The Effects of Delays and Disruption on the Cost of Building Construction Projects in Nigeria (A Case Study of Enugu State)

THE EFFECTS OF DELAYS AND DISRUPTION ON THE COST OF BUILDING CONSTRUCTION PROJECTS IN NIGERIA


ABSTRACT

Construction projects refer to the projects undertaken by the construction industry to provide the much needed infrastructures for national development. The study was carried out to investigate The Effects of Delays and Disruption on the Cost of Building Construction Projects in Nigeria using Enugu State as a case study. In achieving this aim, the following specific objectives were laid out to determine the effects of delay and disruption on the cost of building construction project in Nigeria, ascertaining the cost, which aim at x-raying unnecessary delay and disruption in the normal processes of procuring and prosecuting building and civil engineering construction work at both pre-contract and post contract stages of construction. Delays and disruptions are among the challenges faced in the course of executing construction projects. Delays as well as disruptions are sources of potential risks that current studies are looking into ways to manage. Delays and disruptions have had effects to construction projects. The factors that usually call for these delay and disruption in construction projects of the numerous project on the construction landscape and on the parties that are involved in carrying out the projects. This study continued with elucidating what the Quantity Surveyor and the other parties involved in the construction process can do to eliminate delays and disruption in construction in Nigeria. This study will be beneficial to the most construction industry in Nigeria because once a project is initiated and manage properly it will eliminate high cost of procurement and a lot profit are involved. Based on the findings, it is recommended that adequate construction budget, timely issuing of information, finalization of design and project management skills should be the main focus of the parties in project procurement process.


CHAPTER ONE

1.1 Introduction

Delay as referred in construction is prolonged construction period and disruptions are events that disturb the construction programme. Delays and disruptions are among the challenges faced in the course of executing construction projects. Delays as well as disruptions are sources of potential risks that current studies are looking into ways to manage. Delays and disruptions have had effects to construction projects. The Construction industry can be described as a collection of loosely integrated firms involved in the provision of the materials for the construction of structures, designing facilities to be constructed, constructing the facilities, installation of specialized services in the constructed structures, and supervision of the constructions in the areas of building and civil engineering works.

As a prelude to other parts of this study, this chapter will discuss the background upon which this study was initiated, the statement of problems that led to this study, the Aim and Objectives of the study. Others are Significance of the study, Scope of work, Research hypothesis and questions, Limitations of the Study and Definition of technical terms.


1.2 Background of Study

Construction projects refer to the projects undertaken by the construction industry to provide the much needed infrastructures for national development. Cost overrun is a term used to express situations when actual cost of a project exceeds the budgeted cost. Time overrun is a situation when the actual completion date outpaced the scheduled completion date. The budgeted cost and scheduled completion date most often are not positively achieved by the contractor. More time and money are usually required to complete the construction of a project. Cost-and time-overruns in construction projects negatively impacts on the important role the construction industry plays in any given economy, especially developing economies such as Nigeria’s.

Delays and disruptive in construction has some effects on its cost and very retrogressive in a developing economy like Nigeria and needs to be properly addressed and tackled with all the courage and effort that we can muster.

Most town and cities in Nigeria are dotted with projects that are being delayed, disrupted, and uncompleted. Explanations giving for the stages of each buildings project is varied and sometimes attributed to lack of financial, human and material resources with which to execute the projects. It is common in Nigeria especially now that the country is suffering from depression in the economy. It is often bad to see huge capital investments being disrupted and abandoned. Any attempt to delay and disrupt a construction project; will have terrible consequences on every aspect of the nation's activities which will be severe and unwelcome.

Therefore, in Enugu State where the research was carried out, the activities that was conducted is to know the Effects of Delays and Disruption on the Cost of Building Construction Projects in Nigeria.


1.3 Statement of Problems

Investigation revealed that one of the biggest problems associated with most of the construction projects in Nigeria today is problem of delays and disruptions at both the pre-contract and post-contract stages of construction in building and civil engineering works. The cost of building increases at the cause of delays and disruption in construction because of variation. Many construction project in Enugu needed huge capital outlay and time to execute them and any attempt to delaying and disrupting the construction proper will result to terrible consequences that will affect the economical control and building cost.

The demand for more construction of all types, coupled with a tight monetary supply has provided the construction industry with a big challenge to cut costs. The problem of high contract costs of all aspects of construction is becoming obvious. Consequently, substantial increases are being observed in projects. This substantial increase has brought about loss of client confidence in consultants, added investment risks, inability to deliver value to clients, and disinvestment in the construction industry.


