THE EFFECT OF FLUCTUATIONS AND VARIATIONS IN CONSTRUCTION PROJECT DELIVERY
ABSTRACT
The impact of variation and fluctuation and the management in construction contract project is one of the biggest problems construction firms and professional faces. Variation and fluctuation can lead to many negative effects such as disputes, arbitration, between clients and contractors, time and cost overruns, loss of productivity, contract termination and project abandonment. Even though various studies have been undertaken on the causes and effects of variations and fluctuations, these studies seldom discuss the management of the phenomenon. The study investigates The Effect of Fluctuations and Variations in Construction Project Delivery and the endemic construction of building contract projects delays, its rising cost and abandonment in Imo state Nigeria. In achieving this aim, the following specific objectives were laid out to ensure that adequate time and care are allocated to tender examination and tender analysis and ensure that the contractor is handed all necessary information to carry out the construction of the building as soon as the contract is placed. Primary data were collected from the primary source which questionnaire was used as an instrument of data collection while secondary data were sources from textbooks, journals, newspapers and the internet were employed. The data were presented on a frequency distribution table and analyzed using simple percentage, while hypothesis was tested using chi-square test. The beneficiaries of this research work are, the contractors the clients who are placed in position not to bear the burden of risk inherent in variation and fluctuations, that is, increase in costs which most often than not cumulate to time and costs overruns. These on the long run lead to abandonment of building projects.
CHAPTER ONE
1.1 Introduction
Construction Project management methodologies are not designed to be generic but applicable to all projects at any given time, as they need to be adapted to individual project objectives, in order to achieve consistent project management success. Therefore, it appears that either PM methodologies are wrongly applied or project management does not directly influence the success of projects. Traditional project management, however, causes self-inflicted problems impacting project performance negatively or worse, causing projects to fail (Koskela and Howell, 2002). Recent studies point towards the lack of clear definitions of project management and project success (Shenhar and Wideman 2000).
As a prelude to other parts of this study, this chapter will discuss the background upon which this study was initiated, the statement of problems that led to this study, the Aim and Objectives of the study. Others are Significance of the study, Scope of work, Research hypothesis and questions, Limitations of the Study and Definition of technical terms.
1.2 Background of Study
The traditional contract theory has ensured that a contract should contain the agreement that would deal specifically with all expected incident which may or may not occur in the future in the course of managing the execution of the building project. If the parties to the contract intend therefore to contend and contain all agreement for uncertain situation in one simple document “the contract”, the contract document would likely become extremely complex. This is why the construction contract is regarded as “incomplete” contracts which do not provide specific responses for all contingencies but is based on the rule of “risk sharing”.
Collectively therefore, construction contract projects cover many errors that can be broken down into the process of construction of building, bridges, roads and the likes, and an agreement arrangement that is legally binding on the parties to it, that if broken, may be enforced by action in court against the defaulting party. In this regard therefore, a contracting party is bound because he has agreed to be so bound. Furthermore, such an agreement must be intended to create and be capable of affecting legal relations in order to be able to give risk to a contract.
These are relevant ingredient in the construction of building contract and do contain the provisions as to how to deal specifically with all expected incidents when they arise. This means that construction contract must entail “project cycle” management from inception, that is pre-contract stage to execution and completion and others grouped under post contract stage to execution and completion.
Sidney (1980) defines variation as; this involves variation through the processes of Architects Instruction (AI'S), valuation of fluctuation of claims that result from the architect's instruction, where who gets what from who is ascertained. This is made possible when the contract duration spend twelve months and more and fluctuation clause form part of the contract term.
In order to cope with the experience of the variations order, therefore the impact and management of variations and fluctuation in construction contract project becomes on “since fuo non” to maintaining a cordial relationship between the client and the contractor and even the other professionals engaged in the same project execution (Nwachukwu, 1991).
Therefore, in Nigeria where the research was carried out, the activities that was conducted is to know the Effect of Fluctuations and Variations in Construction Project Delivery.
1.3 Statement of Problems
The construction industry in Nigeria is import dependent with various economic measures introduced by the government that directly and indirectly result in constant and rapid “upward” price changes for the principal construction “imported” material like cement reinforcement steel bars and the likes.
Those manufactured locally, such as ceramic tiles, asbastos ceiling sheets to mention but a few equally have foreign input in terms of foreign exchange rate and import duties related problems and even value added tax (VAT) on them.
It is therefore essential that provisions be made for the construction of building project that span twelve months and more to incorporate the fluctuation clause; that is, clause 31A to F of the federal ministry of works and housing otherwise called GC/WORKS/FORM EDIITON, where the parties have agreed to fluctuation of cost sand whose contract sum shall be deemed to have been calculated in the manner set out in the appropriate manner subject to variations in the event specified in.
