Quantity surveying is concerned with controlling and managing construction projects. This study to investigated the practice of risk management amongst the construction practitioners specifically the quantity surveyor in the Nigerian construction industry, evaluated the quantity surveyor's level of awareness and acceptance on Risk Management practice, identified the current practice of risk management amongst Quantity Surveyors’ and examined the barriers and challenges to the implementation of risk management in construction project from the quantity surveyor's point of view.

Simple random sampling with proportionate representation was used to select 50 quantity surveyors in Owerri, Imo state. Structured questionnaire was used for data collection and this was supplemented with interview of key informants. Percentage was the main statistical procedure employed in data analysis. Results showed Awareness and acceptance of risk management practices aid quantity surveyors in attaining construction project objectives.

In conclusion, most of the respondents agree that awareness and implementation of risk assessment and management practice in project construction has aided quantity surveyors in attaining construction project objectives. It was recommended that there should be in increase in the level of awareness and implementation of adequate risk management technique amongst quantity surveyors in Nigeria.


CHAPTER ONE

1.1 Background of the Study

Quantity surveying is concerned with controlling and managing construction projects. The Nigerian construction industry is faced with uncertainties. With construction targets not being met and high rate of abandoned construction projects, there is great need for proper risk assessment and implementation. Managing risks in construction projects have been recognized as a very important process in order to achieve project objectives in terms of time, cost, quality, safety and environmental sustainability (Mills, 2001). Project risk management is an iterative process: the process is beneficial when is implemented in a systematic manner throughout the lifecycle of a construction project, from the planning stage to completion.

Risk management has become an integral process in managing construction projects. Construction project activities are to be well calculated in-order for the deliverable to be of great use and benefit to its stakeholders. To complete most construction projects on time, minimizing cost and wastages proper risk management techniques must be employed (Tchankova, 2002). According to Mills (2001), systematic risk management is expecting the unexpected or in other words it is a tool which helps control risks in construction projects and its objective is to introduce a simple, practical method of identifying, assessing, monitoring and managing risk in an informed and structured way.

Normally, in risk management process, the first steps will involves risk identification process which includes the prioritization process in order to identify and rank the risk based on its impact and seriousness. Risk that will have a greater impact on a project normally will be handled first and low impact risk will be handled later.

Construction project team consist of professional such as the architect, engineer, and the quantity surveyor that will help to assist and advice the client in order to meet all the project objectives in term of time, quality and cost. Awareness and knowledge on risk management is very crucial so that they will deal with the risk properly which will directly leads to project success.

Due to this scenario, this research aims to identify the level of awareness of construction professional specifically Nigerian quantity surveyors towards risk management. Apart from that, it will also aim to identify how risk management being implemented in the Nigerian construction industry and also the potential barrier and challengers in the implementation of risk management specifically from the quantity surveyor's point of view.


1.2 Statement of the Problem

Embarking on a construction project involves taking risks, as the Nigerian construction industry is not risk-free. No matter how small or simple is the project it is still can go wrong as soon as the two parties, the employer and the contractor signed a contract they have taken onboard the risk (Sawczuk, 1996). The individual in the construction industries that undertake various activities are heterogeneous since client; consultant and contractors have different roles and objectives (flanagan, 1995). Risk management in Nigerian construction industry is actually not widely being practiced.

According to Burchett (2009), Risk in construction, however cannot be eliminated, but it can be minimized, transferred or retained. However, the industry has a very poor reputation for managing risk, with many projects failing to meet deadlines and costargents (Mills, 2001). In practice, normally in order to deal with the unexpected event, there will be an allocation about 10 percent from the estimated cost of the proposed construction project as a contingency sum.

Earlier observation shows that the risk management process is not widely being implemented in Nigerian construction industry. For this reason, this research seeks to identify the barriers and challenges for the implementation of risk management in the Nigerian construction industry.


1.3 Objectives of the Study

The aim of this research is to investigate the practice of risk management amongst the construction practitioners specifically the quantity surveyor in the Nigerian construction industry.

In order to achieve the aim of the study, specific objectives for the study are:

  1. To evaluate the quantity surveyor's level of awareness and acceptance onRisk Management practice.
  2. To identify the current practice of risk management amongst Quantity Surveyors’.
  3. To examine the barriers and challenges to the implementation of risk management in construction project from the quantity surveyor's point of view.

