INFLUENCE OF LABOUR PRODUCTIVITY ON THE COST PERFORMANCE OF THE TRADITIONALLY PROCURED PROJECTS
ABSTRACT
Based on low productivity problems facing the global construction industry, this study evaluated the influence of labour productivity on cost performance. The objectives include to identify productivity related factors influencing cost performance; determine the most significant productivity factor influencing cost performance, and to evaluate the relationship between labour productivity and cost performance. A questionnaire survey was used to elicit relevant data from stakeholders in construction and project management (including other built environment professionals) in the construction industry in Akwa Ibom state. Eighty-two subjects were targeted and data collected was subjected to analyses using appropriate test statistics. Test statistics include percentages, mean item score and Spearman Ranked Correlation test. The study identified productivity related problems influencing cost performance; and conclude that the productivity of workers in construction sites does not correlates cost performance in these project. The implication is that, cost budgeting and planning for new projects fully acknowledged the low productivity problems and estimated often take steps to provide buffers for possible variation that may eschew.
CHAPTER ONE
1.0 Introduction
1.1 Background to the Study
Construction is the world's largest and most challenging industry. The industry is highly a dynamic sector and plays a very important role in the development of a country. However, construction industry, faces chronic problems such as poor productivity, poor performance of time and cost etc, as reported only 37.2% of projects were completed within their predetermined cost. This was as a result of lack of investigation on construction labour productivity and cost performance.
Butler (1986) in Anthil and Wood-Head (1990) defined productivity as ‘the rate between output and input' and industrial productivity as ‘the arithmetical ratio between the work product and he total resources used. Borcherding and Liou (1986) defined productivity as ‘the relationship between input and outputs'. Based on this view, Construction productivity can be dealt with as the measure of value of construction works in relation to the total cost of labour, plant and materials actually used in the execution of the work.
Labour is one of the basic requirements of the construction industry and is usually related to manpower. In other words, labour productivity was defined by Drewin (1982) as the ‘amount of goods and services provided by a productive factor (manpower) in the unit of time'.Gido and Clement (2003) mentioned that cost performance is an effective technique in project management effort expended and it is used to measure the efficiency of total cost to budgeted cost. It is found that it is important to study more details on cost performance of building and it is agreed by Ashworth (1994) that ‘cost studies of building consist of the application of techniques and expertise of economies to construction projects'. Also, it is to ensure available resources are used efficiently to increase the level of productivity in construction work.
In the construction industry, site workers, account for approximately 40% of the cost of project thus a relationship is established between labour productivity and cost performance. In Nigeria's construction industry for instance, companies are currently applying various non-financial incentives schemes aimed at operative productivity, this has significantly improved cost efficiency. If the concept of productivity of labour is properly understood, appreciated and facilitated, there will be an improvement of cost performance of projects. This will in effect, enhance workers out-put and further contribute to cost performance. It is in the light of this, that this research study on the Influence of labour productivity on the cost performance has been embarked upon.
1.2 Statement of the Problem
Many factors are responsible for the influence of labour productivity on cost performance in project. These factors when not put in place could bring about reduction in level of productivity and consequently affect cost performance of projects. There has been lack of investigation into labour productivity and cost performance which is probably due to the low level of awareness of the merits of such investigations. This problem has overtime denied construction works of its ideal cost and if un-attended to, it might in the nearest future overshadow the important potentials of improved labour productivity.
Another problem that has been identified is that of inconsistency in the level of labour productivity. This has subsequently affected cost of the project. It is therefore imminent for this problem to be assessed and solved so as to institutionalize a consistent standard for construction projects.
Low level of motivation and incentives such as welfare packages, awards to best worker, award to longest serving staff all, serve as a dependable instrument for improving labour productivity. But this has not been found in construction industry. Finally, this study was embarked upon to ascertain how improved productivity would influence cost performance. This study seeks to provide solutions to the above identified problems.
1.3 Aim and Objectives of the Study
The aim of this research is to evaluate the influence of labour productivity on the cost performance of traditionally procured projects. The objectives of this study are as to:
- Identify productivity related factors influencing cost performance
- Determine the most significant productivity factor influencing cost performance
- Evaluate the relationship between labour productivity and cost performance.
1.4 Research Questions
The following are the research questions:
- What productivity related factors influences cost performance?
- What is the most significant productivity factors influencing cost performance?
- What is the relationship between labour productivity and cost performance?
1.5 Research Hypothesis
The following are the research Hypothesis stated as follows;
Null Hypothesis (Ho): There is no relationship between labour productivity and cost performance of a building project
Alternative Hypothesis (H1): There is a relationship between labour productivity and cost performance of a building project
1.6 Limitations of the Study
During the course of this study, many things militated against its completion, some of which are:
- Time Constraint: The time frame given to accomplish this project was very short due to school academic calendar and it was carried out under pressure which made the researcher not to implement some necessary features.