The rules in the schedules of rate being based upon the rates of wages and other emoluments and expenses (including the cost of employers liability insurance and third party insurance) payable by the contractor to the work people engaged upon or in connection with the works in accordance with the rates of wages fixed by the federation of building and civil engineering construction current at the date of feder and applicable to the area concerned.
“All these point to one thins how to put the ever increasing cost of construction of building in check and when it occurs, how the risk is shared between the client and the contractor.
1.4 Aim and Objectives of Study
The aim of the study is to investigate the Effect of Fluctuations and Variations in Construction Project Delivery and the endemic construction of building contract projects delays, its rising cost and abandonment in Imo state Nigeria. In achieving this aim, the following specific objectives were laid out as follows:
- To ensure that adequate time and care are allocated to tender examination and tender analysis.
- To ensure that the contractor is handed all necessary information to carry out the construction of the building as soon as the contract is placed.
- To ensure that the contractor realize that the Architect is empowered by the conditions that constitute variation and fluctuations.
- To determine why the architect should settle the dates of possession of the site and completion of work with the contractor at the on-set.
1.5 Research Questions
The study came up with research questions so as to be able to ascertain the above stated objectives. The specific research questions for the study are stated below as follows:
- What is the major effect of variation in construction contract project?
- What is the relationship between fluctuations and the contract sum?
- Can fluctuation be controlled in construction contract projects?
- What is role of the quantity surveyor in managing the effects of variation and fluctuations on construction contract projects as it concerns the client and the contractor?
1.6 Research Hypothesis
In order to pursue the objective of this study, the following generalized statements have been designed to guide and aids in obtaining the result for the experiment to be conducted. For this work, the null hypothesis will be represented with H0 while the alternative hypothesis will be represented with hypothesis H1.
Hypothesis One
- H0: There is no significant effect of variation in construction contract project delivery
- H1: There is a significant effect of variation in construction contract project delivery
Hypothesis Two
- H0: Construction project fluctuation Cannot be controlled in construction contract projects
- H1: Construction project fluctuation Can be controlled in construction contract projects
1.7 Significance of Study
The beneficiaries of this research work are, the contractors the clients who are placed in position not to bear the burden of risk inherent in variation and fluctuations, that is, increase in costs which most often than not cumulate to time and costs overruns. These on the long run lead to abandonment of building projects.
The economy at large will also benefit in the sense that less abandoned projects would dot the streets and employment sustained for that various professionals and skill and unskilled hands engaged in the industry.
1.8 Scope of the Study
The scope of this research covers the importance of managing variation and fluctuations in the building industry as well as the impact. It also examines the relevant clauses that deal with variation and fluctuation in the building industry in Nigeria (Imo) with particular reference to vital requirement that states “No variation shall vitiate the contract”. This is an essential clause that protects the parties in the building and similar construction contract projects on the face of the rules of contract law; where variation orders means introduction of new elements into the contract that would have ordinarily meant a breach for which the contractor may determine the contract and claim damages.
Furthermore, “The standard form of contract for Building project ICT” so Edition Private without quantities” clause 13.1 has far reaching effect in variation under;
- Circumstances that would not have been reasonably fore seen before placing the contract.
- Additional requirement of the employers.
- Compliance with new government order or legislation.
- Correction of errors or omissions in the contract drawing and contract bills.
- Non-availability of materials and goods and workmanship specified in the contract.
- Substitution of materials and goods and workmanship specified in the contract.
1.9 Limitations of the Study
During the course of this study, many things militated against its completion, some of which are:
- Time Constraint: The time frame given to accomplish this project was very short due to school academic calendar and it was carried out under pressure which made the researcher not to implement some necessary features.
- Establishment Policies: Establishment policies posed a serious limitation as most staffs are not ready to release information needed for this project work. There were lots of information needed from the staffs of this establishment to enhance the study which took them time to release or they did not release at all for security purposes, hence the scope was reduced.
- Research material: availability of research material is a major setback to the scope of the study.
- Frequent power failure: This made the researcher append more money on fuel to ensure sustainable power.
- Financial Constraint: Insufficient fund tends to impede the efficiency of the researcher in sourcing for the relevant materials, literature or information and in the process of data collection (internet, questionnaire and interview).
1.10 Definition of Terms
Before going further to illustrate the effects and management of variation of building industry, it is important to have a brief definition of some key words that features in this research study;
- Date Of Tender: This means the data that is fixed for the receipt of the tender by the employers it is usually ten(10) days before the receipt of tender.
