Effects of Preliminary Estimate on Final Account of Building Projects

EFFECTS OF PRELIMINARY ESTIMATE ON FINAL ACCOUNT OF BUILDING PROJECTS


CHAPTER ONE

1.0 Introduction

1.1 Background of the Study

Ever since the dawn of civilization, man has indulged in some form of construction activity. Even in ancient times, man created architectural Marvels which came to be regarded as wonders of the world including the pyramids of Egypt, the Great Wall of China, and the tower of Babel among others. Estimates for engineering construction and building project are extremely important for the financier. The primary function of this process is to produce a forecast of the probable cost of a proposed project before the detailed design and contract particulars are prepared (Onwusonye, 2006; Pratt, 2011).

Prospective clients require budget estimate at the early stage of the project to manage and forecast their intended financial commitment before extensive work on the design is done. A feasibility estimate is therefore an important document that helps the client in carrying out a detailed study on the viability of his proposed project with a view to determining whether the investment is worthwhile.

Estimating therefore describes the technical process of predicting the probable costs of the project based of specified information (Akintoye, 2000). The estimating process is broadly divided into two types namely: feasibility and tender estimating depending on mainly on the stage of the project and amount and quality of available information (Pott, 2008). However, the use of one approach precedes the other in the project development life cycle thereby making the context of predictive accuracy an important discourse in cost management literatures.

The feasibility estimating has gained more interest based on its level of important to the overall cost performance of the project. Feasibility estimating is there probable assessment of the probable cost of project at the early stage of the project when the design is not fully developed. However, lack of theories on construction price forecasting is a major factor that has restricted empirical progress in cost forecasting (Akintoye, 2000).

One of the major problems facing the Nigerian construction industry and in the global perspective is the fact that most projects are completed at sums higher than their initial contract sum (Achuenu, 1994; Gundiri, 1998). As a result, initial contract sum is rarely relied upon for decision making. The contract price obtained at the pre-contract stage of construction projects form the contract sum; and it is the amount established for the project. The expectations are that this sum should not be exceeded. Despite the veracity of this fact in practice and research, building construction projects are rarely completed within the estimated cost (Chindo, Okoli, Fadason and Gandu, 2012). Studies by Elinwa & Buba (1993) cited in Chindo, Okoli, Fadason and Gandu (2012) established cost variances between 8 to 133%; and an earlier study by Giwa (1988) pegged cost variability at 113% between the feasibility estimate and final cost of the project.

The research space has largely developed towards the study of variance between contract sum and final account. The trend has left a significant gap in determining the events in the procurement process between feasibility phase and contract sum. This study argues that, the contract sum is developed from a comprehensive design information than feasibility estimate; hence the need to evaluate the relationship between the later estimate and the former. This study therefore seeks to examine the effect of effect feasibility estimate of final account.


1.2 Statement of the Problem

The feasibility of construction projects as decision tool is received with optimistic expectations, first that it may never be adequate; and second, that it may never be exhausted (Tate & Flanagan, 1997). This pessimism originates the spates of project cost performance failure over the decades. Construction projects across the globe are bedeviled by cost deviation and overruns. Flyvjerg (2005) found that construction projects are completed at about 28% above budget.

Mahamid (2013) reports 16.73% cost deviation, the mean cost overrun of 7.9% is reported in Odeck (2004), and Cantarelli et al. (2012) reports cost deviation of 11%. Scarcity of world’s economic resources informs the increasing important to reconsider the controversial disposition of cost overrun. The wide infrastructure gap in many places are alarmingly high including Nigeria.

Cost differential is therefore perceived as endemic (Odeyinka, 2015) and the stakeholders in the construction sector are burdened to mitigate cost overrun. For the construction professionals to have credibility before the client, Mbachu (2012); Larkin et al.(2012); Odeyinka et al. (2012a,b)and Odeyinka (2015) suggested that as an obligation and the basis for reward, clients, contractors, financiers, and other stakeholders should carefully consider the expanding variance between feasibility and final account.

Other wide range implications of cost deviations are prominent. First the perception of the stakeholders in a project is affected (Hobbs, 2010). Project financing is difficult and possible abandonment is imminent. The most prevalent impact of cost deviation is delay and disruption. The effects and causes of delay and disruption is widely studied across geographical spread but the implications lean towards similar results (Aibinu and Jagboro, 2002; Sambasivan and Soon, 2007; and Haseebet al. (2011). These include time overrun, dispute, arbitration, total abandonment and litigations (Kikwasi, 2012). This study therefore seeks to determine the contribution of estimating to overall cost discrepancy between budget and final account.


1.3 Research Questions

The study came up with research questions so as to be able to ascertain the above stated objectives. The specific research questions for the study are stated below as follows:

  • What are the factors affecting the accuracy of feasibility estimating?
  • What are the preferred tools, level of use and level of accuracy feasible estimating?
  • What is the relationship between feasibility estimate and final account of building projects?