- Establishment Policies: Establishment policies posed a serious limitation as most staffs are not ready to release information needed for this project work. There were lots of information needed from the staffs of this institution to enhance the study which took them time to release or they did not release at all for security purposes, hence the scope was reduced.
1.7 Significance of the Study
Research work such as this is not merely done to fulfil an academic curriculum. It is expected that it should be a concerted effort to broaden or add to an existing knowledge on a particular subject, or more so establish a logical and important fact as a new contribution to the line of profession. Productivity of labour and cost performance of construction projects is as important to construction and national economic growth as it is vast and complicated. It is therefore imminent that further studies and researches be carried out to consolidate the already existing knowledge of it.
Construction clients, contracting organizations, specialist, consultants and suppliers, individual professional contractors, lecturers and students in the construction and allied field would find the study very useful as it will contribute to their own effort to optimize their level of involvement in construction activities. Based on the results and findings of this research work, construction stakeholders, would be able to appreciate and control the parameters involved in the productivity and cost performance concept of construction projects.
1.8 Scope of the Study
The influence of labour productivity on cost performance can be studied in any construction project throughout Nigeria. However, due to the outrageous cost of covering a wider area, this study has been limited to traditionally procured projects in Uyo capital city of Akwa Ibom State. Furthermore, due to the large scope of construction project the study was further limited to building construction projects.
1.9 Organisation of the Work
This research work is divided into five (5) chapters
The first chapter contains the introduction which includes background of study, statement of problem, Research Questions, Aim and objectives, hypothesis, significance, scope and limitation of study.
Chapter two (2) reviews the literature of related works
Chapter thee (3) is the research methodology which includes Research Design, sampling Techniques, instrument of data collection and method of Data Analysis.
Chapter four (4) is the data presentation and analysis
Chapter five contains the discussion, and recommendations.
CHAPTER TWO
2.0 Literature Review
2.1 Introduction
The review of relevant literature is the main topic of this chapter. A literature review covers theoretical and methodological contributions to a certain issue in addition to the state of knowledge at the time of writing. It provides information about the state of the art in relation to the subject you are writing about. It examines the body of work on the chosen subject. The literature evaluation in this study comprises the …
Procedure for Downloading the PDF (Docx) Material
Influence of Labour Productivity on the Cost Performance of the Traditionally Procured Projects can be downloaded by requesting the full set of materials at the project or seminar cost. The document will be sent via Microsoft Word (MS-Word) format via WhatsApp (e-mail) following payment confirmation.
Seminar Material Cost ₦3,000 | Project Material Cost ₦5,000 |
Request Complete Material
Click here to request the Complete Material via WhatsApp including;
|
TABLE OF CONTENTSPRELIMINARY PAGES
- Title page
- Approval page
- Dedication
- Acknowledgement
- Table of Contents
- Abstract
INTRODUCTION
- 1.0 Introduction
- 1.1 Background …
- ⋮
LITERATURE REVIEW
- 2.1 Introduction
- 2.2 Conceptual Review
- 2.3 Theoretical Framework
- ⋮
- 2.4 Empirical Studies
CHAPTER THREE
RESEARCH METHODOLOGY
- 3.1 Introduction
- 3.2 Research Design
- 3.3 Population of Study
- 3.4 Sampling and Sampling Technique
- 3.5 Validation of Research Instrument
- 3.6 Method of Data Collection
- 3.7 Method of Data Analysis
- 3.8 Questionnaire Administration
- 3.9 Ethical Consideration
- 3.10 Statistical Analysis
CHAPTER FOUR
DATA ANALYSIS, RESULT AND DISCUSSION
- 4.1 Introduction
- 4.2 Presentation and Analysis of Data
- 4.3 Re-statement of Research Questions
- 4.4 Test of Hypotheses
- 4.5 Discussion of Findings
CHAPTER FIVE
SUMMARY, CONCLUSION AND RECOMMENDATION
- 5.1 Introduction
- 5.2 Summary of Findings
- 5.3 Conclusion
- 5.4 Recommendation
- 5.5 Suggestion for Further Study
REFERENCES
APPENDIX A - “QUESTIONNAIRE”
Disclaimer for Complete Material Utilization
The displayed research work titled "Influence of Labour Productivity on the Cost Performance of the Traditionally Procured Projects" is stated as a research guideline towards accomplishing your assigned project / seminar research work. All the research materials on this website are ONLY for research purposes and should be used as a guideline in developing your research work. For no reason should you copy word for word as projectlist.com.ng will not be liable for any who copied the material. By ordering the complete research guideline, it signifies that you've accepted our terms of service.