1.4 Aim and Objectives of Study

The aim of the study is to investigate the Effects of Delays and Disruption on the Cost of Building Construction Projects in Nigeria using Enugu State as a case study. In achieving this aim, the following specific objectives were laid out as follows:

  1. To ascertain the effects of delays and disruptions on cost of building construction.
  2. To investigate into most delayed and disrupted construction projects.
  3. To examine the effect of fluctuation in prices on construction projects costs.
  4. To examine the effects of variation in design on construction project costs.
  5. To examine the costs of delayed and disrupted construction project to clients, contractors, the professionals that are engaged and the nation, in particular Enugu state.

1.5 Research Questions

The study came up with research questions so as to be able to ascertain the above stated objectives. The specific research questions for the study are stated below as follows:

  • Do fluctuations in prices bring about changes in construction project cost?
  • In what ways can variations in design affect construction cost?
  • What are the causes of delays and disruptions in construction projects?
  • What are the effects of delays and disruptions on building construction project cost?
  • What the costs are of delayed and disrupted construction projects to the clients, contractors, the professionals that are engaged in the field?

1.6 Research Hypothesis

In order to pursue the objective of this study, the following generalized statements have been designed to guide and aids in obtaining the result for the experiment to be conducted. For this work, the null hypothesis will be represented with H0 while the alternative hypothesis will be represented with hypothesis H1.

Hypothesis One

  • H0: Delays and disruptions have no significant effect on building construction projects.
  • H0: Delays and disruptions have significant effect on building construction projects.

Hypothesis Two

  • H0: There is no significant factor instigating the delays and disruptions on cost of building construction in Nigeria.
  • H1: There is a significant factor instigating the delays and disruptions on cost of building construction in Nigeria.

1.7 Significance of Study

This study will be beneficial to the most construction industry in Nigeria because once a project is initiated and manage properly it will eliminate high cost of procurement and a lot profit are involved.

Also this will help in planning and execution of future construction project executions, especially the quantity surveyor in the feasibility and planning stages of a proposed scheme and preparation of work method and schedules by the building manager.

The study also intend to bring together, the causes of construction delays and disruptions and also tries to ascertain the costs, which will help the construction firms, Engineers, Surveyors and construction managers to initialize and control their project without lost or poor management.


1.8 Scope of Study

The scope of the research is focused on the Effects of Delays and Disruption on the Cost of Building Construction Projects in Nigeria using Enugu State as a case study.


1.9 Limitations of the Study

During the course of this study, many things militated against its completion, some of which are:

  1. Time Constraint: The time frame given to accomplish this project was very short due to school academic calendar and it was carried out under pressure which made the researcher not to implement some necessary features.
  2. Research material: availability of research material is a major setback to the scope of the study.
  3. Frequent power failure: This made the researcher append more money on fuel to ensure sustainable power.
  4. Financial Constraint: Insufficient fund tends to impede the efficiency of the researcher in sourcing for the relevant materials, literature or information and in the process of data collection (internet, questionnaire and interview).

1.10 Definition of Terms

Delay: Delay in construction can be defined as an act whereby projects execution is slow or interrupted one time or the other, thereby leading to unnecessary extension in the programme of work from what was initially scheduled.

Disruption: Disruption in construction projects can be defined as an act or sites partially or completely deserted at one time or the other for the reasons of certain exigencies which have resulted in prolonged delays which are not in accordance with the programme of work in use extension of time or postponement as initially scheduled.

Cost: The estimated amount of money that will be needed for something or the price that should be charged for something. Also, it implies the effort, loss or damage that is involved in order to do or achieve something.

Construction: The process or method of building or making something, especially road, building, bridges etc.


CHAPTER TWO

2.0 Literature Review

2.1 Introduction

The review of relevant literature is the main topic of this chapter. A literature review covers theoretical and methodological contributions to a certain issue in addition to the state of knowledge at the time of writing. It provides information about the state of the art in relation to the subject you are writing about. It examines the body of work on the chosen subject. The literature evaluation in this study comprises the …


Procedure for Downloading the PDF (Docx) Material


The Effects of Delays and Disruption on the Cost of Building Construction Projects in Nigeria (A Case Study of Enugu State) can be downloaded by requesting the full set of materials at the project or seminar cost. The document will be sent via Microsoft Word (MS-Word) format via WhatsApp (e-mail) following payment confirmation.


