The Effects of Construction Delays on Projects Delivery in Nigeria

THE EFFECTS OF CONSTRUCTION DELAYS ON PROJECTS DELIVERY IN NIGERIA


ABSTRACT

Construction delay has become endemic in Nigeria. It is imperative to create awareness of the extent to which delays can adversely affect project delivery. This paper identifies, by questionnaire evaluates and through empirical method assesses the effects of construction delays. The findings showed that time and cost overruns were frequent effects of delay. Delay had significant effect on completion cost and time of 61 building projects studied. Client-related delay is significant in Nigeria. Acceleration of site activities coupled with improved clients’ project management procedure and inclusion of appropriate contingency allowance in precontract estimate should assuage the adverse effect of construction delays.


CHAPTER ONE

1.1 Introduction

… This chapter will address the background information that motivated this study, the challenges that prompted it, its aim, and its objectives as a preface to subsequent sections of the study. Additional factors include the study's significance, scope, limitations, research questions and hypotheses, and the definition of technical terms.


CHAPTER TWO

2.0 Literature Review

2.1 Introduction

The review of relevant literature is the main topic of this chapter. A literature review covers theoretical and methodological contributions to a certain issue in addition to the state of knowledge at the time of writing. It provides information about the state of the art in relation to the subject you are writing about. It examines the body of work on the chosen subject. The literature evaluation in this study comprises the …


Procedure for Downloading the PDF (Docx) Material


The Effects of Construction Delays on Projects Delivery in Nigeria can be downloaded by requesting the full set of materials at the project or seminar cost. The document will be sent via Microsoft Word (MS-Word) format via WhatsApp (e-mail) following payment confirmation.


Seminar Material Cost
₦3,000
Project Material Cost
₦5,000


Request Complete Material

Complete Material Chapters of The Effects of Construction Delays on Projects Delivery in NigeriaClick here to request the Complete Material via WhatsApp including;
  • Preliminary Pages,
  • Chapter 1-5,
  • References and Appendix.



TABLE OF CONTENTS

PRELIMINARY PAGES


CHAPTER ONE:

Introduction

  • 1.1 Background of the Study
  • 1.2 Statement of the Problem
  • 1.3 Objectives of the Study
  • 1.4 Research Questions
  • 1.5 Research Hypotheses
  • 1.6 Significance of the Study
  • 1.7 Scope/ Limitation of the Study
  • 1.8 Definition of Terms

CHAPTER TWO:

Review of Related Literature

  • 2.1 Introduction
  • 2.2 Conceptual Framework
  • 2.3 Theoretical Framework
  • 2.4 Empirical Review

CHAPTER THREE:

Research Methodology

  • 3.1 Introduction
  • 3.1 Research Design
  • 3.3 Area of the Study
  • 3.4 Population of the Study
  • 3.5 Sample Size and Sampling Techniques
  • 3.6 Instrumentation
  • 3.7 Validation of the Instrument
  • 3.8 Administration of the Instrument
  • 3.9 Method of Data Analysis

CHAPTER FOUR:

Presentation, Analysis and Interpretation of Data

  • 4.1 Introduction
  • 4.2 Presentation and Analysis of Data
  • 4.3 Testing of Hypotheses
  • 4.4 Discussion of Findings

CHAPTER FIVE:

Summary, Conclusion and Recommendations

  • 5.1 Introduction
  • 5.2 Summary
  • 5.3 Conclusion

REFERENCES


Disclaimer for Complete Material Utilization

The displayed research work titled "The Effects of Construction Delays on Projects Delivery in Nigeria" is stated as a research guideline towards accomplishing your assigned project / seminar research work. All the research materials on this website are ONLY for research purposes and should be used as a guideline in developing your research work. For no reason should you copy word for word as projectlist.com.ng will not be liable for any who copied the material. By ordering the complete research guideline, it signifies that you've accepted our terms of service.


Frequently Asked Questions (FAQ)


Can the material for “Computerized Accounting Information System for Business Growth in Organization” be used as a guide for Information System Project?

Yes it can be used — Computerized Accounting Information System is an electronic-based system that processes economic information and sup­ports decision tasks in the context of financial management and control of firm activities. The aim of the study is to Design and Implement a Computerized Accounting Information System. In achieving this aim, the following specific objectives were laid out to identify the relevance of computerized accounting information system for business growth, find out the various application of accounting information system by banks and identify the benefits of having an efficient computerized accounting information system. The motivation that led to the implementation of the proposed system is the poor accounting information jeopardizes administrative effectiveness, which makes managers of business organizations malnourished administratively in Nigeria. The methodology adopted …


Can the material for “Science Curriculum Implementation Strategies / Models in Senior Secondary Schools” be used as a guide for Education Project?

Yes it can be used — This study focuses on science curriculum implementation strategies/models in senior secondary schools in Port Harcourt. . A proper research was carried out to find out the strategies adopted in senior secondary schools in Port Harcourt for science curriculum implementation, to ascertain the factors Responsible for Implementation of Government Curriculum in senior secondary schools in Port Harcourt, to find out the challenges facing science curriculum implementation strategies in senior secondary schools in Port Harcourt, to determine the performance of students of senior secondary schools in Port Harcourt in science subjects, and to investigate how to improve science curriculum implementation strategies in senior secondary schools in Port Harcourt. In carrying out the research, research questions are been set in order to direct …


Is the topic “Budgeting System and Budgeting Control: as a Means of Improved Performance in Public Limited Company” recommended for Business Administration and Management (BAM) Project?