1.4 Aim and Objectives of the Study

The aim of the study is evaluate the effect of feasibility estimate on the final account of building projects with a view to enhance efficiency. The objectives of the study include the following to:

  1. Identify factors affecting the accuracy of feasibility estimates for building works;
  2. Evaluate stakeholders’ preference, level of use and the accuracy of feasibility estimating techniques; and
  3. Determine the effect of feasibility estimate on final account sum of building projects.

1.5 Research Hypothesis

In order to pursue the objective of this study, the following generalized statements have been designed to guide and aids in obtaining the result for the experiment to be conducted. For this work, the null hypothesis will be represented with H0 while the alternative hypothesis will be represented with hypothesis H1.

Hypothesis One

  • H0: There is no significant relationship between feasibility estimate and final account.
  • H1: There is significant relationship between feasibility estimate and final account.

1.6 Significance of the Study

This study has been necessitated by the fact that the first step towards solving a problem is to identify it. Therefore, if the idea behind the generation of feasibility estimate is well known and its effects on final account are identified and possible remedies proffered and implemented, it will reduce the anxiety being faced by clients in going into infrastructural project development due to high level of uncertainty of their financial commitment, thereby encouraging the growth of infrastructural development. It will also significantly reduce the incidences of project cost overrun.

Contractors and clients will benefit from this work since they are in no wining position when there is a fall in the level of infrastructural projects development. First, the evaluation will enhance improved project delivery and overall realisation of the project targets. Second, it will facilitate stakeholders’ assessment of their level of effort towards the realisation of projects’ set objectives across the various stages of the project. Third, the outcome will improve procurement in option used and the projects procured amidst enhanced effective assessment management of cost overruns.


1.7 Scope of the Study

There are construction industries in every state of the country; the study was restricted to construction industries and projects in Akwa Ibom State. This research has been limited by constraints such as time, money and related literature on the topic.

The limited financial resource of the researcher is a major limitation and thereby resulted in limiting the study to Akwa Ibom State only. Due to hard time, cost of research materials are high, certain materials which could be useful may not be affordable.

The reluctance of professionals/consultants to give information to research students is clearly known, it becomes hard as potential respondent will always believe that the information might expose the firm or company.


1.8 Limitations of the Study

During the course of this study, there were some problems encountered which stood as limitations to the research work. Some of the limitations include:

  1. Time Constraint:

    The time frame given to accomplish this project was very short due to school academic calendar and it was carried out under pressure which made the researcher not to implement some necessary features.

  2. Financial Constraint:

    Insufficient fund tends to impede the efficiency of the researcher in sourcing for the relevant materials, literature or information and in the process of data collection (internet, questionnaire and interview).

  3. Initial Cooperation Delay from Respondents:

    A particular limitation of this work came as a result of the respondent refusal to offer their cooperation at the initial time they were contacted. This contributed in making the success of this research study difficult.


1.9 Organization of the Study

For the information presented in a research work to be clearly understood and appreciated, a systematic and chronological presentation of the work is of greater importance. In keeping with this, this research has been organized and presented in five chapters;

Chapter One of the study, provides background of the study, stating the problem of the study and the research questions and hypotheses to be tested in the study. It also highlights the significance of the study and scope of the study.

Chapter Two reviews related literature on the Effects of Preliminary Estimate on Final Account of Building Projects.

Chapter Three; information on the method employed in the collection of data and their analysis can be found in this chapter. Also in this chapter, justification is provided for the adoption of the methods and analytical techniques employed.

Chapter Four; This involves the presentation and analyses of data findings from the testing of hypothesis are also presented here.

Chapter Five; This is the final chapter and it contains the summary of the entire work done, the conclusions down, and the recommendations made by the researcher based on the findings of the research work.

Appendices; It is usual practice that in the final pages of research work, reproductions of some document such as questionnaire relevant tables, statute, letters and so on attached for a better appreciation of the research work by the reader. This can also serve as a means of verification work done.


CHAPTER TWO

2.0 Literature Review

2.1 Introduction

The review of relevant literature is the main topic of this chapter. A literature review covers theoretical and methodological contributions to a certain issue in addition to the state of knowledge at the time of writing. It provides information about the state of the art in relation to the subject you are writing about. It examines the body of work on the chosen subject. The literature evaluation in this study comprises the …


Procedure for Downloading the PDF (Docx) Material


Effects of Preliminary Estimate on Final Account of Building Projects can be downloaded by requesting the full set of materials at the project or seminar cost. The document will be sent via Microsoft Word (MS-Word) format via WhatsApp (e-mail) following payment confirmation.


