
AUTOMATED PRISON MANAGEMENT SYSTEM
CHAPTER ONE
Introduction
1.1 General Overview
Automated prison management system is the collection of register cases for each prisoner entering the prison for automated release diary generator. A good system for prison service should be automated, because it enhances the administrative and experience to design, develop and implement a prison management system for prison defense and security.
In spite of the benefits of the use of computer to provide timely and accurate information, which is absent in most of Nigeria prison, it is not all problem arises as to how computer can be utilize that is programmed to achieve desire result.
The introduction of computer has brought many changes to various fields, such as prison, health sector, hotel, bank and in business sector generally. Just because it helps to carry out complex and lengthy analytical operation very rapidly to effective communication system, it is also time saving, versatile, flexible storage of large information and reduce human labour.
The prison is a very large yard where prisoners, warders and other prisons staff reside. Researchers, prison staffs like any other human will always latest technology in the field so as to reduce stress encountered in their fields. In developed countries of the world, people are already fighting on how prisoners can gain access to the internet in their cell room or their common room. This electronic technology offers the competitive speed which is important for the prisoners.
Imprisonment as a form of punishing offenders was not too many pre- colonial communities in Africa. The day sentence is pass to a person, is the day he/ she becomes a prisoners even before getting to the fore walls of the prison yards. Immediately the sentence is passed, the prison officer becomes the middle men between the government and the prisoners. The prisoners on his/her own part will do any thing within his or her own limit to see that he does not spend a minutes beyond the sentenced given while government will not want to do away with prisoners until every bits of the jail terms or otherwise is completely secured.
The instrument used by the prison officer to see that both parties are satisfactorily treated this is the computation of sentence. Hence it is defined as the determination of the earliest day release (EDR) and latest day release (LDR) of the prisoners.
To this end, a micro computer based prison management system will be developing to practically alert the prison staff of the capability of a computer for effective services. In this project attention will be based on automated prison management system.
1.2 Statement Of The Problem
The manual method has over the year proven faculty.
This is due to several reasons:
- Inability to locate record: due to the fact that the records are so many, some of them are not located easily this happens especially when the order of arrangement.
- Bulky records: this is because the records are so many that they eventually take up a lot of unnecessary.
- Missing records: this is because the records are so many that they eventually take up a lot of unnecessary.
- Difficulties are encountered in granting requests to people who come for investigation or research and prison staff.
1.3 Aim And Objective.
The ultimate aim of the study is to automate the routine function of prison management system and overcome the problems associated with the present system.
The aim and objectives are to handle the following;
- To improve the existing manuals system by introducing a computerized system.
- To reduce human dependability and lapses.
- To design a system for easy information storage update and retrieval.
- Court report can be prepared easily.
- To bring into focus the important of computer in prison management.
- To improve the operational speed for faster calculation of sentences.
- To provide facility for good access to date store in the data base.
1.4 Project Methodology
This is the method, ruled or ways of collecting data of research. The project would be carried out by simulating a manual system with automated system. Electing all necessary information was done by interviewing some staffs. The aim of the survey (interview and inquiries) is to establish the existing utilization of computer by operators (prison management) if any, also to identify areas that do not already have computer and identify the barriers to owing and using computers. One of the staff that assisted in giving relevant information was A.C.P (assistance controller of prison)
1.5 Scope Of The Project
The system scope of the prison is to attend to the welfare of prisoners and updating of information and enhance-the criminal investigation research e.tc the general information system will help to ensure that up €“to-dated individual information of every prisoner is being maintained such as the cell number and other personal information relating to his date of release, how to locate such inmate and make him/ her available.
1.6 Limitation Of The Project
This research is based on prison management, but the system to design will be limited to the prisoners record keeping i.e. how the prison record can be stored, edited, updated and the security of the records.
The features of the new system are as follows.
- It has segment that handles prisoners family information.
- It stored prisoners profile.
- It entails inmate court information.
- It stores prisoners information.
- It stores prisoners criminal records
CHAPTER TWO
2.0 Literature Review
2.1 Introduction
The review of relevant literature is the main topic of this chapter. A literature review covers theoretical and methodological contributions to a certain issue in addition to the state of knowledge at the time of writing. It provides information about the state of the art in relation to the subject you are writing about. It examines the body of work on the chosen subject. The literature evaluation in this study comprises the …
Procedure for Downloading the PDF (Docx) Material
Automated Prison Management System can be downloaded by requesting the full set of materials at the project or seminar cost. The document will be sent via Microsoft Word (MS-Word) format via WhatsApp (e-mail) following payment confirmation.