Seminar Material Cost
₦3,000
Project Material Cost
₦5,000




TABLE OF CONTENTS

PRELIMINARY PAGES


CHAPTER ONE

INTRODUCTION

  • 1.1 Introduction
  • 1.2 Background of Study
  • 1.3 Statement of Problems
  • 1.4 Aim and Objectives of Study
  • 1.5 Research Questions
  • 1.6 Research Hypothesis
  • 1.7 Significance of Study
  • 1.8 Scope of Study
  • 1.9 Limitations of the Study
  • 1.10 Definition of Terms

CHAPTER TWO

LITERATURE REVIEW

  • 2.1 Introduction
  • 2.2 Conceptual Review of Delay and Disruption
  • 2.3 Construction Delay and Causes
  • 2.3.1 Reason why Construction Projects are Delayed and Abandoned
  • 2.3.2 Common Problems Causing Delay in Construction
  • 2.3.3 Cause of High Costs of Construction
  • 2.3.4 Time Over-Runs and Cost
  • 2.4 Effects of Delays and Disruptions
  • 2.5 Theoretical Framework of Building Construction Delays and Disruptions
  • 2.6 Empirical Review of Related Literature
  • 2.7 Delay and Disruption in Construction in Summary

CHAPTER THREE

RESEARCH METHODOLOGY

  • 3.1 Introduction
  • 3.2 Research Design
  • 3.3 Area of Study
  • 3.4 Population of Study
  • 3.5 Sampling and Sampling Technique
  • 3.6 Validation of Research Instrument
  • 3.7 Method of Data Collection
  • 3.8 Method of Data Analysis
  • 3.9 Ethical Consideration
  • 3.10 Statistical Analysis

CHAPTER FOUR

DATA ANALYSIS, RESULT AND DISCUSSION

  • 4.1 Introduction
  • 4.2 Presentation and Analysis of Data
  • 4.3 Test of Hypothesis 1
  • 4.4 Test of Hypothesis 2
  • 4.5 Analysis of the Effects of Delays in Construction Projects
  • 4.6 Implication of the Findings
  • 4.7 Discussion of Findings

CHAPTER FIVE

SUMMARY, CONCLUSION AND RECOMMENDATION

  • 5.1 Introduction
  • 5.2 Summary of Findings
  • 5.3 Conclusion
  • 5.4 Recommendation
  • 5.5 Suggestion for Further Study

REFERENCES

APPENDIX A - “QUESTIONNAIRE”


Disclaimer for Complete Material Utilization

The displayed research work titled "The Effects of Delays and Disruption on the Cost of Building Construction Projects in Nigeria" is stated as a research guideline towards accomplishing your assigned project / seminar research work. All the research materials on this website are ONLY for research purposes and should be used as a guideline in developing your research work. For no reason should you copy word for word as projectlist.com.ng will not be liable for any who copied the material. By ordering the complete research guideline, it signifies that you've accepted our terms of service.


Frequently Asked Questions (FAQ)


Is the topic “Rights and Obligation of Parties Under the Contract of Carriage of Goods by Sea” recommended for Law Project?

Yes it is highly recommended — Transportation is an integral factor in international trade and the contract of carriage of goods by sea, forms part of the complex web of transactions witnessed at international trade. The purpose of this project is to illuminate the nature and the inherent features present in the contract of Carriage of Goods by Sea and to also highlight the rights as well as the duties owed by the parties. It also seeks to point the obligations the law imposes on the parties as well as the liabilities they would incur on the event of breach in this form of contract. …


Can the material for “Appraisal of the Place of Christian Religious Knowledge in Universal Basic Education” be used as a guide for Education Project?

Yes it can be used — This study is based on appraisal of the place of Christian Religious Knowledge (CRK) in Universal Basic Education (UBE): A study of Secondary School in Lagos State. In this study, the acronyms CRK were explained along side with different educational system and development in Nigeria. Implications of CRK placed in the National Policy on Education (NPE) in group ‘C’ were identified. The literature surveyed and explored the work of scholar, researchers that are inline relevant with the topic of the research. The descriptive research survey was adopted with self constructed 660(six hundred and sixty) copies of questionnaires to the students and the teachers to get information from them. Also, three hypotheses were generated using T- test statistic at 0.05 level …


Can the material for “Electronic Banking and the Challenges of Nigeria Business Environment” be used as a guide for Banking and Finance (BF) Project?

Yes it can be used — This research was carried out to examine “electronic banking and the challenges of Nigeria business environment using first bank of Nigeria plc, Auchi as a case study. A general introduction was made and some aims and objectives of the study were stated. Issue also examined were background of the organization understudy. Literature relevant to the study was examined and some relevant terms were discussed. Also consider the instruction used in the collection of data on this research work, in conduction this research, information were both primary and secondary source of information. Textbook, journals, and other publication relating to the topic were consulted. The research hypothesis was tested. It was therefore recommended that management staff should be trained and enlightened on …


Is the topic “Shortage of Human Resources in Government Establishment Problem and Solutions” recommended for Industrial Relations and Personnel Management (IRPM) Project?

