Well tests exist already for a long time. Since the first oil reservoir was discovered, oil companies have always been keen on estimating reservoir properties such as size. Present day well testing has gone beyond this and its usefulness cannot be overemphasized. This project work is concerned with the use of well testing in identifying well problems. The case under study is the UMU-N2 well of Umusadege field, Kwale. From analysis of the well test data, it was seen that the well had impairment which was due to reduced permeability and thus, required stimulation for improved recovery of the hydrocarbons present. Also, there was high sand and water production which also reduced the productivity of the well.
CHAPTER ONE
1.0 Introduction
In the petroleum industry, a well test is the execution of a set of planned data acquisition activities to broaden the knowledge and understanding of hydrocarbons properties and characteristics of the underground reservoir where hydrocarbons are trapped. The overall objective is identifying the reservoir's capacity to produce hydrocarbons, such a soil, natural gas and condensate. Data gathered during the test period includes volumetric flow rate and pressure observed in the selected well. Well testing can be surface or subsurface testing and each type has its own objectives. A properly designed, executed and analyzed well test usually can provide information about formation permeability, extent of wellbore damage or stimulation, reservoir pressure, reservoir boundaries and heterogeneities etc.
Outcomes of a well test, for instance flow rate data and gas oil ratio data, may support the well allocation process for an ongoing production phase, while other data about the reservoir capabilities will support reservoir management. A well is said to have problem when its behavior deviates from the normal production pattern. Typical well problems for producing wells include low productivity, low reservoir pressure, formation damage and skin value, high viscosity oil, wellbore and tubing plugging, high gas- oil ratio etc. Hence, well testing is therefore one of the economic source of valuable information about reservoir properties such as porosity, permeability, fluid viscosity, reservoir limit, drainage volume and vertical permeability orientation etc.
1.1 Types of Well Testing
Generally,Well testing can be divided into three types which are:
- Pressure transient test
- Periodic productive test
- Deliverability test
1.1.1 Pressure Transient Test
This is a means of assessing reservoir performance by measuring flow rates and pressures under a range of flowing conditions and then applying the data to a mathematical model. During the flow period, the pressure at the formation is monitored over time. Classification of pressure transient test includes pressure drawdown test, pressure build-up test, injectivity test, inference test, fall off test etc. These tests requires higher degree of sophistication and used to determine formation damage or stimulation related to reservoir parameters such as permeability, porosity, pressure, volume etc.
1.1.2 Periodic Productive Well Test
This is a routine test carried out to physically measure oil, gas and water produced by a particular well under normal producing conditions. It helps to determine the daily production of oil, water and gas. These information serve as an aid in well and reservoir operations and also in meeting legal and regulatory requirements.
1.1.3 Deliverability Productivity Tests
This is an intensive oil and gas well test which involves the physical or empirical determination of fluid flow rate versus bottom hole pressure drawdown with a limited number of measurements in order to determine the capability of the well under various degree of pressure drawdown. This test is usually carried out on a newly completed well. Results may be used to set allowable production and in the selection of artificial lift system and production facilities. Classification of deliverability tests include Inflow performance relationship (IPR) test, flow after flow test, isochronal test, Potential test etc.
1.2 Aim and Objectives of Study
The aim of the study is to identify the Well Problems Using Well Testing. In achieving this aim, the following specific objectives were laid out as follows:
- To study the various types of well tests carried out in the oil industry and how they can be used in identifying well problems.
- To analyze well test data gotten from UMU-N2 well in order to determines its reservoir characteristics by the application of well test knowledge.
- To make conclusions on the state of the UMU-N2 well on the basis of data analysis and give possible recommendations.
1.3 Scope of the Study
The scope of this project is limited to the data of a particular well test that was carried out on UMU-N2 well which would be used for determining problems and evaluating well productivity.
1.4 Limitations of the Study
During the course of this study, there were some problems encountered which stood as limitations to the research work. Some of the limitations include:
- Time Constraint:
The time frame given to accomplish this project was very short due to school academic calendar and it was carried out under pressure which made the researcher not to implement some necessary features.
- inancial Constraint:
Insufficient fund tends to impede the efficiency of the researcher in sourcing for the relevant materials, literature or information and in the process of data collection (internet).
