
Procedure for Downloading the PDF (Docx) Material
Design and Construction of Four Way Traffic Light Control Circuit can be downloaded by requesting the full set of materials at the project or seminar cost. The document will be sent via Microsoft Word (MS-Word) format via WhatsApp (e-mail) following payment confirmation.
Seminar Material Cost ₦3,000 | Project Material Cost ₦5,000 |
Request Complete Material
![]() | Click here to request the Complete Material via WhatsApp including;
|
TABLE OF CONTENTSPRELIMINARY PAGES
- Title page
- Approval page
- Dedication
- Acknowledgement
- Table of Contents
- Abstract
INTRODUCTION
- 1.1 Introduction
- 1.2 Background of Study
- 1.3 Statement of Problems
- 1.4 Aim and Objectives of Study
- 1.5 Significance of Study
- 1.6 Scope of Study
- 1.7 Limitations of the Study
- 1.8 Methodology
LITERATURE REVIEW
- 2.1 Introduction
- 2.2 Conceptual Review of Traffic Light System
- 2.3 The Power Supply Unit
- 2.3.1 The Transformer
- 2.3.2 The Rectifier
- 2.3.3 The Filter
- 2.3.4 The Voltage Regulator
- 2.4 The Digital Logic Circuit
- 2.4.1 The Oscillator
- 2.4.2 The Counter
- 2.4.3 The Decoder
- 2.5 The Logic Gates
- 2.5.1 The Power Circuit
- 2.5.2 The Booster/Amplifier Stage
- 2.5.3 The Lamp/LEDs
MATERIALS AND METHODS
- 3.1 Introduction
- 3.2 The Traffic Light Control Design and Construction
- 3.3 The Power Supply Design Specifications
- 3.3.1 The Transformer
- 3.3.2 Rectifier
- 3.3.3 The Filter Capacitor
- 3.3.4 The Voltage Regulator
- 3.4 The Digital Logic Design
- 3.4.1 The Oscillator
- 3.4.2 The 4017 Decade Counter
- 3.5 The Output Logic Gate Circuit and the Power Circuit
SYSTEM IMPLEMETATION AND COST ANALYSIS
- 4.1 Introduction
- 4.2 Problem Encountered
- 4.3 Construction and Testing
- 4.4 Cost Analysis
SUMMARY, CONCLUSION AND RECOMMENDATION
- 5.1 Introduction
- 5.2 Summary of Findings
- 5.3 Conclusion
- 5.4 Recommendation
REFERENCES
Disclaimer for Complete Material Utilization
The displayed research work titled "Design and Construction of Four Way Traffic Light Control Circuit" is stated as a research guideline towards accomplishing your assigned project / seminar research work. All the research materials on this website are ONLY for research purposes and should be used as a guideline in developing your research work. For no reason should you copy word for word as projectlist.com.ng will not be liable for any who copied the material. By ordering the complete research guideline, it signifies that you've accepted our terms of service.
PRELIMINARY PAGES
- Title page
- Approval page
- Dedication
- Acknowledgement
- Table of Contents
- Abstract
INTRODUCTION
- 1.1 Introduction
- 1.2 Background of Study
- 1.3 Statement of Problems
- 1.4 Aim and Objectives of Study
- 1.5 Significance of Study
- 1.6 Scope of Study
- 1.7 Limitations of the Study
- 1.8 Methodology
LITERATURE REVIEW
- 2.1 Introduction
- 2.2 Conceptual Review of Traffic Light System
- 2.3 The Power Supply Unit
- 2.3.1 The Transformer
- 2.3.2 The Rectifier
- 2.3.3 The Filter
- 2.3.4 The Voltage Regulator
- 2.4 The Digital Logic Circuit
- 2.4.1 The Oscillator
- 2.4.2 The Counter
- 2.4.3 The Decoder
- 2.5 The Logic Gates
- 2.5.1 The Power Circuit
- 2.5.2 The Booster/Amplifier Stage
- 2.5.3 The Lamp/LEDs
MATERIALS AND METHODS
- 3.1 Introduction
- 3.2 The Traffic Light Control Design and Construction
- 3.3 The Power Supply Design Specifications
- 3.3.1 The Transformer
- 3.3.2 Rectifier
- 3.3.3 The Filter Capacitor
- 3.3.4 The Voltage Regulator
- 3.4 The Digital Logic Design
- 3.4.1 The Oscillator
- 3.4.2 The 4017 Decade Counter
- 3.5 The Output Logic Gate Circuit and the Power Circuit
SYSTEM IMPLEMETATION AND COST ANALYSIS
- 4.1 Introduction
- 4.2 Problem Encountered
- 4.3 Construction and Testing
- 4.4 Cost Analysis
SUMMARY, CONCLUSION AND RECOMMENDATION
- 5.1 Introduction
- 5.2 Summary of Findings
- 5.3 Conclusion
- 5.4 Recommendation
REFERENCES
Disclaimer for Complete Material Utilization
The displayed research work titled "Design and Construction of Four Way Traffic Light Control Circuit" is stated as a research guideline towards accomplishing your assigned project / seminar research work. All the research materials on this website are ONLY for research purposes and should be used as a guideline in developing your research work. For no reason should you copy word for word as projectlist.com.ng will not be liable for any who copied the material. By ordering the complete research guideline, it signifies that you've accepted our terms of service.
