CONSTRUCTION OF A 2.5KW UNINTERRUPTIBLE POWER SUPPLY (UPS) SYSTEM
ABSTRACT
Power supplies from mains supply in Nigeria are neither steady nor clean. Many abnormalities such as spikes, sags (brownouts) surges and noise can occur. Under the best conditions, power interruptions can be an inconvenience.
At their worst, they can cause loss of data in computer systems, damage to vulnerable electronic devices, break in transmission of information and even loss of human life.
As a result of these inconveniences, Uninterruptible Power Supply (UPS) systems were constructed to minimize interruptions from Power Supply Units (PSUs). The UPS acts as a buffer and provides clean, reliable power to vulnerable electronic equipments for a certain (short) period of time.
At least a time that would be enough to save datas and properly shutdown the protected machine or effect a power change over.
Finally, this project “Uninterruptible power supply (UPS) system” after construction and testing was able to give us an output of 2.5KW which after charged was used to power a computer system and we got a dwell-time of 7-10 minutes. However, after a blackout has occurred, this UPS can provide power to the connected equipment for short period of time.
CHAPTER ONE
1.0 Introduction
It is pertinent to say that “Power” be it mechanical, solar and other sources more especially electrical is the bedrock of human existence on earth. Man through the generation of power can appreciate the fullness of the environment.
It is quite inconveniencing that constant power interruption and blackout is a very big problem in our country “Nigeria”. The constant power outages we are experiencing maybe as a result of poor power distribution, maintenance culture, personnel and low quality equipment.
To this effect, many premises dealing with highly sensitive equipment and the likes requires a reliable standby or backup power supply to guide against the epileptic power supply; hence, “The Uninterruptible Power Supply (UPS) system”
1.1 Definition
The Uninterruptible power supply (UPS) system is an electrical/electronic device that continues to supply electricity to the load for a certain period of time during a utility failure or when the line voltage varies outside the normal limits. Its typical application is in computer as a backup power. Lager modules can be used to power even an entire home.
Uninterruptible power supply (UPS) systems have been on the market for approximately 20years. These devices were originally developed to provide protection against the loss of data in a computer systems and computer driven machines because of sudden power failure and to effect an orderly shutdown in the event of power interruptions also enable users to save data that otherwise would be lost.
1.2 Advancement
Advancement in technology have improved and expanded the functions of UPS systems. Smaller more powerful devices are being sold to meet the requirements of changing markets. The increase in the number of data centers, telecommunication functions and the rise in networking have changed the demands of power management.
To reduce the risk of loosing data in the computer systems, break in telecommunication networks and burning of sophisticated electronic equipments to power failure of disturbances in power generation, many companies protects her equipments with Uninterruptible Power Supply(UPS) systems.
1.3 Mains Supply
A UPS takes its power from two or more sources simultaneously. It is usually powered directly from AC mains, while at the same time charging a storage battery. Should there be a dropout or failure of the mains, the battery instantly takes over so that the load never experiences an interruption.
Such a scheme can supply power as long as the battery charge suffices; for example, in a computer installation, giving the operator sufficient time to effect an orderly shutdown without loss of data or process. Other scheme of UPS may use an internal combustion engine or turbine to continuously supply power to a system in parallel with power coming from AC mains.
The engine-driven generators would normally be idling, but could come to full power in a matter of few seconds in order to keep vital equipments running without interruption. Such a scheme might found in hospitals or telephone central offices.
Perhaps, power from a wall socket is neither clean nor uninterruptible. Many abnormalities such as blackouts, brownouts or sags, spike, surges and noise from large machines can occur. Under the best conditions, power interruptions can be quite inconveniencing.
At their worst, they can cause loss of data in computer systems, damage to sophisticated electronic equipment and even loss of human life. Because of there inconveniences, it is necessary to have an Uninterruptible Power Supply (UPS) system which acts as a buffer and provides clean, reliable power to those vulnerable electronic equipment.
1.4 Generic Standard
The generic standard for UPS systems is IEC 62040 – 3, which defines limits on the amplitude and duration of deviation of the output voltage acceptable for switching power supply system (SMPS) load.
1.5 Principle Of Operation
During normal supply of the utility power, the output load is fed directly from the AC main's source while supplying the charger that would charge the battery simultaneously.