1.4 Research Questions

  • What is the quantity surveyor's level of awareness and acceptance on Risk Management practice?
  • What is the current practice of risk management amongst Quantity Surveyors’?
  • What barriers and challenges face the implementation of risk management in construction project from the quantity surveyor's point of view?

1.5 Research Hypothesis

  • Ho: Awareness and acceptance of risk management practices do not aid quantity surveyors in attaining construction project objectives
  • Hi: Awareness and acceptance of risk management practices aid quantity surveyors in attaining construction project objectives

1.6 Significance of the Study

Findings of this study will aid Nigerian quantity surveyors in appreciating the importance of adopting proper risk management techniques in their daily jobs. Since risk management is not widely being adopted in Nigerian construction industry, this research will help to promote the practice of risk management among the industry's players.

In addition to this, being an inter-discipline type of research, both the consultants and contractors and also the industry as a whole may benefit from the outcome of the research and have better understanding on risk management.


1.7 Scope and Limitations of the Study

This research study will focus on risk management practices adopted by quantity surveyors in Uyo Local Government area of Akwa Ibom State, Nigeria. All findings and recommendations from the study are limited to findings and recommendations based on the chosen sample size.

In carrying out this study, the researcher was faced with time and finance constraints, as lectures did not give room for more time to extend the research time frame. Finance on the other hand made printing, transportation to cover a wider area difficult.


1.8 Definition of Terms

RISK - This is the potential of losing something of value, weighed against the potential to gain something of value.

RISK PERCEPTION - Risk perception is the subjective judgment people make about the severity of a risk, and may vary person to person

PRACTICE - is the act of rehearsing a behavior over and over, or engaging in an activity again and again, for the purpose of improving or mastering it, as in the phrase "practice makes perfect

QUANTITY SURVEYOR - a Quantity Surveyor (QS) is a professional working within the construction industry concerned with construction costs and contracts.

CONSTRUCTION - In the fields of architecture and civil engineering, construction is a process that consists of the building or assembling of infrastructure. Far from being a single activity, large scale construction is a feat of human multitasking. Normally, the job is managed by a project manager, and supervised by a construction manager, design engineer, construction engineer or project architect.

RISK MANAGEMNENT - is the identification, assessment, and prioritization of risks followed by coordinated and economical application of resources to minimize, monitor, and control the probability and/or impact of unfortunate events or to maximize the realization of opportunities.


CHAPTER TWO

2.0 Literature Review

2.1 Introduction

The review of relevant literature is the main topic of this chapter. A literature review covers theoretical and methodological contributions to a certain issue in addition to the state of knowledge at the time of writing. It provides information about the state of the art in relation to the subject you are writing about. It examines the body of work on the chosen subject. The literature evaluation in this study comprises the …


Procedure for Downloading the PDF (Docx) Material


An investigation into risk management practices amongst quantity surveyors in the Nigerian construction industry can be downloaded by requesting the full set of materials at the project or seminar cost. The document will be sent via Microsoft Word (MS-Word) format via WhatsApp (e-mail) following payment confirmation.


Seminar Material Cost
₦3,000
Project Material Cost
₦5,000


Request Complete Material

Complete Material Chapters of An investigation into risk management practices amongst quantity surveyors in the Nigerian construction industryClick here to request the Complete Material via WhatsApp including;
  • Preliminary Pages,
  • Chapter 1-5,
  • References and Appendix.



TABLE OF CONTENTS

PRELIMINARY PAGES


CHAPTER ONE — INTRODUCTION

  • 1.1 Background of the Study
  • 1.2 Statement of General Problem
  • 1.3 Objective of the Study
  • 1.4 Research Questions
  • 1.5 Hypothesis
  • 1.6 Significance of the Study
  • 1.7 Scope of the Study
  • 1.8 Definition of Terms

CHAPTER TWO — REVIEW OF RELATED LITERATURE

  • 2.1 Introduction
  • 2.1 Risk and Risk Management
  • 2.2 Theoretical Framework
  • 2.3 The Role of the Quantity Surveyor in Project Management
  • 2.4 The Risk Management
  • 2.5 The Risk Management Process