- Contract Sum: This is the sum that cannot be adjusted or altered in any way whatsoever, otherwise then in accordance with the express provision of the conditions of contract and subject to clause 2.2 of the JCT'S edition, that stipulates that, any error whether of Arithemetic or not in the accepted by the parties hereto. JCT 80 14.2.
- Architects Instructions: These are the empowering instructions in the conditions of contract JCT 80 edition clause 401-4.3.2 that he (the contractor) may make reasonable objective in writing to the architect to such compliance, all architects instruction (A.I.S) must be made in writing or confined within 5 working days if given orally. They constitute variations.
1.11 Organization of the Work
This work in five chapters as; chapter one deals with the introduction, chapter two is the literature review and chapter three deals with the research methodology. Data presentation and analysis is dealt with in chapter four while chapter five covers the summary, conclusion and recommendation.
CHAPTER TWO
2.0 Literature Review
2.1 Introduction
The review of relevant literature is the main topic of this chapter. A literature review covers theoretical and methodological contributions to a certain issue in addition to the state of knowledge at the time of writing. It provides information about the state of the art in relation to the subject you are writing about. It examines the body of work on the chosen subject. The literature evaluation in this study comprises the …
Procedure for Downloading the PDF (Docx) Material
The Effect of Fluctuations and Variations in Construction Project Delivery can be downloaded by requesting the full set of materials at the project or seminar cost. The document will be sent via Microsoft Word (MS-Word) format via WhatsApp (e-mail) following payment confirmation.
Seminar Material Cost ₦3,000 | Project Material Cost ₦5,000 |
Request Complete Material
![]() | Click here to request the Complete Material via WhatsApp including;
|
TABLE OF CONTENTSPRELIMINARY PAGES
- Title page
- Approval page
- Dedication
- Acknowledgement
- Table of Contents
- Abstract
INTRODUCTION
- 1.1 Introduction
- 1.2 Background of Study
- 1.3 Statement of Problems
- 1.4 Aim and Objectives of Study
- 1.5 Research Questions
- 1.6 Research Hypothesis
- 1.7 Significance of Study
- 1.8 Scope of the Study
- 1.9 Limitations of the study
- 1.10 Definition of Terms
- 1.11 Organization of the Work
LITERATURE REVIEW
- 2.1 Introduction
- 2.2 Construction Project
- 2.3 Problems that Create Delays and Disruption to Progress of Works
- 2.3.1 Causes of Delays and Disruptions
- 2.3.2 Effects of Delays and Disruptions
- 2.4 Variation and Fluctuation in Construction Project
- 2.5 Effect of Variations and Fluctuation
- 2.6 Construction Contract Project Delivery
- 2.6.1 Construction Project Delivery Methods
- 2.7 Delays and Claims
- 2.8 Fluctuation Clauses in Construction Contract Projects
- 2.9 Cost Control
RESEARCH METHODOLOGY
- 3.1 Introduction
- 3.2 Research Design
- 3.3 Population of Study
- 3.4 Sampling and Sampling Technique
- 3.5 Validation of Research Instrument
- 3.6 Method of Data Collection
- 3.7 Method of Data Analysis
- 3.8 Questionnaire
- 3.8.1 Interview
- 3.8.2 Key Informants Interview
- 3.8.3 Observation
- 3.9 Statistical Analysis
DATA ANALYSIS, RESULT AND DISCUSSION
- 4.1 Introduction
- 4.2 Presentation and Analysis of Data
- 4.3 Test of Hypothesis 1
- 4.4 Test of Hypothesis 2
- 4.5 Discussion of Findings
SUMMARY, CONCLUSION AND RECOMMENDATION
- 5.1 Introduction
- 5.2 Summary
- 5.3 Conclusion
- 5.4 Recommendation
REFERENCES
APPENDIX A - “QUESTIONNAIRE”
Disclaimer for Complete Material Utilization
The displayed research work titled "The Effect of Fluctuations and Variations in Construction Project Delivery" is stated as a research guideline towards accomplishing your assigned project / seminar research work. All the research materials on this website are ONLY for research purposes and should be used as a guideline in developing your research work. For no reason should you copy word for word as projectlist.com.ng will not be liable for any who copied the material. By ordering the complete research guideline, it signifies that you've accepted our terms of service.