1.5 Methodology
Literature review of textbooks, journals, articles etc., and surfing the internet for necessary information.
Obtaining well test data of well UMU-N2 well from the company and carrying out analysis with the aid of mathematical calculations and graphical plots to evaluate the well problems.
CHAPTER TWO
2.0 Literature Review
2.1 Introduction
The review of relevant literature is the main topic of this chapter. A literature review covers theoretical and methodological contributions to a certain issue in addition to the state of knowledge at the time of writing. It provides information about the state of the art in relation to the subject you are writing about. It examines the body of work on the chosen subject. The literature evaluation in this study comprises the …
Procedure for Downloading the PDF (Docx) Material
Identification of Well Problems Using Well Testing (A Case Study of Umu-N2 Well of Midwestern Oil and Gas Company, Kwale, Nigeria) can be downloaded by requesting the full set of materials at the project or seminar cost. The document will be sent via Microsoft Word (MS-Word) format via WhatsApp (e-mail) following payment confirmation.
Seminar Material Cost ₦3,000 | Project Material Cost ₦5,000 |
Request Complete Material
![]() | Click here to request the Complete Material via WhatsApp including;
|
TABLE OF CONTENTSPRELIMINARY PAGES
- Title page
- Approval page
- Dedication
- Acknowledgement
- Table of Contents
- Abstract
- 1.0 Introduction
- 1.1 Aims and objectives
- 1.2 Scope and limitation
- 2.0 Literature review
- 2.1 Introduction
- 2.2 Division of Well Testing
- 2.3 Objectives of Well Testing (Surface Well Testing)
- 2.4 Objectives of Well Testing (Sub-surface Well Testing)
- 2.5 Other reasons for Well Testing
- 2.5.1 Legal consideration
- 2.5.2 Economic consideration
- 2.6 Classification of Well Testing
- 2.6.1 Periodic productivity test
- 2.6.2 Production or Deliverability test
- 2.6.2.1 Productivity index test
- 2.6.2.2 Inflow Performance Relationship (IPR) test
- 2.6.2.3 Flow after flow test
- 2.6.2.4 Isochronal test
- 2.6.2.5 Modified Isochronal test
- 2.6.2.6 Potential test
- 2.6.2.7 Pressure Transient test
- 2.7 Classification of Pressure Transient test
- 2.7.1 Pressure Drawdown test
- 2.7.2 Pressure Build-up test
- 2.7.3 Injectivity test
- 2.7.4 Fall-off test
- 2.7.5 Interference test
- 2.7.6 Multiple rate test
- 2.7.7 Drill Stem test
- 2.7.7.1 Drill Stem test tools and technique
- 2.7.7.2 Drill Stem testing operations
- 2.7.8 Pulse test
- 2.8 Flowing Gradient (FG) and Static Gradient (SG)
- 2.8.1 Flowing Gradient (FG)
- 2.8.2 Static Gradient (SG)
- 2.8.3 Complete BHP (Well testing) profiles
- 2.9 Basis of Well testing
- 2.9.1 Reservoir Environment
- 2.9.2 The inner boundary condition
- 2.9.3 Well bore storage
- 2.9.4 Skin effect
- 2.9.5 Induced fracture
- 2.9.6 Condition around region Two
- 2.9.7 Homogenous Reservoir
- 2.9.8 Heterogenous Reservoir
- 2.9.9 Outer boundary condition
- 2.9.10 Transient State phase
- 2.10 Reservoir boundary phase
- 2.11 Flow regimes
- 2.11.1 Steady State flow
- 2.11.2 Unsteady State flow
- 2.11.3 Pseudo Steady State flow
- 2.12 Diagnostic analysis
- 2.13 Difficulties encountered while performing well test
- 2.13.1 Periodic change of flowrateand pressure
- 2.13.2 Stabilization period
- 2.13.3 Fluid Slugging into the separator
- 2.13.4 Formation Hydrate
- 2.14 Well problems
- 2.14.1 Low productivityv2.14.2 Low reservoir permeability
- 2.14.3 Low reservoir pressure
- 2.14.4 Formation damage and skin value
- 2.14.4.1 The concept of damage zone around the wellbore
- 2.14.4.2 Skin
- 2.14.4.3 Formation damage skin
- 2.14.5 Wellbore or Tubing plugging
- 2.14.6 High viscosity oil
- 2.14.7 Excessive back pressure on formation
- 2.14.8 Inadequate Gas lift system
- 2.14.9 Gas problem in oil wells
- 2.15 Description of Terms
- 3.0 Case Study
- 3.1 Well History
- 3.2 Production data table
- 3.3 Production versus Time reading for UMU-N2 WELL
- 3.5 BHP Graph of Pws versust
- 3.6 The Graph of log p versus t
- 4.0 Analysis of Data
- 4.1 Production data analysis
- 4.2 Analysis of the BHP data
- 5.0 Conclusion and Recommendation
- 5.1 Conclusion
- 5.2 Recommendations
REFERENCES
Disclaimer for Complete Material Utilization
The displayed research work titled "Identification of Well Problems Using Well Testing" is stated as a research guideline towards accomplishing your assigned project / seminar research work. All the research materials on this website are ONLY for research purposes and should be used as a guideline in developing your research work. For no reason should you copy word for word as projectlist.com.ng will not be liable for any who copied the material. By ordering the complete research guideline, it signifies that you've accepted our terms of service.