CHAPTER THREE — RESEARCH METHODOLOGY

  • 3.1 Introduction
  • 3.2 Research Design
  • 3.3 Area of the Study
  • 3.4 Population of Study
  • 3.5 Sample size and Sampling Techniques
  • 3.6 Instrument for Data Collection
  • 3.7 Validity of the Instrument
  • 3.8 Reliability of the Instrument
  • 3.9 Method of Data Collection
  • 3.10 Method of Data Analysis

CHAPTER FOUR — DATA PRESENTATION AND ANALYSIS

  • 4.0 Introduction
  • 4.1 Data Presentation and Analysis
  • 4.2 Characteristics of the Respondents
  • 4.3 Data Analysis
  • 4.4 Testing Hypothesis
  • 4.5 Summary of Findings
  • 4.6 Discussion of Findings

CHAPTER FIVE — SUMMARY, CONCLUSION AND RECOMMENDATION

  • 5.1 Summary
  • 5.2 Conclusion
  • 5.3 Recommendations

REFERENCES

APPENDIX


Disclaimer for Complete Material Utilization

The displayed research work titled "An investigation into risk management practices amongst quantity surveyors in the Nigerian construction industry" is stated as a research guideline towards accomplishing your assigned project / seminar research work. All the research materials on this website are ONLY for research purposes and should be used as a guideline in developing your research work. For no reason should you copy word for word as projectlist.com.ng will not be liable for any who copied the material. By ordering the complete research guideline, it signifies that you've accepted our terms of service.


Frequently Asked Questions (FAQ)


Is the topic “Challenges in Processing and Storage of Garri” recommended for Food Science and Technology (FT) Project?

Yes it is highly recommended — The study scrutinizes the Challenges in Processing and Storage of Garri. In achieving this aim, the following specific objectives were laid out to investigate the factors affecting Processing and Storage of Garri, find out the changes that caused friction between the cassava mash and the conveyor and determine the extent to which temperature can affect the production of final garri, and under what temperature the product can be stored and the maximum drying time, rate of feed temperature control. Garri today is a staple food in Nigeria and beyond for us to ascertain proper hygiene quality of the product there is the need to focus on the processes involved. Garri is the most populous carbohydrate meal eaten by approximately 148 …


Can the material for “The Impact of Feasibility Studies in Starting Up a New Business” be used as a guide for Business Education Project?

Yes it can be used — The study was carried out to examine the Impact of Feasibility Studies in Starting Up a New Business. Investigation revealed that the rate at which business fails in Rivers State is becoming very alarming. This is mostly as it concerns small scale businesses. Businesses are prevented from realizing their full potential by organizations' incapacity to evaluate every facet and anticipate probable future changes. One of the biggest obstacles preventing businesses from reaching their goals is the dynamic nature of the business environment. The research design used in this report is descriptive design, utilizing questionnaire method to obtain information from the respondents for this project. A total of 200 (two hundred) respondents were selected for this study to represent the entire …


Can the material for “Development of an Expert System for the Diagnosis of Liver Diseases and Ailment” be used as a guide for Computer Science (CS) Project?

Yes it can be used — Liver diseases contain hepatitis B virus and hepatitis C virus infections, alcoholic liver disease, nonalcoholic fatty liver disease and associated cirrhosis, liver failure and hepato-cellular carcinoma are primary causes of death. The aim of this study is to develop of Expert System for the Diagnosis of Liver Diseases and Ailment. In achieving this aim, the new system will accomplish the following objectives through the design of a system that will; reduce the risks associated with self-medication, wrong and delayed Liver Diseases and Ailment diagnosis, reduce the stress and inconveniences experienced by potential patients and not meeting with the doctor on the days of visit and help return the skills of an expert medical doctor in event of eventualities. The methodology …


Is the topic “Design and Construction of Fire Alarm System in a Three Storied Building” recommended for Electrical / Electronics Engineering (EE) Project?

Yes it is highly recommended — Fire alarm is an electronics device that is stored in a building to detect the presence of fire accident. An automatic fire alarm system is designed to detect the unwanted presence of fire by monitoring environmental changes associated with combustion. The study was conducted to design and construct a Fire Alarm System in a Three Storied Building. In achieving this aim, the following specific objectives were laid out to build a circuit that detects the fire and activates the Siren Sound or Buzzer and construct a device that will detect the unwanted presence of fire by monitoring environmental changes associated with combustion. In general, a fire alarm system is classified as either automatically actuated, manually actuated, or both. Automatic fire …


Can the material for “Strategic Management Accounting and Profitability of Firms” be used as a guide for Accounting and Finance Project?