Seminar Material Cost
₦3,000
Project Material Cost
₦5,000


Request Complete Material

Complete Material Chapters of Effects of Preliminary Estimate on Final Account of Building ProjectsClick here to request the Complete Material via WhatsApp including;
  • Preliminary Pages,
  • Chapter 1-5,
  • References and Appendix.



TABLE OF CONTENTS

PRELIMINARY PAGES


CHAPTER ONE

INTRODUCTION


    • 1.0 Introduction
    • 1.1 Background …

    CHAPTER TWO

    LITERATURE REVIEW

    • 2.1 Introduction
    • 2.2 Conceptual Review
    • 2.3 Theoretical Framework
    • 2.4 Empirical Studies
    • 2.5 Research Gaps
    • 2.6 Summary of Literature Review

    CHAPTER THREE

    RESEARCH METHODOLOGY

    • 3.1 Introduction
    • 3.2 Research Design
    • 3.3 Population of Study
    • 3.4 Sampling and Sampling Technique
    • 3.5 Validation of Research Instrument
    • 3.6 Method of Data Collection
    • 3.7 Method of Data Analysis
    • 3.8 Questionnaire Administration
    • 3.9 Ethical Consideration
    • 3.10 Statistical Analysis

    CHAPTER FOUR

    DATA ANALYSIS, RESULT AND DISCUSSION

    • 4.1 Introduction
    • 4.2 Presentation and Analysis of Data
    • 4.3 Re-statement of Research Questions
    • 4.4 Test of Hypotheses
    • 4.5 Discussion of Findings

    CHAPTER FIVE

    SUMMARY, CONCLUSION AND RECOMMENDATION

    • 5.1 Introduction
    • 5.2 Summary of Findings
    • 5.3 Conclusion
    • 5.4 Recommendation
    • 5.5 Suggestion for Further Study

    REFERENCES

    APPENDIX A - “QUESTIONNAIRE”


    Disclaimer for Complete Material Utilization

    The displayed research work titled "Effects of Preliminary Estimate on Final Account of Building Projects" is stated as a research guideline towards accomplishing your assigned project / seminar research work. All the research materials on this website are ONLY for research purposes and should be used as a guideline in developing your research work. For no reason should you copy word for word as projectlist.com.ng will not be liable for any who copied the material. By ordering the complete research guideline, it signifies that you've accepted our terms of service.


    Frequently Asked Questions (FAQ)


    Can this topic “Design and Implementation of Mobile Application for Electronic Voting for SUG” be used for Computer Science (CS) Project?

    Yes it can be utilized for research — Electronic voting refers to the option of using electronic means to vote in referendums and elections. E-Voting is an election system that allows a voter to record his or her secure and secret ballot electronically. The inefficiency of voting process in Federal Polytechnic Nekede has resulted in a lot of problems. These problems have continued to obstruct the peace of democracy in Student Union Government (SUG) in Federal Polytechnic Nekede because the choice of a capable candidate is not encouraged by the current system. The aim of the study is to Design and Implement a Mobile Application for Electronic Voting for Student Union Government (SUG) using Federal Polytechnic Nekede as a case study. In achieving this aim, the following specific …


    Can the material for “Microbial Profile of Suya Meat” be used as a guide for Microbiology Project?

    Yes it can be used — Suya meat is produced by smoking the raw beet with the addition of some spices, salt, oil, groundnut cake and flavors, the meat is first sliced into smaller pieces and the spices are rubbed onto it, it is later oven dried or over local source of heart. This allows the meat to get dried properly with the right taste before is gold to the consumers. The study determines the Microbial Profile of Suya Meat. In achieving this aim, the following specific objectives were laid out to isolate, microbial species associated with suya meat and identify the microbial species associated with the suya meat. Ten (10) samples of suya meat in Enugu were collected randomly and analyzed microbiologically and the isolates …


    Is the topic “The Problem of Solid Waste Management in Enugu Metropolis” recommended for Estate Management (EM) Project?

    Yes it is highly recommended — This research work is aim at examining the practices and problems solid waste management with particular reference to IMT Campus III. The research choose the random sampling Technique based on the population concentration from three (3) location within the study area. The data obtained were analysed using percentage statistics method. From the analysis of data and discussion the practices in the use include open dumps and open burning which indicate poor management. To ensure proper management the researcher recommended that government should device new and appropriate strategies in solid waste management that involves on the spot separation for possible recycling, through supervision of authorities involved in the waste management and grass roof campaign to ensure strict adherence to the rules guiding waste management. …


    Can the material for “Plan Maintenance Guide for Physics Laboratory” be used as a guide for Computer Science Education Project?

