ABSTRACT

This research work traces the impact of Effective Material Management in Building Construction Site and a case study of Imo State of Nigeria as it obtainable in other developed parts of the country. This is very crucial, more so when materials gulp about 60% of the estimated cost of any given project. The introduction part to the research estimated basic definitions for management of materials and effective projects delivery respectively to put them into proper perspectives. On the other hand, the literature review discussed the following sub-heads of the term of reference: Sourcing of materials and requisition, Transportation and handling, Receiving and storage of materials on site, Issuing of materials for use and Quality inspection and control. Also of structural questions (questionnaire) and personal interview which are primary sources of data collection, even secondary sources such as dictionaries, professional journals, text book etc.

In the process of this study, the research based this study on construction firms and data analysis was by a single percentage technique to arrive at the findings. This study after discussing the above points finally concluded by giving a number of recommendations aimed at achieving efficient and effective material management flow in the building construction industry. It is hoped that this work will be useful to existing and incoming construction firm and all those engaged in the construction industry in one way or the other.


CHAPTER ONE

1.0 Introduction

Material as the general term is used to connote raw materials, spare parts and components, consumable stores, packeting materials, subassemblies etc. use to produce a good or services. For many manufacturing firms, materials account for more than half (1/2) of the production cost. As production activity becomes more highly automated, materials proportion of the project cost tends to increase. On the other hand, for a services outfit, the proportion of materials cost is lower.

The use of these materials and their control involves cost and could influence profit. Therefore, their efficient management is vital to avoid delays through storage, acquisition of goods unfit for their intended purpose, or serious expenditure and erosion of profit which is the basis for material management. With this integrated approach to material management, all jobs encompassed by these activities would be under the overall direction of a material manager whose responsibility is to manage the procurement and delivery of material for company use.

Material resources are the heart and life wire of any construction industry. This is because the production and distribution activities as well as the general overall performances of any construction organization will be shaky in the case of under stocking or poor management of material. Such materials are the gravel, sand and other aggregates which are found in building construction site. This materials if there not properly manage will lead to poor extension of building work.

1.1 Background Of The Study

With the past (2) decades, a lot of laudable government programmes in Nigeria aim at the provision of physical infrastructure including private development schemes have remain largely unrealized. It is usually during the implementation (construction period) that most project fail in their goals forward realization.

The moment a building project has been conceptualized and design, the implementation of the design is usually the next phase. It is during this phase of implementation that a lot of vital decisions would have to be made which can either lead to the successful completion of the project on schedule or hinder it.

This phase puts into rest the managerial skills and ability of the project team in successfully executing of any building project, care must be taken to achieve the client's requirements of early completion of works on schedules at an economic cost keeping the quality of job high.

The clients requirements listed above are inextricable linked together and are affected by the same factors. For instance an elongated project period would lead to increased building cost, which is completed undesirable. This is because machinery and labour would be employed for longer number of days than earlier budgeted for.

Unnecessary and frequent suspension of work on site due to the non-availability of building materials must be guarded against if building projects are to be successfully executed on schedules. Improper handling, storage and lack of adequate security for the building materials that result in damage and theft also contribute to the non-completion of project on time. Other reasons that leads to the non-completion of building construction work on schedule are :

  1. The inability/refusal of the construction team to meet the labour requirement in the use of the building materials with a view of maximizing the use of time. This particular attitude of contractors tends from their yearning for increased profit margin. And thereby reducing the number and quality of materials rendered.
  2. Frequent accidents occurring on site as a result of loose safety guidance in the construction industry also attributes to the non-completion of project due to ineffective material management on building construction site.
  3. Bad management of human resources also hinder the early completion of project on schedules. This is manifested in the lack of attention being paid to staff involved in the handling these building materials and the frequent hiring and firing of personnel. Lack of motivation and incentives also constitute a problem to the smooth flow of building operations.