Frequently Asked Questions (FAQ)
Can the material for “Regression Analysis on National Income From 1998 - 2003” be used as a guide for Statistics Project?
Yes it can be used — The study investigates the regression analysis of national income and government aggregate expenditure in Nigeria by testing the validity of Wagner’s law and Keynes’s hypothesis for the period between 1970 and 2014. National income is an uncertain term and is often used interchangeably with the national dividend, national output, and national expenditure. National Income is the total amount of income accruing to a country from economic activities in a fixed period of time (i.e., One Year). It includes payments made to all resources either in the form of wages, interest, rent, and profits. More specifically, by applying time-series analysis, government-spending and national-income variables were found to be non-stationary and cointegrated, thus satisfying a long-run equilibrium condition. In addition, through the …
Can the material for “The Impact of Financial Incentives on Employee Productivity in Public Sector” be used as a guide for Business Administration and Management (BAM) Project?
Yes it can be used — Financial incentive is a form of financial encouragement recognizing a particular contribution made by the work force. The study was carried out to examine the Impact of Financial Incentives on Employee Productivity in Public Sector using Kwara State Ministry of Works Ilorin as a case study. In achieving this aim, the following specific objectives were laid out to examine the employee financial incentive that leads to increase productivity and identify the cause of low productivity in the area under review. Investigation revealed that financial incentives have created a lot of challenges to employee’s input and output in organization. The negligence of adequate structure in pay incentive, fringe incentive, and bonus and over time benefits has caused a lot of inequitable …
Can the material for “Voters’ Behaviour and the 2015 General Election Process in Nigeria” be used as a guide for Political Science Project?
Yes it can be used — Nigeria is one of the most ethnically and religiously diverse country in Africa, and over time ethnic and religious considerations have been built into the electoral system itself. These factors were overly observed in the 2015 general elections, Monitor (2015)reports that on a geo-political zone basis, the South-Southhad the greatest voter turnout with 59% closely followed by the North-West with 54%. The South-West had the lowest turnout in the country with just 37%. This study investigated voters’ behaviour and the 2015 general election process in Nigeria. The study adopted qualitative approach. The success of the study relied mainly on secondary data which were sourced from textbooks, newspapers, magazines, from archives of libraries like the Covenant University, Ota, University of Lagos …
Can the material for “State Police and Curtailment of Security Crises in Nigeria” be used as a guide for Criminology and Security Studies Project?
Yes it can be used — The study was carried out to scrutinize the State Police and Curtailment of Security Crises in Nigeria. In achieving this aim, the following specific objectives were laid out to investigate the causes of ineffectiveness of centralized police and assess the impact of established state police in Niger Delta. Investigation revealed that Niger Delta security crises at every point in time have threatened the primacy responsibility of the government in terms of security of lives and properties and the preservation of oneness of Nigeria as a single political entity. The research design used in this report is descriptive design, utilizing questionnaire method to obtain information from the respondents for this project. A total of 133 (one hundred and thirty three) respondents …
Can the material for “An Appraisal of the Factors That Influence Consumer Choice for Cigarette Brands” be used as a guide for Business Administration and Management (BAM) Project?