Seminar Material Cost ₦3,000 | Project Material Cost ₦5,000 |
Request Complete Material
![]() | Click here to request the Complete Material via WhatsApp including;
|
TABLE OF CONTENTSPRELIMINARY PAGES
- Title page
- Approval page
- Dedication
- Acknowledgement
- Table of Contents
- Abstract
INTRODUCTION
- ⋮
LITERATURE REVIEW
- 2.1 Introduction
- ⋮
CHAPTER THREE
SYSTEM ANALYSIS AND DESIGN
- 3.1 Methodology Adopted
- 3.1.1 Problem Identification Using SSADM
- 3.2 Analysis of the Existing System
- 3.2.1 Dataflow of the Existing System
- 3.2.2 Disadvantages Of The Existing System
- 3.2.3 Weakness of the existing System
- 3.3 Feasibility Study
- 3.3.1 Economic Feasibility
- 3.3.2 Technical Feasibility
- 3.3.3 Operational Feasibility
- 3.4 Analysis of the Proposed System
- 3.4.1 Data Flow Diagram of the Proposed System
- 3.4.2 Advantages of the Proposed System
- 3.4.3 Justification of the Proposed System
- 3.5 Functional Requirements
- 3.5.1 Use Case Diagram Of The Admin / User Privileges
- 3.6 Data Requirements
- 3.7 High Level Model of the Proposed System
CHAPTER FOUR
SYSTEM DESIGN AND IMPLEMENTATION
- 4.1 Objectives of the Design
- 4.2 Cohesion and Decomposition High level Model
- 4.3 Control Center / Overall Dataflow Diagram
- 4.3.1 Proposed System Operation Flowchart
- 4.4 System Specification and Design
- 4.4.1 Input and Output Specification
- 4.4.2 Database Specification and Design
- 4.4.3 Data Dictionary
- 4.5 Choice and Justification of Programming Language
- 4.6 Program Documentation
- 4.7 Implementation Techniques
- 4.7.1 System Testing
- 4.8 Programming Module Specification
- 4.8.1 Installation
- 4.9 Computer Hardware Minimum Requirement
- 4.10 Software Requirement
- 4.11 Personnel / User Training
- 4.12 File Maintenance Module
CHAPTER FIVE
SUMMARY, CONCLUSION AND RECOMMENDATION
- 5.1 Introduction
- 5.2 Summary
- 5.3 Conclusion
- 5.4 Recommendation
REFERENCES
APPENDIX A - “SOURCE CODE”
APPENDIX B - “OBJECT PROGRAM”
Disclaimer for Complete Material Utilization
The displayed research work titled "Automated Prison Management System" is stated as a research guideline towards accomplishing your assigned project / seminar research work. All the research materials on this website are ONLY for research purposes and should be used as a guideline in developing your research work. For no reason should you copy word for word as projectlist.com.ng will not be liable for any who copied the material. By ordering the complete research guideline, it signifies that you've accepted our terms of service.