With an effective material management system would go a long way in addressing these problems. Other factors which may not necessary elongate the project period but lead to increase in building costs are as follows:

  1. The choice of building materials to be purchased with respect to strength, durability, and recycling.
  2. The estimation of the exert quantity of building materials to be purchased for a work section is dicey issue and can easily lead to wastage and increased building cost. Because buying these material in little bits can lead to increased in overall cost and also buying excessive quantities that can also lead to wastage.
  3. The provision of competent supervisor can help check building cost as wastage; theft and non-adherence to specification are avoided, thus ensuring quality control.

An effective material management system cannot be evolve without basing it on an overall work programme. One of the basic rules of management is that no project is likely to be successful unless the objectives are adequately defined and the necessary allocation made to labour and materials.

This rule is no less true when applied to the economy of a country. It is imperative for the government to decide which object are to be met within its program — choosing between a number of conflicting and overlapping social needs and laying down the proportion of the nations resources that is to be devoted to each.

According to Hersey and Blandard (2003) Management is “working with and through individual to accomplished organizational goal”.

Bladdle and Evander (2000) defining management in terms of the purpose also stated that “it is the efficient and effective use of resources to achieve objectives and achieving results with and through people”.

A common trend that appears in the definition is the manager's concerns for accomplishing organizational goals and objectives. It can therefore be said that the achievement of organizational objectives through leadership in management.

Armed with the better understanding of management concepts, the production of the building can be approached bearing in mind the importance of the effective material management to the entire building project. To achieve this, objective must be clearly define, which within the construction industry is usually aimed at the completion of the project on schedules at the lowest possible price, keeping the quality of building work standard as specified.

The planning and control of all building materials resources for the realization of the building project is of vital important. Before commencement of work on site, ample time should be allowed for planning, while thought must be given to the way in which the building operation will be organized. Only by proper planning can aids to productivity, such as mechanical plant, incentives and efficient use of labour and materials becomes fully effective.


1.2 Statement Of Problem

Material manager have the most basic job of focusing the efforts of their subordinates on the objectives of the organization or enterprise. In the area of material management, this boil down to supplying materials at lowest possible total cost. To achieve this, the long and short term effect of the manager's actions will have to be considered.

This research will look on how to solve the problem of effective material management such as follows:

  1. Reduce the cost of materials
  2. Bring the inventory in line with demand on site and thereby reduced over investment.
  3. Increase productivity to a maximum, so as to enhance profitability.
  4. Make certain that finished product's were ready to satisfy customers order on due time.
  5. Reduced wastage and reduce obsolesce to minimum.
  6. Enhance the company corporate image at all times.

1.3 Aims And Objectives

Bearing in mind the possibility of an elongated construction period with the implication of increased building cost. There is need for the effective management of material resources necessary for the realization of a building project. The planning, organizing and controlling of material such as building materials is of extreme important to the timely and successful completion of the building project.

This research project shall therefore seek to elucidate the importance of effective material management on a building project site with a view to ensuring the completion of project on schedule, improving the quality of jobs executed and checking building cost.

The specific objectives include the following:

  1. To evaluate the impacts of material management in our construction industries.
  2. To determine the strategies currently in use in construction industries to manage materials effectively.
  3. To determine the strategies currently in use in project delivery.
  4. To identify the problems encounter by the construction industry in the implementation of the material management measures.
  5. To recommend alternative solution base on the research findings.

1.9 Scope And Limitation

The scope of this research project is to critically examine: The principles of management in construction.

The evolution of an effective material management system through the following:

  1. The choice of building material to be purchased with respect to strength, durability, recycling etc.
  2. The timing of purchases to ensure the early arrival of building materials on site
  3. The transportation of building materials on site.
  4. The storage of building materials on site.
  5. The security of the building materials on or off site
  6. The handling of building materials

The researcher's intention to cover the impact of effective material management in building construction site in Imo State. And some of the construction industries visited are OK 2000, Zerock construction and AIM Consultant by the researcher and it sample size will be about ninety (90), also the number of variables to be examined will be close to twenty.