PRELIMINARY PAGES
- Title page
- Approval page
- Dedication
- Acknowledgement
- Table of Contents
- Abstract
INTRODUCTION
- 1.1 Introduction
- 1.2 Background of Study
- 1.3 Statement of Problems
- 1.4 Aim and Objectives of Study
- 1.5 Research Questions
- 1.6 Research Hypothesis
- 1.7 Significance of Study
- 1.8 Scope of the Study
- 1.9 Limitations of the study
- 1.10 Definition of Terms
- 1.11 Organization of the Work
LITERATURE REVIEW
- 2.1 Introduction
- 2.2 Construction Project
- 2.3 Problems that Create Delays and Disruption to Progress of Works
- 2.3.1 Causes of Delays and Disruptions
- 2.3.2 Effects of Delays and Disruptions
- 2.4 Variation and Fluctuation in Construction Project
- 2.5 Effect of Variations and Fluctuation
- 2.6 Construction Contract Project Delivery
- 2.6.1 Construction Project Delivery Methods
- 2.7 Delays and Claims
- 2.8 Fluctuation Clauses in Construction Contract Projects
- 2.9 Cost Control
RESEARCH METHODOLOGY
- 3.1 Introduction
- 3.2 Research Design
- 3.3 Population of Study
- 3.4 Sampling and Sampling Technique
- 3.5 Validation of Research Instrument
- 3.6 Method of Data Collection
- 3.7 Method of Data Analysis
- 3.8 Questionnaire
- 3.8.1 Interview
- 3.8.2 Key Informants Interview
- 3.8.3 Observation
- 3.9 Statistical Analysis
DATA ANALYSIS, RESULT AND DISCUSSION
- 4.1 Introduction
- 4.2 Presentation and Analysis of Data
- 4.3 Test of Hypothesis 1
- 4.4 Test of Hypothesis 2
- 4.5 Discussion of Findings
SUMMARY, CONCLUSION AND RECOMMENDATION
- 5.1 Introduction
- 5.2 Summary
- 5.3 Conclusion
- 5.4 Recommendation
REFERENCES
APPENDIX A - “QUESTIONNAIRE”
Disclaimer for Complete Material Utilization
The displayed research work titled "The Effect of Fluctuations and Variations in Construction Project Delivery" is stated as a research guideline towards accomplishing your assigned project / seminar research work. All the research materials on this website are ONLY for research purposes and should be used as a guideline in developing your research work. For no reason should you copy word for word as projectlist.com.ng will not be liable for any who copied the material. By ordering the complete research guideline, it signifies that you've accepted our terms of service.
Frequently Asked Questions (FAQ)
Can the material for “Design and Implementation of an Online Personnel Audits Management Information System” be used as a guide for Computer Science (CS) Project?
Yes it can be used — An Online Personnel Audits Management Information System is an application software that executes a recurring evaluation to assess the efficiency of personnel management and identify the actions necessary for optimizing the use of human resources. The aim of the study is to design and implement an Online Personnel Audits Management Information System. In achieving this aim, the following specific objectives were laid out to develop an application that will give a more accuracy and timely information for government decision making, and provide facilities for quick access to stored data giving at random in other to assist in management functions. The motivation that led to the implementation of the proposed system is that the accumulation of this document in files creates …
Can this topic “Public Perception of Girl Child Education Among Rural Dwellers” be used for Education Project?
Yes it can be utilized for research — This study examined public perception of girl child education among rural dwellers in Laffia North L.G.A: Implications for social work practice. Data for the study were drawn using the questionnaire and in-depth interview. Data were analysed using the chi-square. Using a sample size of 521 (made up of 509 questionnaire respondents and 12 interviewees), findings of the study revealed that male respondents have negative views about educating a girl-child than female respondents; respondents with higher level of education have positive views on educating the girl-child; those with high income have positive view on educating their female children than those with low income; and, younger respondents have positive perception of girl-child education than older respondents. Based on these findings, the study …
Can the material for “Effect of Temperature on the Growth of Yeast” be used as a guide for Science Laboratory Technology (SLT) Project?
Yes it can be used — Yeast cells respire aerobically if there is enough oxygen supply. If there is not enough oxygen present then fermentation will take place as the yeast cells have to respire anaerobically. Fermentation makes energy that is used for cell growth. When yeast cells ferment they also produce ethanol (alcohol) which is important to brewers. The yeast cells need sugar to ferment as without sugar, the yeast cells would not be able to respire at all. The sugar supply provided is called sucrose, Enzymes in the yeast cells break down the sucrose into glucose. Yeast reproduces by budding in other words when the yeast cell grows too big. It splits to make two metical copies of itself. This form of reproduction is …
Can the material for “Effect of School Records on the Academic Performance of School Student” be used as a guide for Education Project?