PRELIMINARY PAGES
- Title page
- Approval page
- Dedication
- Acknowledgement
- Table of Contents
- Abstract
INTRODUCTION
- ⋮
LITERATURE REVIEW
- 2.1 Introduction
- ⋮
CHAPTER THREE
SYSTEM ANALYSIS AND DESIGN
- 3.1 Methodology Adopted
- 3.1.1 Problem Identification Using SSADM
- 3.2 Analysis of the Existing System
- 3.2.1 Dataflow of the Existing System
- 3.2.2 Disadvantages Of The Existing System
- 3.2.3 Weakness of the existing System
- 3.3 Feasibility Study
- 3.3.1 Economic Feasibility
- 3.3.2 Technical Feasibility
- 3.3.3 Operational Feasibility
- 3.4 Analysis of the Proposed System
- 3.4.1 Data Flow Diagram of the Proposed System
- 3.4.2 Advantages of the Proposed System
- 3.4.3 Justification of the Proposed System
- 3.5 Functional Requirements
- 3.5.1 Use Case Diagram Of The Admin / User Privileges
- 3.6 Data Requirements
- 3.7 High Level Model of the Proposed System
CHAPTER FOUR
SYSTEM DESIGN AND IMPLEMENTATION
- 4.1 Objectives of the Design
- 4.2 Cohesion and Decomposition High level Model
- 4.3 Control Center / Overall Dataflow Diagram
- 4.3.1 Proposed System Operation Flowchart
- 4.4 System Specification and Design
- 4.4.1 Input and Output Specification
- 4.4.2 Database Specification and Design
- 4.4.3 Data Dictionary
- 4.5 Choice and Justification of Programming Language
- 4.6 Program Documentation
- 4.7 Implementation Techniques
- 4.7.1 System Testing
- 4.8 Programming Module Specification
- 4.8.1 Installation
- 4.9 Computer Hardware Minimum Requirement
- 4.10 Software Requirement
- 4.11 Personnel / User Training
- 4.12 File Maintenance Module
CHAPTER FIVE
SUMMARY, CONCLUSION AND RECOMMENDATION
- 5.1 Introduction
- 5.2 Summary
- 5.3 Conclusion
- 5.4 Recommendation
REFERENCES
APPENDIX A - “SOURCE CODE”
APPENDIX B - “OBJECT PROGRAM”
Disclaimer for Complete Material Utilization
The displayed research work titled "Automated Prison Management System" is stated as a research guideline towards accomplishing your assigned project / seminar research work. All the research materials on this website are ONLY for research purposes and should be used as a guideline in developing your research work. For no reason should you copy word for word as projectlist.com.ng will not be liable for any who copied the material. By ordering the complete research guideline, it signifies that you've accepted our terms of service.
Frequently Asked Questions (FAQ)
Can the material for “Small Scale Industry in Nigeria; the Financing Question” be used as a guide for Economics Project?
Yes it can be used — A critical review of the most recent literatures on labour turnover and productivity was done. It was revealed that there is a significant relationship between labour turnover rates and labour performance. And that labour turnover affects company productivity level. But, welfare services in another way affect labour turnover rate. Also, the finding shows that productivity measurement has significant relationship with the company performance and growth. But despite the inherent disadvantages associated with labour turnover, it is also been use to maintain profitability during slimmer period. This study examines its implication on Nigeria organizations, using Evans medical plc as a case − study. Four hypotheses were formulated to test the relationship between labour turnover and productivity, performance and welfare service, and how measurement …
Can the material for “The Impact of Shared Responsibility on Workers Productivity in Government Owned Institutions in Nigeria” be used as a guide for Human Resource Management (HRM) Project?
Yes it can be used — Effective shared responsibility has a positive influence on the performance of organizations. Organizations worldwide are striving to improve the effectiveness of their teams in order to be globally competitive. The study was carried out in selected public corporationss in Enugu metropolis, Enugu State. The purpose and objective of this study therefore was to establish the impact of shared responsibility on workers productivity in Kenya. The study was to evaluate the impact of organizational culture on formation of teams on employees, examine the various job descriptions of employees on achievement of organizational goals, to examine the impact of job satisfaction on job performance and to establish the impact of skills and qualification on performance of employees. The study was conducted in …
Can the material for “Employees Performance Appraisal as a Strategy to Management” be used as a guide for Business Administration and Management (BAM) Project?
Yes it can be used — This research work discussed the management function, which is used in achieving desired results through efficiency utilization of human and material resources. It is intended to be problem solved and revealing the management and subordinates as well. I have organized this work in chapters to enable full discussion in each area selected. This first chapter deals with the introduction general background to the subject matter, problem associated with the subject matter, problems that the study will be concerned with, the importance of studying the area, definitions of important terms and references. This chapter reveals the reasons of the research work to enable the reader to know the area of coverage. The second chapter is concerned with the literature review, the origin of the …
Can the material for “Development of Cloud-Based Information Dissemination Mechanism for Early Plant Diseases Detection and Control” be used as a guide for Computer Science (CS) Project?
Yes it can be used — Plant Disease Cloud-Based Information Dissemination system incorporate a number of different styles of data delivery mechanism for Early Plant Diseases Detection and Control. The aim of the study is to develop a Cloud-Based Information Dissemination Mechanism for Early Plant Diseases Detection and Control. In achieving this aim, the following specific objectives were laid out to develop a software that will: disseminate information for Early Plant Diseases Detection and proffer Control solution, on-demand utility to users of the cloud service at a quick response time, and detect and notify users about the early plant diseases through the cloud-based information dissemination mechanism. The methodology adopted in this study is the structured system analysis and design methodology (SSADM) which is a technical approach …
Can the material for “Web Based Student Attendance Monitoring System” be used as a guide for Computer Science (CS) Project?