Limitations of Study

This study was supposed to cover all aspects of site management but inevitable constraints that besiege every human endeavor compelled this research to be limited to the importance of effective material management on a building project site. This research is also restricted building project alone. Significant among these constraints were:

Poor Finance: Lack of sufficient money for transportation and extensive exploration of libraries of other institutions of higher learning made this work deficient in rich literature

Insufficient Time: The specific time for completion and subsequent submission of this work made it difficult to be as thorough as it should be.


1.10 Justification / Significance Of The Study

This research would help curtail the incessant effective material in building construction site. The research work will also foster more important way of achieving work through planning and control of all materials resources necessary for the realization of the building project as a vital importance. And the reduction of wastage and reduce obsolesce to minimum. Finally it will enhance the company corporate image at all time due to their material management and project profitability.


1.11 Definition Of Terms

Material Management: It is referred to as the process by wish an organization is supplied with goods of services that it needs to achieve it objectives.

Structural Element: In this research work, structural work elements are refers as those element or parts of a particular building. Such elements are the roof member, walls, structural framing, beams, slabs, stairs and foundation.

Purchase Requisition: This is other words that refers to a situation where a company notifies the purchasing department on materials requirements

Requisition Form: This is forms that are use during purchase requisition. Its states the departments, dates, date ordered, supplier, ordered number, items, quality, quantity, description, whom to deliver to and signature.

Contract: It may be defined as an agreement between two parties which is intended by them to have legal consequences.

Client: It is the owner, instigator, initiator, promoter, employer and financier on capital project.

Contractor: He is a person who undertakes to complete a job in accordance with the contract document.

Construction Industry: It is generally regarded as a collection of client professionals and contractors who team up in making architectural and engineering designs and specifications and transforming them into real structures with same kind of technology expertise.


1.12 Research Question

In order to successfully carryout this research work to its logical conclusion, the following research questions must be addressed;

  • What are the impacts of effective material management as regards to building construction site or project in Imo State?
  • What are the strategies in use for building project as regards to effective management of materials on construction site?
  • To what extent have these measures succeeded in improving the management of material in construction site?
  • What are the problems encountered by the construction industry in the implementation of material management?

CHAPTER TWO

2.0 Literature Review

2.1 Introduction

The review of relevant literature is the main topic of this chapter. A literature review covers theoretical and methodological contributions to a certain issue in addition to the state of knowledge at the time of writing. It provides information about the state of the art in relation to the subject you are writing about. It examines the body of work on the chosen subject. The literature evaluation in this study comprises the …


Procedure for Downloading the PDF (Docx) Material


Effective Material Management in Building Construction Site (A Case Study of Imo State) can be downloaded by requesting the full set of materials at the project or seminar cost. The document will be sent via Microsoft Word (MS-Word) format via WhatsApp (e-mail) following payment confirmation.


Seminar Material Cost
₦3,000
Project Material Cost
₦5,000




TABLE OF CONTENTS

PRELIMINARY PAGES


CHAPTER ONE

  • 1.0 Introduction
  • 1.1 Background of the study
  • 1.2 Statement of problem
  • 1.4 Aims and objectives
  • 1.5 Scope and limitation
  • 1.6 Justification/significance of the study
  • 1.7 Definition of terms
  • 1.8 Research question

CHAPTER TWO

  • 2.0 Literature review
  • 2.1 Sourcing of material and requisitioned
  • 2.2 Materials schedule for the contract on hand
  • 2.2.1 Typical material schedule format
  • 2.3 The bill of materials
  • 2.4 The purchase requisition
  • 2.5 Transportation and handling
  • 2.6 Local transportation
  • 2.7 Receiving and storing of material on site
  • 2.8 Issuing of materials for use
  • 2.9 Use of materials on site
  • 2.10 Quality inspection

CHAPTER THREE

  • 3.0 Research methodology
  • 3.1 Source of data
  • 3.2 Simple plan
  • 3.3 Description of data techniques

CHAPTER FOUR

  • 4.0 The presentation and analysis of data
  • 4.1 Analysis and interpretation of data

CHAPTER FIVE

  • 5.0 Recommendations
  • 5.1 Conclusion

BIBLIOGRAPHY

Questionnaire

Reference


Disclaimer for Complete Material Utilization

The displayed research work titled "Effective Material Management in Building Construction Site" is stated as a research guideline towards accomplishing your assigned project / seminar research work. All the research materials on this website are ONLY for research purposes and should be used as a guideline in developing your research work. For no reason should you copy word for word as projectlist.com.ng will not be liable for any who copied the material. By ordering the complete research guideline, it signifies that you've accepted our terms of service.