PRELIMINARY PAGES
- Title page
- Approval page
- Dedication
- Acknowledgement
- Table of Contents
- Abstract
INTRODUCTION
- 1.0 Introduction
- 1.1 Background …
- ⋮
LITERATURE REVIEW
- 2.1 Introduction
- 2.2 Conceptual Review
- 2.3 Theoretical Framework
- ⋮
- 2.4 Empirical Studies
CHAPTER THREE
RESEARCH METHODOLOGY
- 3.1 Introduction
- 3.2 Research Design
- 3.3 Population of Study
- 3.4 Sampling and Sampling Technique
- 3.5 Validation of Research Instrument
- 3.6 Method of Data Collection
- 3.7 Method of Data Analysis
- 3.8 Questionnaire Administration
- 3.9 Ethical Consideration
- 3.10 Statistical Analysis
CHAPTER FOUR
DATA ANALYSIS, RESULT AND DISCUSSION
- 4.1 Introduction
- 4.2 Presentation and Analysis of Data
- 4.3 Re-statement of Research Questions
- 4.4 Test of Hypotheses
- 4.5 Discussion of Findings
CHAPTER FIVE
SUMMARY, CONCLUSION AND RECOMMENDATION
- 5.1 Introduction
- 5.2 Summary of Findings
- 5.3 Conclusion
- 5.4 Recommendation
- 5.5 Suggestion for Further Study
REFERENCES
APPENDIX A - “QUESTIONNAIRE”
Disclaimer for Complete Material Utilization
The displayed research work titled "Influence of Labour Productivity on the Cost Performance of the Traditionally Procured Projects" is stated as a research guideline towards accomplishing your assigned project / seminar research work. All the research materials on this website are ONLY for research purposes and should be used as a guideline in developing your research work. For no reason should you copy word for word as projectlist.com.ng will not be liable for any who copied the material. By ordering the complete research guideline, it signifies that you've accepted our terms of service.
Frequently Asked Questions (FAQ)
Is the topic “Microbiological Assessment of Indoor and Outdoor Air” recommended for Microbiology Project?
Yes it is highly recommended — This study was aimed at investigating the microbial load and the quality of indoor air Faith Mediplex Centre, Benin City, to ascertain their contribution to infection rate in the hospital. Air samples were assessed for three (3) months (June-August, 2015) using the settled plate methods. The study sites were divided into five (5) units; male medical ward, female medical ward, treatment room, operating theatre and outside the hospital gate. The result obtained reveal the isolation of six (6) bacterial isolates and four (4) fungal isolates which include Staphylococcus aureus, Staphylococcus epidermidis, Bacillus spp., Serrantia mercescen, Klebsiella spp., and Micrococcus spp. for the bacterial isolates, while the four (4) fungal isolates include Aspergillus niger, Aspergillus flavus, Penicillium spp.and Candida albicans. The highest …
Can this topic “Design and Construction of an Automatic Hand Dryer with Temperature Display” be used for Computer Engineering Project?
Yes it can be utilized for research — This research work deals on the design and construction of automatic hand dryer with temperature display facility which is capable of drying a wet hand placed under its vent goes of automatically. It corporate a temperature sensing and displays unit which displays the temperature of the blown out air. This system is designed in top-down methodology using passive and active components sensors (LM35 & LDR) at the input to sense temperature and hands respectively. The control unit is made up of signal conditioning unit, voltage comparator and frequency generator, and decimal counting unit. The output interface comprises transistor, driver, actuator, Electromagnetic relay and a –digit seven segment Display. The sensor are installed at the front of the blower and this …
Can the material for “Revenue Generation in Local Government Areas (Problems and Prospects)” be used as a guide for Public Administration (PA) Project?
Yes it can be used — The adverse situation in the various local government areas of Nigeria has led the researcher to go into this very topic. Hence, the purpose of this work is to enlighten people, mostly students in the school of financial studies on how revenue is generated in local governments, problems confronting them as regards revenue generation as well as prospects to the problems. However, local governments are expected to use the fund generated in embarking on income earning projects, projects, that come under fee or bill charging utilities like portable water, electricity, construction of market squares etc. However, before fund can be generated, one must make ways of getting the funds like grants given to local governments for some purposes by the federal government. …
Is the topic “Effects of Displacement on Student Performance” recommended for Education Project?