Yes it can be used — Web Based Student Attendance Monitoring System is a software developed for daily student attendance in schools and institutions. The ability to compute the attendance percentage becomes a major task as manual computation produces errors, and also wastes a lot of time. The aim of the study is to design and implement a Web Based Student Attendance Monitoring System. In achieving this aim, the following specific objectives were laid out to develop a fingerprint students’ attendance capturing system and compare it with manual system and carry out the analysis of manual processes involved in class attendance and examination attendance. The motivation that led to the implementation of the proposed system is that the traditional system is still mostly used in lecture room …
Can the material for “The Roles and Impact of Accounting Information to Non-Profit Making Organization” be used as a guide for Accountancy / Accounting Project?
Yes it can be used — Non-profit making organization on the other hand has immensely benefited from accounting information to survive, integrate and stabilize in this current economic recession in the country. The applications of Accounting Information have contributed to the growth and development of every business entity. The study was carried out to examine the Roles and Impact of Accounting Information to Non-Profit Making Organization using Redeemed Christian Church of God (RCCG) as a case study. In achieving this aim, the following objectives were set out as follows to find out: he impacts of accounting to non-profit making organization, importance of accounting information to the church, and problem associated with unqualified hand handling accounting information. Investigation reveals the problems of the Roles and Impact of …
Can the material for “Development of Document Routing System Online Application and Approval of Loan” be used as a guide for Computer Science (CS) Project?
Yes it can be used — An online loan website would allow AccionMFB to access online application, website, application information from any convenient location, using a single user ID and password. They would be able to do transactions online. The central goal of this initiative is to transform the day-to-day operations of the Bank by reducing paperwork; putting information services and transaction online; streamlining access to information, applicants results and content. Making it easy for applicant's to find and use online services, and thus increasing the likelihood that the Bank can attain the strategic goals laid out in this initiative. I used a combination of surveys, focus groups, and one-on-one interviews to gather information from AccionMFB, staff, and from key personnel at other institutions that have …
Can the material for “The Role of Leadership Styles in Driving Military Innovation” be used as a guide for Political Science Project?
Yes it can be used — The Army Military is an institution, since its purpose, objectives, organization, actions, behavior and the roles of its members; the allocated resources are specifically determined and regulated by normative prescriptions. The study scrutinized the Role of Leadership Styles in Driving Military Innovation. In achieving this aim, the following specific objectives were laid out to examine the relationship between the leadership styles of Military officers functioning in Driving Military Innovation and examine the leadership styles required to optimize an organizational climate of military innovation. The research design used in this report is descriptive design, utilizing questionnaire method to obtain information from the respondents for this project. A total of 80 (eighty) respondents were selected for this study to represent the entire …
Can the material for “Development of an Automated Result Computation System” be used as a guide for Computer Science (CS) Project?
Yes it can be used — Result computing are vital recurrent procedures and processes in every university system that is inevitable. The aim of the study is to design and implement an Automated Result Computation System. In achieving this aim, the following specific objectives were laid out as follows to develop an application software that will provide a reliable solution to result processing that is corruption free and maintain a reliable database for storage of students’ records and update as the need arises. The motivation that led to the implementation of the proposed system is that the effort expended in the process of registration of students and computation of their examination results is tedious. Also, it is quite worrisome that these processes are carried out every …
Can the material for “The Impact of Frauds in the Nigeria Banking Industry” be used as a guide for Banking and Finance (BF) Project?
Yes it can be used — Fraud is an awful phenomenon, which like a view has invaded Nigeria banking industries and the society in general, and puts any organisation that is comes into in a distress point of in a state of liquidation. This study highlights the nature and various types of fraud, causes of bank fraud extent of fraud in banks, effect of bank fraud, detection and control measure adopted by management to check fraud incidents. The purpose of this research work is to find out whether there is significance level of fraud in Nigeria banks to know whether Nigeria practice, aid or abate fraud and to consider the adequacy of the internal control system in detecting and preventing fraud in the bank. The method of data collection …