PRELIMINARY PAGES
- Title page
- Approval page
- Dedication
- Acknowledgement
- Table of Contents
- Abstract
- 1.0 Introduction
- 1.1 Aims and objectives
- 1.2 Scope and limitation
- 2.0 Literature review
- 2.1 Introduction
- 2.2 Division of Well Testing
- 2.3 Objectives of Well Testing (Surface Well Testing)
- 2.4 Objectives of Well Testing (Sub-surface Well Testing)
- 2.5 Other reasons for Well Testing
- 2.5.1 Legal consideration
- 2.5.2 Economic consideration
- 2.6 Classification of Well Testing
- 2.6.1 Periodic productivity test
- 2.6.2 Production or Deliverability test
- 2.6.2.1 Productivity index test
- 2.6.2.2 Inflow Performance Relationship (IPR) test
- 2.6.2.3 Flow after flow test
- 2.6.2.4 Isochronal test
- 2.6.2.5 Modified Isochronal test
- 2.6.2.6 Potential test
- 2.6.2.7 Pressure Transient test
- 2.7 Classification of Pressure Transient test
- 2.7.1 Pressure Drawdown test
- 2.7.2 Pressure Build-up test
- 2.7.3 Injectivity test
- 2.7.4 Fall-off test
- 2.7.5 Interference test
- 2.7.6 Multiple rate test
- 2.7.7 Drill Stem test
- 2.7.7.1 Drill Stem test tools and technique
- 2.7.7.2 Drill Stem testing operations
- 2.7.8 Pulse test
- 2.8 Flowing Gradient (FG) and Static Gradient (SG)
- 2.8.1 Flowing Gradient (FG)
- 2.8.2 Static Gradient (SG)
- 2.8.3 Complete BHP (Well testing) profiles
- 2.9 Basis of Well testing
- 2.9.1 Reservoir Environment
- 2.9.2 The inner boundary condition
- 2.9.3 Well bore storage
- 2.9.4 Skin effect
- 2.9.5 Induced fracture
- 2.9.6 Condition around region Two
- 2.9.7 Homogenous Reservoir
- 2.9.8 Heterogenous Reservoir
- 2.9.9 Outer boundary condition
- 2.9.10 Transient State phase
- 2.10 Reservoir boundary phase
- 2.11 Flow regimes
- 2.11.1 Steady State flow
- 2.11.2 Unsteady State flow
- 2.11.3 Pseudo Steady State flow
- 2.12 Diagnostic analysis
- 2.13 Difficulties encountered while performing well test
- 2.13.1 Periodic change of flowrateand pressure
- 2.13.2 Stabilization period
- 2.13.3 Fluid Slugging into the separator
- 2.13.4 Formation Hydrate
- 2.14 Well problems
- 2.14.1 Low productivityv2.14.2 Low reservoir permeability
- 2.14.3 Low reservoir pressure
- 2.14.4 Formation damage and skin value
- 2.14.4.1 The concept of damage zone around the wellbore
- 2.14.4.2 Skin
- 2.14.4.3 Formation damage skin
- 2.14.5 Wellbore or Tubing plugging
- 2.14.6 High viscosity oil
- 2.14.7 Excessive back pressure on formation
- 2.14.8 Inadequate Gas lift system
- 2.14.9 Gas problem in oil wells
- 2.15 Description of Terms
- 3.0 Case Study
- 3.1 Well History
- 3.2 Production data table
- 3.3 Production versus Time reading for UMU-N2 WELL
- 3.5 BHP Graph of Pws versust
- 3.6 The Graph of log p versus t
- 4.0 Analysis of Data
- 4.1 Production data analysis
- 4.2 Analysis of the BHP data
- 5.0 Conclusion and Recommendation
- 5.1 Conclusion
- 5.2 Recommendations
REFERENCES
Disclaimer for Complete Material Utilization
The displayed research work titled "Identification of Well Problems Using Well Testing" is stated as a research guideline towards accomplishing your assigned project / seminar research work. All the research materials on this website are ONLY for research purposes and should be used as a guideline in developing your research work. For no reason should you copy word for word as projectlist.com.ng will not be liable for any who copied the material. By ordering the complete research guideline, it signifies that you've accepted our terms of service.