Yes it can be used — This study is no the appraisal of the factors that influence consumers choice for cigarette brands in Enugu metropolis The research instrument which will be used for data collection are mainly questionnaire, structured and unstructured interview. The needed data will be collected from the respondents. The data collected in five (5) districts will be tabulated into frequencies and percentages, chin square statistics will also be used to analysis and test various hypothesis. However, the conclusion of the study will be that if will help firms to determine the things required of them so as, to complete favorably in the industry. The write-up is divided into three chapter the first character, introduced the general background of the study, the problems, importance, and definition of …
Can this topic “Design and Implementation of a Web Based Discussion Forum for Computer Science and Engineering Students” be used for Computer Science (CS) Project?
Yes it can be utilized for research — Web Based forums also known as discussion boards enable users of a website to interact with each other by exchanging tips and discussing topics related to a certain theme. The aim of the study is to design and implement a Web Based Discussion Forum for Computer Science and Engineering Students. In achieving this aim, the following specific objectives were laid out as follows to develop an application software that will protect information from unauthorized users by implementing role based security and implement a secured web forum for students and lecturers of the Department Of Computer Science, University of Port Harcourt. The motivation that led to the implementation of the proposed system is that due to busy schedules of lecturers, they find …
Can the material for “Loan Syndication as a Means of Project Finance in Nigeria” be used as a guide for Finance Project?
Yes it can be used — The study was focused on the effectiveness of loan syndication as a means of project finance in Nigeria with a particular reference to Assess Bank of Nigeria plc, Benin City. The study examines the extent to which loan syndication has contributed to the performance of the Nigeria enterprise. Data was collected through the administration of questionnaire numbering sixty (60) of which forty (40) were answered and returned. The responses from the returned questionnaire form the data for the research work. This data were analyzed on the basis of simple percentage while the chi-square were employed in the test of the hypothesis. The study reveals that loan syndication has improved the performance of the Nigeria enterprise. It has not been significantly …
Can the material for “Relationship Between Resource Planning and School Organizational Performance” be used as a guide for Education Project?
Yes it can be used — The study attempted to investigate the relationship between resource planning and school organizational performance in selected secondary schools in Mainland Local Government Area of Lagos State. The study equally reviewed some important and extensive literatures under sub-headings. The descriptive research survey design was applied in the assessment of respondents’ opinions towards the subject matter. In this study, five null hypotheses were formulated and tested with the application of the independent t-test and the Pearson Product Moment Correltional Coefficient Statistical tools at 0.05 significance level. Also, the simple percentage frequency counts was used to analyse the questionnaire response of the selected respondents together with the research questions. A total of 140 (one hundred and forty) teachers were selected for this study. At …
Can the material for “The Impact of Entrepreneurship in the Economic Development of the Nigeria Economy” be used as a guide for Entrepreneurship Project?
Yes it can be used — The study scrutinized the Impact of Entrepreneurship in the Economic Development of the Nigeria Economy. In achieving this aim, the following specific objectives were laid out to investigate the prevalence of entrepreneurship on the Nigeria economic growth and assess out the contributions of entrepreneurs to the economic development in Nigeria. The research design used in this report is descriptive design, utilizing questionnaire method to obtain information from the respondents for this project. A total of 133 (one hundred and thirty three) respondents were selected for this study to represent the entire population of the study. For null hypotheses were formulated and tested using the one-way ANOVA and the t-test statistical tools at zero point zero five (0.05) level of significance. …
Is the topic “Design and Implementation of a Computerized Company Premises Directory System” recommended for Computer Science (CS) Project?
Yes it is highly recommended — The software package used in this protect is quick Basic which centered on soloing the problem of relational business activities arising from modern transactions For the fact that individual, private and public organization have problem of visiting their clients or customer in different locals for a particular purpose, this then given the need of using complementary cards which may be thousands in numbers so, because of these cards in large number, it development a problem of sorting different organization in a particular location. This project will solve the above mentioned problem by a way of listing the relational information business organization in a particular location at Enugu city to solve his directory problem with ease of getting the location of organization and …