When the utility power source fail, the battery become a source of power to the inverter which eventually converts the 12V DC-to-220V AC or so in order to carry the connected load.
From the block diagram above, the AC mains is connected directly to the Automatic Bypass switch (electromechanical switch or relay) which closes in one way and opens in the other to bypass the inverter and supply the load directly or opens in one way and closes in the other to bypass the AC mains to supply the load from the inverter.
The battery charger is charging the battery simultaneously while the inverter at this point is redundant.
Should there be a mains failure, the transfer switch closes then the battery energizes the inverter which in turn inverts or converts the 12V DC-to-220V AC or so that will now supply the connected load.
From the Block diagram of figure3.6 in chapter three, the mains supply is connected directly to the Bypass switch (electromechanical switch or relay) then to the load.
From the main also comes the connection of the battery charger section which includes:
- A step-down transformer
- A bridge rectifier and
- A filter circuit.
– From the mains, a step-down transformer that steps 220V AC to 15V AC is connected (a portion of the charge voltage which would be charging must be a bit higher than that which is to be charged).
– From the step-down transformer, a bridge rectifier is connected which will in turn do that actual conversion from 15V AC to 12V DC.
– A filter circuit which is made up of inductors and capacitors is connected from the rectification circuit (bridge rectifier). The filter circuit removes or filter out ripples (i.e. it removes some portion of the AC that the bridge rectifier could not remove during or after rectification) in order to have clean dc output to the battery.
– From the charging section which ends at the filter circuit comes the connection of the battery perhaps 12V DC to be charged.
– A transfer switch which transfers power from the battery to the inverter section is connected
– From the transfer switch, the inverter unit which is made up of :
- The Oscillator circuit
- The Transistor circuit and
- The Step-up Transformer is connected.
– The oscillator (Astable Multivibrator) which generates pulses (square wave output) to ensure that the transistors switches exactly when they are meant to switch is connected followed by the high speed switch (FET) transistor.
– The transistor (FET) here serves as power switches and functions as current amplifier in addition to rectification when a battery is connected.
– From the transistor (high speed switch FET), a step-up transformer is connected which converts the 12V DC t0 220V AC or so.
– All the sub-unit as mentioned here are connected to the automatic bypass switch (electromechanical switch or relay) that filly link the output load.
1.6 Classification
Research on this project has classified UPS systems into three main classes; namely:
- Standby or offline UPS
- On-line UPS and
- Line Interactive UPS
It also examines the status of rotary flywheel UPS technology, typically used to protect very large installations with high capacity requirements.
A standby or flywheel UPS technology typically used to protect very large installations with high capacity requirements.
A standby or offline UPS are connected via an electrical relay. When the voltage goes above or below a certain level, the relay opens and the voltage is recreated using the energy stored in the battery.
An On-line UPS are connected in series and constantly regulates voltage. Online UPS always delivers all or at least a portion of output power through its inverter even under normal line condition and therefore provides true uninterruptible power. While
The line interactive UPS are a hybrid technology, connected in parallel. This UPS under normal conditions smooth out and to some degree regulate the input AC voltages by a filter and a tap changing transformer.
In addition, the basic concept of a UPS system is to store energy during normal operation through battery charging system otherwise known as “charger” and releases energy through DC to AC conversion known as “Inverter” during a power failure. UPS is typically used to protect computers, data centers, telecommunication equipments and sophisticated electronic equipment where an unexpected power disruption could cause injuries, serious business disruption and/ or data loss.
1.7 Roles Of Ups
In all, the primary role of a UPS is to provide short-time power when the input power source fails.
A UPS does three main things for you. They are as follows:
- It filters the power your machine sees, smoothing out spikes and voltage fluctuations that can stress or even damage your electronics.
- It provides a certain amount of dwell time in the event your power goes out entirely. This can often get you through brownouts and short blackouts.
- When the UPS is about to run out of power, it can arrange a graceful shutdown of your computer system so that no unpleasant things happen to your disk file systems. Because ensuring a clean shutdown is still a valuable contribution to any system administrator's peace of mind.