Yes it can be used — Strategic management accounting (SMA) is central to the accomplishment of organizational objectives. Without the implementation of SMA, it would be quite difficult for a firm to survive, given the competitive nature of business environment in Nigeria. The study examined the impact of SMA on profitability of firms in the Nigerian brewery industry. The study prioritized on three SMA techniques namely corporate planning, capital investment analysis and cost-volume profit analysis. The study employed the descriptive survey design. Structured questionnaire was administered to 144 randomly selected staff of six brewery firms in Nigeria. The data collected were analyzed by the use of descriptive statistics and multiple regression analysis. Findings of the study revealed that corporate planning, capital investment analysis and cost-volume profit …


Can the material for “Factors Affecting Small Scale Business Enterprises in Kaduna Metropolis” be used as a guide for Business Administration and Management (BAM) Project?

Yes it can be used — This project investigated the Factors Affecting Small Scale Business Enterprises in Kaduna Metropolis. Textbooks and journals were reviewed in order to establish theoretical base for the study. Five research questions were postulated to guide the study. Out of which questionnaire items were developed. A sample size of 100 was adopted from the four small scale business enterprises in Kaduna metropolis. These questionnaires were administered and analyzed using the frequency distribution and mean score. The study revealed among other things that government does not really support the small scale business enterprises to grow as it was expected and most business enterprise find it difficult to obtain capital either from the government or the banks. The study has drawn conclusion that what …


Can the material for “The Need for Planning in an Organization” be used as a guide for Public Administration (PA) Project?

Yes it can be used — This project work is found out of principal factors responsible for the ineffectiveness of planning system in government organization. The objective of the study is to analyze the entire planning system of the organization under study, highlight areas of ineffectiveness in the organization for corrective measures and procedures. To determine whether the system provide effective reporting requirements to management for use in planning, controlling and future operation. To ascertain whether the planning system of mining organization comply with planning standards are under laid down regulations or not. The research work sill enable all department within the organization to acquaint themselves with the organization and other third parties to have knowledge on the system of keeping and maintain record of planning …


Is the topic “Effect of Bank Failure on Nigeria Economic Development” recommended for Banking and Finance (BF) Project?

Yes it is highly recommended — Effect of bank failure and economic development in Nigerian Banks occupy the most strategic point in the financial system of the economy for a total of bank to fait between 1992 to 2002 a space of four years, means that something definitely is wrong. This study is not antagonistic of any other rather it is complementary. Others works have to been used here and duty acknowledge but everything is with an intent to find a lasting solution to the issue of bank failure. The study will be base upon data collected through information sifted from books journals annuals, periodicals. All the relevant data obtain during the collection is going to be analyze generally ad used to deduce the findings. In the process of this …


Can this topic “Influence of Office Environment on the Job Performance of Office Workers” be used for Office Technology and Management (OTM) Project?

Yes it can be utilized for research — Office environment is an important component of work life for employees as employees spend significant part of their time at work, and it affects them in one way or the other. The aim of the study is to scrutinize the Effect of Working Environment on the Performance of Secretary in the Organization. In achieving this aim, the following specific objectives were laid out as follows to find out the: effect of office environment on the job performance of the office workers, effect of inadequate office furniture and fittings, modern machine on the job performance of workers, effect of good lighting, ventilation on the job performance of workers and impact of salary structure on the job performance of workers. The research …


Can the material for “Leadership and Corruption in Nigeria Local Government” be used as a guide for Public Administration (PA) Project?

Yes it can be used — The study was carried out to examine the Leadership and Corruption in Nigeria Local Government using Orji River Local Government as a case study. In achieving this aim, the following specific objectives were laid out to identify the areas of corruption and fine out the effect of corruption on the leadership of the local government council in Oji-River Local Government Council. The issue of corruption has remained ever present and continue to grow deep into the vitals of the Nigerian society, most especially as corruption has been ingrained into the fabrics of the Nigerian society cannot be solved overnight because the leaders as well as the followers are corrupt. In light of the above and in recognition of the damage …



Chat with us on WhatsApp