Yes it can be used — The study was carried out to investigate the effect of school records on the academic performance of school student. In achieving this aim, the following specific objectives were laid out to examine the school records kept and maintenance processes of the records in Secondary Schools, examine the effect of school records on secondary school students’ academic performance and examine the challenges associated with the keeping of school records in Chikun LGA, Kaduna state. The research design used in this report is descriptive design, utilizing questionnaire method to obtain information from the respondents for this project. A total of 133 (one hundred and thirty three) respondents were selected for this study to represent the entire population of the study. For null …
Can the material for “Informal Micro Financing and Small Scale Business” be used as a guide for Business Administration and Management (BAM) Project?
Yes it can be used — The main objective for embarking on this study was to examine informal micro financing and small scale business in Makurdi Local Government Area: a study of daily contribution. A survey research design was adopted with a sample of 160, using a four (4) point Likert rating scale administered a questionnaire to the sampled respondents and analyzed using simple descriptive and inferential statistics and Chi-square test to test the hypotheses at 0.05 level of significance. The result showed that, microfinance institutions do not care about the finances of small scale businesses but grants loans to them when they think the small scale business has enough collateral to secure the loan. For that matter they do not provide any financial advice and …
Can this topic “Antibiotics Susceptibility of Staphylococcus Aureus” be used for Microbiology Project?
Yes it can be utilized for research — Staphylococcus Aureus are bacteria found in the environment, foods, and intestines of people and animals, they are large and diverse group of bacteria. Water is very essential for life. Both humans and animals need water to survive since all cellular activities take place in fluid medium. Blood, which contains 80% water, is vital in transporting oxygen to the tissues and carbon dioxide from the tissues as well as being the life support system for the body. The study determines the Antibiotics Susceptibility and Bio-burden of Staphylococcus Aureus Isolated from Water Samples. In achieving this aim, the following specific objectives were laid out to isolate and identify Staphylococcus Aureus present in water, determine the antibiotic susceptibility of the above isolated organisms, …
Can the material for “Economic Analysis of Post Harvest Losses Among Leafy Vegetable Marketers” be used as a guide for Agricultural Economics and Extension Project?
Yes it can be used — Postharvest loss is the degradation in both quantity and quality of a food production from harvest to consumption. The study was carried out to estimate the physical losses and corresponding financial value of post harvest losses in green vegetables in Owerri-west Local Government Area in Imo State. In achieving this aim, the following specific objectives were laid out to estimate the physical losses of green vegetable during marketing and identify the causes of the losses during marketing. Investigation revealed that the importance of leafy vegetables in improving the nutritional and economy needs of rural farmers cannot be underestimated. Leafy vegetables are essential part of human diets, but they are perishable by nature. Losses of leafy vegetables and economic opportunities have …
Can this topic “Private Enterprises and Rural Development” be used for Public Administration (PA) Project?
Yes it can be utilized for research — This work centered on private enterprises and rural development in Anambra state. The objectives include: to ascertain the extent to which private enterprises have contributed to rural development in Anambra state; to find out the challenges facing private enterprises in rural development in Anambra state; to examine the measures to enhance participation of private enterprises in rural development in Anambra state.It is a survey type of research since it investigated what happened in the researcher’s absence. It is also explanatory in nature; having tried to explain the role played by private enterprises in Anambra state. In sampling, stratified random sampling technique was applied where the researcher created strata to represent different interests within the population. Also, purposive sampling was applied …
Is the topic “Physical Work Environment and the Employees Performance in Selected Firms in River State” recommended for Office Technology and Management (OTM) Project?
Yes it is highly recommended — Physical work environment (PWE) is a subset of work environment which consist of physical and psychological environment. Equipments are central to the achievement of the goals of productive firms such as Nigeria Pabod Breweries Limited and Palm Nectar Breweries Ltd, this is possibly the reason they ensure that state of the art equipment are purchased and installed. They do not stop at that but also train their employee on how to operate such equipment for optimum performance. The aim of the study is to examine the Physical Work Environment and the Office Manager's Performance in Pabod Breweries Limited and Pabod Breweries Limited, River State. In achieving this aim, the following objectives were set out as follows; to examine the nature …
Can the material for “Structural Analysis of the Nigerian Financial System in the Post Liberalization Era and It’s Impact on Economic Growth” be used as a guide for Economics Project?
Yes it can be used — This study assessed the impact of the liberalization of the Nigerian financial system on the structural changes witnessed in the system as a result of liberalization as well as the impact of the resulting structural change on economic growth using a three stage least in a system of three endogenous variables. System of equations was used to capture the transmission mechanism of financial liberalization as contained in the McKinnon and Shaw financial repression hypothesis with annual data from 1986 to 2012. The study found that the Nigeria financial system had undergone major changes in term of both nature and composition. Liberalization further helped in creating a diversified financial system which is vibrant and robust, though deposit money banks still dominate the …