This material contains electrical diagrams, circuits, illustrations and more (Very detailed)
CHAPTER TWO
2.0 Literature Review
2.1 Introduction
The review of relevant literature is the main topic of this chapter. A literature review covers theoretical and methodological contributions to a certain issue in addition to the state of knowledge at the time of writing. It provides information about the state of the art in relation to the subject you are writing about. It examines the body of work on the chosen subject. The literature evaluation in this study comprises the …
Procedure for Downloading the PDF (Docx) Material
Construction of a 2.5Kw Uninterruptible Power Supply (UPS) System can be downloaded by requesting the full set of materials at the project or seminar cost. The document will be sent via Microsoft Word (MS-Word) format via WhatsApp (e-mail) following payment confirmation.
Seminar Material Cost ₦3,000 | Project Material Cost ₦5,000 |
Request Complete Material
![]() | Click here to request the Complete Material via WhatsApp including;
|
TABLE OF CONTENTSPRELIMINARY PAGES
- Title page
- Approval page
- Dedication
- Acknowledgement
- Table of Contents
- Abstract
- 1.0 Introduction
- 1.1 Definition
- 1.2 Advancement
- 1.3 Mains Supply
- 1.4 Generic Standard
- 1.5 Principle Of Operation
- 1.6 Classification
- 1.7 Roles Of Ups
- 2.0 Literature Review
- 2.1 Introduction
- 2.2 …
- 3.0 Construction
- 3.1 Construction Objective
- 3.2 Components Used
- 3.3 The Inverter Unit
- 3.3.1 Oscillator
- 3.3.2 Power Transistor (FET)
- 3.3.3 Power Transformer
- 3.4 The Charger Unit
- 3.5 The Battery Unit
- 3.5.1 Series Connection
- 3.5.2 Series-Parallel Connection
- 3.5.3 Parallel Connection
- 3.6 Connection Of The Major Blocks
- 3.7 Methodology
- 3.8 Ups Operation/ Connection
- 3.8.1 Connection Of All Blocks
- 3.9 Types Of Ups
- 3.9.1 The Standby/Offline Ups
- 3.9.2 Line Interactive Ups
- 3.9.3 The Online Ups
- 3.9.3.1 Double Conversion Online Ups
- 3.9.3.2 Delta Conversion Online Ups
- 3.10 Application And Uses
- 3.11 Advantages Of Ups System
- 4.0 Implementation And Testing
- 4.1 Bread Boarding
- 4.2 Proper Implementation
- 4.3 Coupling And Soldering
- 4.4 Packaging
- 4.5 Positioning
- 4.6 Testing Of Individual Components
- 4.7 Testing The Just Constructed Ups
- 4.8 Results
- 4.9 Maintaining The Ups
- 4.10 Components Specification
- 5.0 Conclusion And Recommendations
- 5.1 Conclusion
- 5.2 Warning For Ups
- 5.3 Recommendation
- 5.4 Glossary Of Terms
REFERENCES
Disclaimer for Complete Material Utilization
The displayed research work titled "Construction of a 2.5Kw Uninterruptible Power Supply (UPS) System" is stated as a research guideline towards accomplishing your assigned project / seminar research work. All the research materials on this website are ONLY for research purposes and should be used as a guideline in developing your research work. For no reason should you copy word for word as projectlist.com.ng will not be liable for any who copied the material. By ordering the complete research guideline, it signifies that you've accepted our terms of service.