Frequently Asked Questions (FAQ)


Can this topic “Debt Management Issues in Financial Institutions” be used for Insurance Project?

Yes it can be utilized for research — This work is to carryout research on debt recovery techniques in the banking sector issues, problems and prospects (A study of Union Bank of Nigeria plc). This research will expose how non-distressed banks bring effective resolution to a distressed bank because of the effective means of recovering the debts. And if there is any loss in one bank, it leads to a loss of confidence in the entire banking system. This research will state the aim at finding solution to the debt and general causes of financial distress in banking sector, and looking into finding last solution. This research work will find out whether banks take loan policy into consideration when granting loans to customers. It will determine the causes …


Can the material for “Credit Management in the Banking Sector and Economic Growth of Nigeria” be used as a guide for Banking and Finance (BF) Project?

Yes it can be used — In Nigeria, the banking sector is an important part of the financial system, the banking sector dominate the Nigeria financial system as it accounts for about 90% of the total assets in the system. This study is carried out to examine credit management in the banking industry and economic growth in Nigeria. Statistical Package for Social Science (SPSS) and Analysis of Variance (ANOVA) were applied to validate the result spanning across 2000-2013. The study relies on purely secondary data. Lending is one of the major functions of bank though most risky any bank that wants to remain in business must lend. The study finds that bank loan and advances accounts for about 98.2% contribution on economic growth for the period under …


Can this topic “Students Conceptions of Three Dimensional” be used for Education Project?

Yes it can be utilized for research — The study was conducted to identify students? levels of conceptions of three-dimensional (3-D) organic molecular structures in Chemistry, in senior secondary schools (SS III) in Agbani education zone of Enugu State. Three research questions and two null hypotheses guided the study. Descriptive survey research design was employed for the study. The population for the study was 660 students comprising of 341 males and 319 females. Multi-stage sampling techniques were used to sample 310 respondents. The instrument for data collection was a diagnostic test to identify students? levels of conceptions (DTISLC) in 3-D organic molecular structures. To ensure the validity of the instruments, the instruments were face validated by two expert from Chemistry Education and two experts from Measurement and Evaluation, all …


Can the material for “An Assessment of the Study of Microphone” be used as a guide for Microbiology Project?

Yes it can be used — The microphones and the speakers are very common audio equipment. The work of a microphone and a speaker are opposite of each other. The motivation that led to the study is as a result of Poor access to network, Inability to comply a release of factual materials to facilitate the work, and delay in granting material and components which could have a deed finding. The aim of the study is to assess the Study of Microphone. In achieving this aim, the following specific objectives were laid out to Define microphone and explain the functioning and working of microphones, Identify and explain the different types of microphones, and categorize the microphones based on their polar patterns. Data used in this work …


Is the topic “Sonographic Evaluation of the Liver in Pregnant Women” recommended for Public Health Project?

Yes it is highly recommended — The variations in the sizes of the various organs during pregnancy is well known with various organs of the body increasing in size throughout pregnancy and returning to their pre-pregnant state during the pueperium. The purpose of this research was to investigate on the ultrasonographic evaluation of the liver in pregnant women at the Agbor General Hospital. The study was a cross-sectional survey of pregnant women with data obtained from the Agbor General Hospital. We investigated a total of one hundred and fifty (150) subjects and the result was analyzed with the aid of the Statistical Package for Social Science version 20.0. Ethical clearance was obtained from the Research and Ethics Committee of Human Anatomy Department in Delta State, University, Abraka. …


Can the material for “The Effect of Company Income Tax on Nigerian Economy” be used as a guide for Accountancy / Accounting Project?