    Yes it can be used — Physics Laboratory experimentation plays a critical role in the education of engineers, with the increase of students choosing to obtain their education online through Distance Learning programs, something must be done to allow them to gain practice with experimental techniques. The aim of the study is to design and implement a plan maintenance guide for Physics Laboratory. In achieving this aim, the following specific objectives were laid out to design and develop a system that will: provide information for Physics Laboratory Maintenance, provide experimental foundation for theoretical concepts taught in class, enable Students to be able to identify equipment, their function and explain & predict observable phenomena taught in related lectures, and assess the competence with lab equipment and measuring …


    Can the material for “An Appraisal of Neo-Classical Theory of Organisation” be used as a guide for Human Resource Management (HRM) Project?

    Yes it can be used — The research profers an appraisal of neo-classical theory of organization.The neoclassical theory was an attempt at incorporating the behavioral sciences into management thought in order to solve the problems caused by classical theory practices. The premise of this inclusion was based on the idea that the role of management is to use employees to get things done in organizations. Rather than focus on production, structures, or technology, the neoclassical theory was concerned with the employee. Neoclassical theorists concentrated on answering questions related to the best way to motivate, structure, and support employees within the organization. Studies during this time, including the popular Hawthorne Studies, revealed that social factors, such as employee relationships, were an important factor for managers to consider. It …


    Can this topic “Employees Performance Appraisal as a Strategy to Management” be used for Business Administration and Management (BAM) Project?

    Yes it can be utilized for research — This research work discussed the management function, which is used in achieving desired results through efficiency utilization of human and material resources. It is intended to be problem solved and revealing the management and subordinates as well. I have organized this work in chapters to enable full discussion in each area selected. This first chapter deals with the introduction general background to the subject matter, problem associated with the subject matter, problems that the study will be concerned with, the importance of studying the area, definitions of important terms and references. This chapter reveals the reasons of the research work to enable the reader to know the area of coverage. The second chapter is concerned with the literature review, the origin of the …


    Can this topic “Oha Mmuo Masquerade Festival and Promotion of Peace and Unity in Ihiala Anambra State” be used for Fine Arts Project?

    Yes it can be utilized for research — This study was carried out to assess the masquerade of Afiolu festival in Ihiala LGA of Anambra state. The study revealed that Anambra state has a lot of tourism attractions that are innumerable because the state has twenty-one local government areas with over two hundred towns but emphasis was laid on the Afolu festival in Ihiala LGA. The aim of the study is to assess the Oha Mmuo Masquerade Festival and Promotion of Peace and Unity in Ihiala Anambra State. In achieving this aim, the following specific objectives were laid out to identify to what extent the role of masquerade in afiolu festival influence Ihiala people, find out the extent those activities that feature in the festival affect Ihiala people, …


    Is the topic “An Assessment of Vulnerability and Socio Economic Effects of Insecurity in Musawa and Matazu L.G.A. of Kastina State” recommended for Criminology and Security Studies Project?

    Yes it is highly recommended — The study assesses the Vulnerability and Socio Economic Effects of Insecurity in Musawa and Matazu L.G.A. of Kastina State. In achieving this aim, the following specific objectives were laid out to appraise the nature of insecurity in Musawa and Matazu L.G.A. of Kastina State, determine the causes of Socio Economic insecurity in Musawa and Matazu L.G.A. of Kastina State, determine the effect of Socio Economic insecurity on national development in Nigeria, and determine measures to mitigate and eliminate Socio Economic insecurity in Musawa and Matazu L.G.A. of Kastina State. The research design used in this report is descriptive design, utilizing questionnaire method to obtain information from the respondents for this project. Primary data were collected from the primary source which …


    Can the material for “Impact of Health Promotion on Malaria Prevention During Early Pregnancy” be used as a guide for Nursing (Science) Project?

    Yes it can be used — The study was carried out to examine the Impact of Health Promotion on Malaria Prevention during Early Pregnancy. In achieving this aim, the following specific objectives were laid out to identify the measures utilized by women of reproductive age in preventing malaria during pregnancy and assess the level of health promotion on malaria preventive measures among pregnant women attending antenatal clinic. The research design used in this report is descriptive design, utilizing questionnaire method to obtain information from the respondents for this project. A total of 100 (one hundred) respondents were selected for this study to represent the entire population of the study. For null hypotheses were formulated and tested using the one-way ANOVA and the t-test statistical tools at …


    Can the material for “Design and Implementation of a Regional Weather Forecasting System” be used as a guide for Computer Science (CS) Project?

    Yes it can be used — Weather forecasting is the application of science and technology to predict the state of the atmosphere for a given location. Human beings have attempted to predict the weather informally for millennia, and formally since the nineteenth century. Weather forecasts are made by collecting quantitative data about the current state of the atmosphere and using scientific understanding of atmospheric processes to project how the atmosphere will evolve. The aim of this research project is to implement a weather forecasting system through the method of persistence which will be used to collect data about weather conditions about specific locations rather that large geographical zones. …



    Chat with us on WhatsApp