PRELIMINARY PAGES
- Title page
- Approval page
- Dedication
- Acknowledgement
- Table of Contents
- Abstract
- 1.0 Introduction
- 1.1 Definition
- 1.2 Advancement
- 1.3 Mains Supply
- 1.4 Generic Standard
- 1.5 Principle Of Operation
- 1.6 Classification
- 1.7 Roles Of Ups
- 2.0 Literature Review
- 2.1 Introduction
- 2.2 …
- 3.0 Construction
- 3.1 Construction Objective
- 3.2 Components Used
- 3.3 The Inverter Unit
- 3.3.1 Oscillator
- 3.3.2 Power Transistor (FET)
- 3.3.3 Power Transformer
- 3.4 The Charger Unit
- 3.5 The Battery Unit
- 3.5.1 Series Connection
- 3.5.2 Series-Parallel Connection
- 3.5.3 Parallel Connection
- 3.6 Connection Of The Major Blocks
- 3.7 Methodology
- 3.8 Ups Operation/ Connection
- 3.8.1 Connection Of All Blocks
- 3.9 Types Of Ups
- 3.9.1 The Standby/Offline Ups
- 3.9.2 Line Interactive Ups
- 3.9.3 The Online Ups
- 3.9.3.1 Double Conversion Online Ups
- 3.9.3.2 Delta Conversion Online Ups
- 3.10 Application And Uses
- 3.11 Advantages Of Ups System
- 4.0 Implementation And Testing
- 4.1 Bread Boarding
- 4.2 Proper Implementation
- 4.3 Coupling And Soldering
- 4.4 Packaging
- 4.5 Positioning
- 4.6 Testing Of Individual Components
- 4.7 Testing The Just Constructed Ups
- 4.8 Results
- 4.9 Maintaining The Ups
- 4.10 Components Specification
- 5.0 Conclusion And Recommendations
- 5.1 Conclusion
- 5.2 Warning For Ups
- 5.3 Recommendation
- 5.4 Glossary Of Terms
REFERENCES
Disclaimer for Complete Material Utilization
The displayed research work titled "Construction of a 2.5Kw Uninterruptible Power Supply (UPS) System" is stated as a research guideline towards accomplishing your assigned project / seminar research work. All the research materials on this website are ONLY for research purposes and should be used as a guideline in developing your research work. For no reason should you copy word for word as projectlist.com.ng will not be liable for any who copied the material. By ordering the complete research guideline, it signifies that you've accepted our terms of service.
Frequently Asked Questions (FAQ)
Is the topic “The Effect of Class Size in Effective Teaching and Learning of Social Studies in Junior Secondary School” recommended for Social Studies Education Project?
Yes it is highly recommended — The study was carried out to investigate the Effect of Class Size in Effective Teaching and Learning of Social Studies in Junior Secondary School in Warri-South Local Government Area, Delta State. In achieving this aim, the following specific objectives were laid out to determine the class size of junior secondary school students, ascertain the effectiveness of teaching and learning of junior secondary school and identify the policy guiding teacher-student ratio in junior secondary school in the area under study. The research design used in this report is descriptive design, utilizing questionnaire method to obtain information from the respondents for this project. A total of 200 (two hundred) respondents were selected for this study to represent the entire population of the …
Is the topic “Information Literacy” recommended for Library and Information Science (LIS) Project?
Yes it is highly recommended — The study explores the Information Literacy in Ekiti State University. In achieving this aim, the following specific objectives were laid out to examine the influence of literacy skills on student education in academic library, find out if there is a significant relationship between information literacy skills and use of information resources by university students, determine students’ levels of library literacy skills after the teaching of library literacy instruction, identify the challenges confronting user education programmes, and assess the extent to which library user education programme has changed the Ekiti State University Students’ attitude towards library use. The research design used in this report is descriptive design, utilizing questionnaire method to obtain information from the respondents for this project. A total …
Can this topic “Motivation of Customers as Essential Tool in Financial Institution” be used for Banking and Finance (BF) Project?
Yes it can be utilized for research — This research work clearly brings out the motivational tools used by financial institution for attainment of financial goal. The topic “motivation of customer as essential tool in financial institution” is very essential to be used by institution. For it least for profit maximization. This motivation is applied to retain and gain more customers for institution like Banks. …
Can the material for “Effects of Vision and Mission Statement on Firms’ Survival” be used as a guide for Business Administration and Management (BAM) Project?
Yes it can be used — The mission statement is becoming an integral part of firms operating plans for both public and private firms within and outside Nigeria. This study was set to bring fore effect of vision and mission statement on firms’ survival. The study employed a descriptive survey and a research questionnaire was used for data collection; one hundred questionnaires was distributed to employees at Nestle PLC Sagamu. The data collected were thus analyzed using frequency count and t-test statistics. The findings of the study revealed that there is no significant difference in the perception of male and female workers on the effects of vision and mission statement and also there is no significant difference between the survival of firms that use vision and …
Can the material for “Facts and Fiction in Akachi Adimora - Ezeigbo’s Chldren of the Eagle and the Last of the Strong Ones” be used as a guide for English / Igbo Project?