Yes it can be used — This study investigated the impact of company income tax revenue on economic growth in Nigeria. This study used secondary data which was subjected to econometric analysis. The study made use of the judgmental sampling technique. The Central Bank of Nigeria (CBN) and Federal Inland Revenue Service (FIRS) have been chosen for the purpose of this study. The study employs the Ordinary Least Square Regression Technique in the analysis of the secondary data obtained from the Central Bank of Nigeria statistical Bulletin Using Eviews. The result of the regression analysis reveals company income tax was statistically significant at 5% level of significance using F-statistics and other statistical parameter. The study concludes that company income tax has significant impact on economic growth and living standard …


Can the material for “Gender Politics in Nigeria” be used as a guide for Political Science Project?

Yes it can be used — Despite the advances towards recognition of women’s political, economic and social interaction with men during the 21st century, there is a continuing lack of women policy-makers in Nigeria. Women are largely absent from positions in the local, national and international institutions that govern our daily lives. This observation is that women tend to be discriminated against when it comes to participation in political activities or decision-making processes. Women’s continuing absence from key positions in the political, economic and social institutions is not only disappointing but also nauseating. This problem seems to be acute in Akwa Ibom State, our area of investigation and also in Nigeria in general. This work investigates in-depth female gender and political participation and their involvement in …


Can the material for “Antifungal Activity of Ginger Extract Against Fungi Pathogen” be used as a guide for Microbiology Project?

Yes it can be used — The study was carried out to identify and determine the antifungal activity of ginger extract against some fungi pathogen. The diseases which are born by food are gradually becoming a dangerous risk to public health. Ginger is a medicinal plant that has been widely used all over the world, since antiquity, for a wide array of unrelated ailments including arthritis, rheumatism, sprains, sore throats, muscular aches, pains, constipation, vomiting, hypertension, indigestion, fever and infectious disease. The study reveals the following problems associated with the antifungal activity of ginger extract against some fungi pathogen; lack proper investigation of the inhibition of pathogenic Fungi in ginger oil extract, inadequate information relating to the anti-fungal adverse effect of the ginger oil extract, and …


Can the material for “Effect of Sprouting on the Proximate Composition and Thickening Properties of Ede Ocha and Ede Ofe Cocoyam” be used as a guide for Food Science and Technology (FT) Project?

Yes it can be used — The study was conducted to evaluate the effect of sprouting on the proximate composition and thickening (functional) properties of two varieties of cocoyam “ede ocha” (Xanthosoma sagittifolium) and “ede ofe” (Colocasia esculenta). The two varieties were processed using standard methods and the nutritional and thickening properties analyzed. The result obtained was further subjected to statistical analysis (standard deviation and ANOVA). The result of the analysis revealed that in “ede ocha”, sprouting significantly (p<0.05) decreased moisture content (from 23.51- 11.77%), fibre (2.2- 1.85%), protein (12.01- 7.85) and bulk density (0.59 – 0.53 %) while it significantly (p<0.05) increased ash (1.78- 2.08%), fat (0.91- 0.98%), CHO (59.6-75%), WAC (1.96- 2.91%) and OAC (1.61- 1.86%). Whereas, in “ede ofe”, sprouting significantly (p<0.05) decreased …


Can the material for “Design and Construction of Double Clap Switch” be used as a guide for Electrical / Electronics Engineering (EE) Project?

Yes it can be used — The Double Clap Switch primary purpose of switch is to provide means for connecting two or more terminals in order to permit the flow of current across them, so as to allow for interaction between electrical components, and to easily isolate circuits so as to terminate this communication flow when need be. The aim of the study is to Design and Construct a Double Clap Switch. In achieving this aim, the following specific objectives were laid out to construct device will be able to switch on and off using double clap signals, eliminate the stress in walking from end to end, or room to room of a building to switch devices ON/OFF, provide a remote switching helps to safe guard …



Chat with us on WhatsApp