Frequently Asked Questions (FAQ)
Can the material for “Students’ Perception of the Role of School Counselors in the Choice of a Career” be used as a guide for Guidance and Counselling Project?
Yes it can be used — This research work is based on students’ perception of the role of school counselor in the choice of a career using Esan West local Government Area of Edo state. The study concentrated on the different roles counselor plays in secondary schools, perceptions of students at the junior and senior secondary levels on the role of counselors, importance of career counseling in schools as well as the need for counselors in secondary schools. The findings show that the perception of students of the role of school counselors is positive. This prove that the secondary school students in Esan West local Government Area of Edo State have positive perceptions of the role of school counselors in their choice of a career, which clearly …
Can the material for “Availability and Usage of Instructional Materials in the Teaching and Learning of Financial Accounting in Senior Secondary Schools” be used as a guide for Education Project?
Yes it can be used — This project tried to identify the availability and usage of instructional materials in the Teaching and Learning of Financial Accounting in Senior Secondary Schools. The instrument used was questionnaire for both teachers and students. An analysis of the respondents was made; of percentage method of data was used. The data review shows that instructional materials enhance the teaching and learning of Financial Accounting in Senior Secondary Schools. The finding shows that the present status and preference for the supply of teaching materials and equipments to work with is very low. On the issue of qualified teachers, it was quite glaring that many of the schools have few Financial Accounting teachers to handle Senior Secondary Schools Students in all Accounting subjects to be taught in …
Can this topic “Design and Implementation of a Computerized Card Based Security Verification Gateway System” be used for Computer Science (CS) Project?
Yes it can be utilized for research — Card Based Security Verification Gateway System has always played a vital role in the stability of a nation. The aim of the study is to design and implement a Computerized Card Based Security Verification Gateway System using Oceanic Bank as a case study. In achieving this aim, the following specific objectives were set out to compare and contrast the difference between cards based security and manual based and create information security conscious. The motivation that led to the implementation of the new Computerized Card Based Security Verification Gateway System is that, keeping security information manually in the existing system can hinder some defense program and delay passage of security information to the appropriate body and the manual documentation of security …
Can this topic “Design and Implementation of a Campus Shopping Intranet” be used for Computer Science (CS) Project?
Yes it can be utilized for research — A shop is a place where various types of goods are packed and sold. Shopping is the process of purchasing items in exchange for money. Shopping intranet simply means using a private computer network, which uses the internet protocol in managing a shopping centre in a campus. The aim of the study is to design and implement a Campus Shopping Intranet using FPNO as a case study. In achieving this aim, the following specific objectives were laid out as follows to develop an application software that will display goods and services in the store, automate every sale effectively without mixing product prizes and store product detail using a secure database. The motivation that led to the implementation of the proposed …
Is the topic “Design and Implementation of Online Shopping Website for Gentlemen Clothing” recommended for Computer Science (CS) Project?