Yes it can be used — This research work addressed itself to the way people tend to see fictional works. People see fictional works as being fictitious, but they are over laid with fact. This long essay, using Akachi Adimora. Ezeigbo’s works as guide, demonstrated the impact of the intermeddling of fact with fiction in literary works. They do not always obstruct each other and when harnessed depending on the ingenuity of the artist they can serve multiple purposes. The sociological socialist realism theory is used in this research work because real and factual events in Ezeigbo’s life are contained in her works. Ezeigbo make use of the Igbo setting. There are names proverbs, idioms and practices that epitomize the Igbo culture and Igbo world view. Her …
Can the material for “The Problem of Solid Waste Management in Nigerian Cities” be used as a guide for Public Health Project?
Yes it can be used — Solid waste comprises all the waste arising from the human and animal activities that area normally solid, discarded as useless or unwanted. It includes by production of process, lines or material that may be required by law to be disposed. The study scrutinized the Problem of Solid Waste Management in Nigeria using Abeokuta South L.G.A. in Ogun State as a case study. In achieving this aim, the following specific objectives were laid out to know the physical, chemical and biological effect of Solid Wastes on underground water and determine the amount of wastes within the study areas and identify factors that affects waste disposal and the type of solid waste disposal system that will aid economic development of the state. …
Is the topic “The Influence of Peer Group Pressure on Adolescent Smoking Behavior” recommended for Education Project?
Yes it is highly recommended — The study examines the Influence of Peer Group Pressure on Adolescent Smoking Behavior among Undergraduate Students in Tertiary Institutions in Ado-Ekiti Local Government area of Ekiti State. Influence of peer group pressure on adolescent smoking behavior has more than ever before being posing serious threat to adolescent health. As such, government, parents and the society have seen the need to find a lasting solution to curbing the menace of smoking among adolescents. The study has the following major objectives; to examine the effects of peer group pressure on adolescent smoking behavior; to analyze the negative effects of smoking on adolescent’s health; and to examine the counter-measures and their potency to smoking among adolescents. The study utilizes data from both primary …
Can this topic “The Role of Financial Institutions in the Development of the Nigeria Economy” be used for Accountancy / Accounting Project?
Yes it can be utilized for research — The Study investigated the role of financial institutions in the development of the Nigeria economy. The objective is to find out whether the role of financial institutions is improving the growth and development of Nigeria economy, to know what the government doing to maintain or encourage the financial institutions in the development of the Nigeria Economy. We tested two hypothesis using chi-square methods. In hypothesis one, we tested the relationship between financial institutions and economic development. After calculated it was discovered that chi-square calculated is greater than chi-square tabulated. So the null hypothesis was rejected and all the alternative is accepted which said that, there is a relationship between financial institution and economic development. In hypothesis two, we tested the …
Can the material for “The Lexico-Semantic Features of Nigerian English in Newspapers” be used as a guide for Linguistics and Communication Project?
Yes it can be used — The study focuses on the Lexico-Semantic features of Nigerian English in Daily Times, Punch and Vanguard Newspapers. This is an attempt to investigate the extent to which Nigerian columnists and editorials use the Lexico-semantic features of Nigerian English for their reportings. Anchored on theoretical premise of the contextual theory of meaning, the data for the study was arrived at through a random sampling technique which enabled the researcher to select at random Newspapers from the months of January to December in the year 2012 to 2016. The identified Lexico-Semantic features of Nigerian English which were found in these dailies were analyzed using the Lexico-Semantic variation of Nigerian English as identified by Adegbija (2004). It is evident from the findings that …
Can the material for “Impact of Training and Development on Employers Performance” be used as a guide for Business Administration and Management (BAM) Project?
Yes it can be used — This research project is prompted by the need for training and development in the Banking Industry which is often neglected by most organizations. This neglect has led to waste and unnecessary cost centers become necessary to embark on the study so as to highlight its importance in present day work force. As it were, any organization that wants to be dynamics has to move with time by developing and training its personnel, otherwise, it will be ready to be price out of market. The work further tried to deal with the historical perspective of Union Bank of Nigeria. It also tries to focus on theoretical frame work of the study. Moreso, it also focuses on the analysis of the research questions, hypothesis …