Yes it is highly recommended — Human resources is a key component of production in economics world. Thus, the shortage in human resource leads to poor delivery and so many other factors. Human resources shortages requires effectives human resource management. Findings from research about ongoing shortage in human resources in government establishment are used to build a preliminary theory of problems and solutions as a appropriate Human Resources Management responses. The research revealed that the best human resource management practices are to attract, motivate, and retain human assets. The key factors responsible for the shortage of human resources as revealed by the research included: withdrawal by death, and through retirements etc. while the ministry of finance and Economic Planning Enugu State human resource shortage leads to drop …


Can the material for “The Impact of Incentive Plans on Employee Performance” be used as a guide for Business Administration and Management (BAM) Project?

Yes it can be used — The study was designed to provide information to organisations and establishments in either the Private or Public Sector in appreciating the impact of incentive plans on the performance of employees. The population of this study consisted of 50 respondents (38 males and 12 females) in age range of 21‑60 years with a mean of 33years who have been working in their respective offices. The sample of the study consistent of 40 Junior State and 10 Senior Staff that were randomly selected using the random sampling technique. The study was in two phases, the first phase was on standardization of the test instrument while the second phase was on assessment. The result of findings revealed a positive significant reliability of co‑relation co‑efficient of …


Can the material for “An Analysis of Flight Announcers’ Language” be used as a guide for Linguistics and Communication Project?

Yes it can be used — Flight announcers are pivotal in making sure that no traveller misses or boards the wrong flight when announcements are made in the airport; thus they must exhibit an excellent command of English in order to communicate effectively. Therefore, this research is motivated by the concern of how flight announcers in Nigerian airports pronounce their words during announcements. It is a phonological analysis on the language of flight announcers at the Murtala Muhammed Airport, Lagos. The main objective was to investigate their pronunciation patterns using three linguistic variables (/Ç/, /ð/ and /Ó¨/) in line with the Labovian theory of linguistic variation. The research instruments employed were a questionnaire (used to elicit respondents’ demographics) and reading tests (comprising of word list, phrase …


Can the material for “Makurdi Airport Terminal Building, Benue State” be used as a guide for Architecture Project?

Yes it can be used — The airport terminal is a building at an airport where passengers transfer between ground transportation and the facilities that allow them to board and disembark from the aircraft. Within the terminal, passengers purchase tickets, transfer their luggage, and go through security. The buildings that provide access to the airplanes (via gates) are typically called concourse. However, the terms terminals and concourses are used interchangeably, depending on the configuration of the airport. A functional airport passenger terminal is meant to ease the stress encountered by air passengers during the process of air travel. Therefore the architectural problem of the project is how best to provide an aesthetically pleasant, efficient, economical, bigger and more modern domestic airport passenger terminal, with good flexibility …


Can this topic “An Examination of Leadership Style Adopted by Organization” be used for Business Administration and Management (BAM) Project?

Yes it can be utilized for research — This study is specifically aimed at examining the leadership style adopted by the organisation with the particular reference to College of Education Agbor and Delta State University Abraka, Delta State. In accomplishing this task the writing surveyed the opinion of leaders of the above organisation and got the necessary information about the style of leadership they adopt. The growth of their business compared with their leadership styled, communication system adopt by the leadership problems encountered by the leaders in performing their task, grievance and motivation as criteria for high employee commitments. The research method used to descriptive based on the information generated from primary and secondary data collection. However, observation showed that democratic style of leadership is preferable to other styles but situation …


Can the material for “The Impact of Monetary Policies on Nigeria Commercial Bank” be used as a guide for Banking and Finance (BF) Project?

Yes it can be used — The economic policies or interpretation of such policies has always left a key question unanswered, how much authorities do such policies allow the banks to use their powers to lend, to made remarkable impact in the overall economic situation in the country. Like in banks in most developing economic (Nigeria inclusive) the role of providing advice and issuing financial directives lies in the ministry of finance, the Nigeria deposit insurance corporation and the central bank of Nigeria. The federal government relies on these institution for the proper functioning of banks through their monetary policies, which could be concretionary or expansionary. This invariably affects the commercial banks etc. hence the need for this study. The Zenith Bank Plc has been chosen in this …


Can this topic “An Ecocritical Analysis of Tanure Ojaide’s the Activist and Kaine Agary’s Yellow-Yellow” be used for English Language Project?

Yes it can be utilized for research — Ecocoritical studies intensely show the relationship between man’s environment and literature. In this way, ecocriticism becomes a standpoint that brings environmental discourse to the fore within a literary context; a context that shows the exploitation and decay in man’s environment. Following this assertion, themes that border on environmental degradation are routed in migration, pipeline vandalism, blowouts owing to gas flares and pollution. Most of the analyses on the concept of ecocriticism take the direction of the greenish nature of the environment and the extent of the marginalisation of a people. This research views ecocritism from a different perspective. It depicts ecocritism as a theory that deploys the tools of ecoactivism and resistance in the reading and analyses of Tanure Ojiade’s The …



Chat with us on WhatsApp