Yes it is highly recommended — Online shopping website for gentlemen clothing is a complete multi-user website which enables consumers go through to purchase of products or services over the Internet. The system helps in buying of goods, products and services online by choosing the listed products from website (E-Commerce site). The aim of the study is to design and implement an Online Shopping Website for Gentlemen Clothing. In achieving this aim, the following specific objectives were laid out as follows to design and develop an application software that will update new products like clothing items and other related items online and enable the end-users to find trending products and make purchases for desired item. The motivation that led to the implementation of the proposed system is …
Can the material for “Effect of Qualification of Chemistry Teacher on the Performance of Secondary School Student in External Examination” be used as a guide for Chemistry Education Project?
Yes it can be used — Chemistry is an exact and a core science subject in Nigerian secondary schools. The study was carried out to investigate the Effect of Qualification of Chemistry Teacher on the Performance of Secondary School Student in External Examination using Ethiope East Local Government Area of Delta State as a case study. In achieving this aim, the following specific objectives were laid out to examine the impact of teachers’ professional qualification towards academic performance in Chemistry and evaluate teachers exposure on-the-job training towards academic performance in Chemistry. The research design used in this report is descriptive design, utilizing questionnaire method to obtain information from the respondents for this project. A total of 150 (one hundred and fifty) respondents were selected for this …
Can the material for “Evaluation of Library Resources and Services of Two Public Secondary Schools” be used as a guide for Library and Information Science (LIS) Project?
Yes it can be used — School libraries are very essential in primary and secondary education. They are established and maintained to serve and support the educational activities of the school. The study was carried out to evaluate the Library Resources and Services of Two Public Secondary Schools in Akaeze Ebonyi State. In achieving this aim, the following specific objectives were laid out to find out the extent quantity of library resources in school libraries meet professional standards, investigate the problems militating against school libraries in meeting professional standards and assess library resources for meeting secondary schools professional standards in Akaeze district of Ebonyi State. The research design used in this report is descriptive design, utilizing questionnaire method to obtain information from the respondents for this …
Is the topic “The Influence of Socio-Economic Factors of Parents on Children Access to Secondary Education” recommended for Education Project?
Yes it is highly recommended — This study examined the influence of socio-economic factors of parents on children access to secondary education. The study sought to determine the influence of parents’ income, educational level, occupation and parental involvement in education on students’ academic performance. A descriptive survey design using a sample of 158 students, 17 teachers and 11 parents’ representatives was used to execute the study. Questionnaires were used to collect information from students and teachers while interview schedule was used to collect information from parents. Quantitative data from the questionnaires was analyzed using descriptive and inferential statistics using Statistical Package of Social Science (SPSS). The qualitative data was managed through thematic techniques. Target population was parents’ representatives, teachers and students in Sabon-Gari Local Government Area of …
Is the topic “Effect of Steeping Period on Yield and Acceptability of Starch Extracted From Sorghum (Sorghum Bicolor, White Variety and Red Variety)” recommended for Microbiology Project?
Yes it is highly recommended — Starch was extracted from two varieties of sorghum bicolor grains (white and red varieties) steeped for 6, 8 and 12 hours by wet milling method, the starch samples were analysed for yield, functional properties and overall acceptability. The yield of the white variety ranged from 0.45 − 0.70kg and the red variety was 0.40 − 0.50kg. The result of their functional properties were as follows; Bulk density, white (0.700 − 0.733g/ml), red (0.723 − 0.753g/ml) Gelation temperature; white (70 − 72oc) red (73 − 74oc). Least gelation concentration; white (0.60 − 0.90g/10ml), red (0.70 − 1.00g/10ml). Metabolisable energy value, white (3.12 − 3.82kcal/g), red (3.73 − 3.82 kcal.g). Glycosidic cyanide content, white (4.5 − 8.5%), red (8.5 − 10.5%). The starchy …
Can the material for “Design and Implementation of a Customer Relationship Management System” be used as a guide for Computer Science (CS) Project?
Yes it can be used — Customer Relationship Management (CRM) is described as an approach to managing a company's engagement with current and potential customers through creating a trustworthy partnership. The aim of the study is to design and implement an Online Customer Relationship Management System. In achieving this aim, the following specific objectives were laid out as follows to develop an application software that will save time and efforts for the member of staff currently performing the task of customer details keeping, accounting and marketing manually and ensure proper management of customer details record. The motivation that led to the implementation of the proposed system is that the major problem that leads this research is poor communication approach of the company to old and new …