Yes it is highly recommended — The study scrutinizes the Effects of Displacement on Student Performance in Some Selected Secondary School in Balanga Local Government Area of Gombe State. In achieving this aim, the following specific objectives were laid out to study the impact of displacement of the educational and academic performance of Secondary School Students, examine the reasons for students’ poor performance in Secondary School and assess the impact of displacement and militancy on self-efficacy and motivation level of the students in Balanga Local Government Area of Gombe State. The research design used in this report is descriptive design, utilizing questionnaire method to obtain information from the respondents for this project. A total of 150 (one hundred and fifty) respondents were selected for this study …
Can the material for “Design and Implementation of a Web Based Student Complaint System” be used as a guide for Computer Science (CS) Project?
Yes it can be used — A complaint system is a software that can generally collect complaints, store them and these records are collected by the appropriate authority and then decide on the next step to be taken in solving the issues. The aim of the study is to develop a computerized complaint system to enable students submit complains or any wrong doing on the campus, to be handled by a professional administrator who will send the complaints to the appropriate body. In achieving this aim, the following specific objectives were laid out to design web based complaint registration and appeal management system and provide quick responds to students complains on campus. The motivation that led to the implementation of the proposed system is that the process …
Can the material for “Utilization of E-learning Facilities in Teaching of Office Technology and Management (OTM) Education Courses” be used as a guide for Management Technology Project?
Yes it can be used — The study was carried out to examine the Utilization of E-learning Facilities in Teaching of Office Technology and Management (OTM) Education Courses in Tertiary Institution for Effective Service Delivery. Investigation revealed that management students in Federal Polytechnic Nekede Owerri, the students are exposed only to the use of analogue typing and shorthand skill, therefore inability to keep up with the rapid pace of technology has created fear on these students. The unavailability of most of the information technologies in the office technology and management (OTM) workshops is another challenge the students are facing in this information technology era. The research design used in this report is descriptive design, utilizing questionnaire method to obtain information from the respondents for this project. …
Can this topic “Design and Implementation of an Online Library Catalog System” be used for Computer Science (CS) Project?
Yes it can be utilized for research — A Library Catalog System software package is designed especially to handle book-keeping tasks and students entry and exits period. The aim of this study is to design software that will Design and implement an Online Library Catalog System. In achieving this aim, the following specific objectives were laid out to Control the inflow and outflow of stock/materials in the library, store books using IDs assigned to each book, assist in the management and record library stocks and give account of borrowed and un borrowed books. The motivation that led to the implementation of the proposed system is as a result of poor determination books due and overdue, lack of comprehensive database for book stocked in the library and verifiable borrowed …
Is the topic “The Indispensability of Accounting System in the Control of Public Expenditure” recommended for Accountancy / Accounting Project?
Yes it is highly recommended — This project titled “the Indispensability of accounting system in the control of public expenditure (A case study of federal radio corporation of Nigeria, Enugu National Station) is seemingly an important study. this study is very essential especially in the present day where most establishment whether public or private are characterized by reports on increasing cases of fraud and misappropriation of finds. This research work aims discovering whether improper accounting system to a large extent contribute to cases of fraud and misappropriation of funds. Other cases of fraud and irregularities among government officials, would also be looked into. The research solution will help curb these anomalies in the government parastatals and these would be continued in a chapters project write up. …
Can the material for “Determination of the Phytoconstituent Essential Elements, Proximate and Antimicrobial Analysis of Scent Leaf Extract” be used as a guide for Microbiology Project?
Yes it can be used — The study was carried out to determine the phytoconstituent essential elements, proximate and antimicrobial analysis of scent leaf extract. In achieving this aim, the following specific objectives were laid out to determine the proximate composition of scent leaf extract, carry out antimicrobial analysis of scent leaf extract and carry out an elemental analysis and antimicrobial screening of the scent leaf sample. The phytochemicals screening of the leaves using Standard Methods and further analysis with HPLC revealed the presence of tannins, saponins, flavonoids, alkaloids, phlobatanins, terpenoids, steroids and cardiac glycosides. The elemental analysis was carried out using Atomic Absorption Spectrophotometer (AAS). The result revealed the presence of Na (0.311±0.049), Ca (0.138 ±0.111), Mg (1.712 ± 0.537), K (0.261± 0.077), Mn (0.457±0.107, …
Can the material for “The Political Economy of Cross Border Crimes and Socio-Economic Development of ECOWAS Member States” be used as a guide for Political Science Project?
Yes it can be used — The study was carried out to examine the Political Economy of Cross Border Crimes and Socio-Economic Development of ECOWAS Member States. In achieving this aim, the following specific objectives were laid out to identify various cross border crimes perpetuated in ECOWAS member states and appraise the effectiveness of various machineries put in ground by the government to curb cross border crimes. Investigation revealed that cross border criminal activities in West Africa straddle weak borders into specific geographical location in affected countries where state capacity to respond to the threat and challenges posed by these illegal activities is equally weak. The research design used in this report is descriptive design, utilizing questionnaire method to obtain information from the respondents for this …