Yes it is highly recommended — The need for effective and proper planning necessitated the adoption of budgeting and budgetary control system. It is hoped that effective budgeting and budgetary would enhance effective performance, thereby, help in the attainment of the organization’s goals. This research will examine the role of budgeting and budgetary control towards effective planning in an organization as a whole, with specific objective of examining the need for sound budget preparation and implementation process. In going about this research work, primary and secondary methods will be used in data collection and sample methods were used in data analysis. This research work has become so important since organization performance is directly and indirectly dependant on how well an organization make use of budgeting and …


Can the material for “Design and Implementation of a School Management System” be used as a guide for Computer Science (CS) Project?

Yes it can be used — The Online School Management System will aid school proprietors, teachers, bursar and general administrative arm of schools to effectively manage students and other stakeholders of the school. The aim of the study is to design and implement an Online School Management System using Divine Concept International School as a case study. In achieving this aim, the following specific objectives were laid out as follows to develop an application software that will provide a secured school management system for registration and admission of students, keep track of student information such as school fees and results and facilitate attendance record keeping and various report generation. The motivation that led to the implementation of the proposed system is that transcripts of students are …


Can the material for “Minimum Wage and Workers Productivity in Nigeria” be used as a guide for Public Administration (PA) Project?

Yes it can be used — This work tries to examine the impact of minimum wages on workers productivity in Nigeria. Public enterprises, with reference to Anambra State Board of Internal revenue. The study was borne out of the fact that workers are not adequately motivated in the organization. The study adopted survey design with a total population of 326 and a sample size of 180 which was determined through Yaro Yamane sampling Technique. Questionnaires and interview were the instrument used in generating data for the study. It was found out that there is a relationship between minimum wage motivates worker for higher productivity. It was also found out that the organization often motivates workers with wages incentives. The study concludes that human resource is a …


Can the material for “Contributions of Insurance in the Management of Risk in Nigeria Oil Industries” be used as a guide for Insurance Project?

Yes it can be used — This project is on the topic titled “The Insurance Contribution in the Management of Risk in Nigeria Oil Industry” The work is divided into five chapters. Chapter one deals with background of the study, statement of problems that led to the research work, objectives of the study the research questions, scope of the research questions, scope of the research question, scope of the research question, scope and limitations of the study, significance of the study and definition of operational terms. Chapter two covers review of related literature, historical development of the insurance, reasons for insurance business in Nigeria, type of drilling operations, various type of risk in oil industry and so on. Chapter three discusses research methodology including source of …


Can this topic “Design and Implementation of Fall Detection System Based on Deep Learning and Image Processing in Cloud Environment” be used for Computer Science (CS) Project?

Yes it can be utilized for research — Deep learning is a machine learning method based on characterization of data learning. Fall detection system based on cloud environment usually embedded in the human activity area with wireless sensor networks, infrared sensors, sound sensors, pressure sensors, radar and other sensors to capture body movements and posture information. The aim of the study is to design and implement a Fall Detection System Based on Deep Learning and Image Processing in Cloud Environment. In achieving this aim, the following specific objectives were laid out as follows to develop an application software that will provides a new way and a new method for the realization and application of fall detection and survey on cloud computing infrastructure and platform for image processing as …


Can the material for “Customer Satisfaction and Its Implication on Banks Performance in Nigeria” be used as a guide for Banking and Finance (BF) Project?

Yes it can be used — Satisfaction is the customer’s evaluation of a product or service in terms of whether that product or serve has met their needs and expectations. Happy and satisfied customers behave in a positive manner. However, almost every Nigerian banks encounters similar problems in meeting customer’s expectation of services and customer satisfaction. It is against this backdrop that this study tries to evaluate customer’s satisfaction and its implication on banks performance in Nigeria. The study uses a primary source of data collection i.e. questionnaire structured by respondents and validity by two experts. Basically, this study adopts both the descriptive and explanatory survey design methods. Result from the study shows that customer appreciates electronic banking services but still not satisfied with the quality …


Can the material for “Design and Implementation of an IOT (Internet of Things) Based Smart Parking System” be used as a guide for Computer Science (CS) Project?

Yes it can be used — IOT Based Smart Parking System for managing the records of the incoming and outgoing vehicles in an parking house. It is an automatic system which delivers data processing in very high speed in systematic manner. The aim of the study is to design and implement an IOT Based Smart Parking System/ In achieving this aim, the following specific objectives were laid out as follows to develop an application software that will determine the cost of per vehicle according to their time consumption, track the entry and exit of cars and maintain a listing of cars within the parking lot. The motivation that led to the implementation of the proposed system is as a result of traffic issues due to illegal …


Is the topic “Effect of Savings on Interest Rate in Nigeria (1981-2013)” recommended for Economics Project?

Yes it is highly recommended — This study examined the impact of interest rate on savings in Nigeria within the sampled period of 1981-2013. The data for this research work was obtained from the CBN Statistical Bulletin (1981 − 2013) and analyzed using ordinary least square (OLS) analysis. Domestic Savings (SAV), was regressed against Interest Rate (INT), Money supply (MS) and Income (Y). The result revealed that there is a positive relationship between interest rate on deposit and savings which is in conformity with economic expectation and theory as was propounded by Keynes. Cointegration test revealed that the entire variables have long run relationship with domestic saving in Nigeria within the sample period with at least one co-integrating equation. The unit root test indicates that none of …



Chat with us on WhatsApp