This project research is examine the effective direction of a proposed four bedroom senior quarters with facilities, the building identifies the various processes and stages that are involved and the stage of planning and execution which involves viability and feasibility study, including soil and site analysis, step plan and architectural working drawing, writing of construction programmed, and taking off, the use of the above documents in respect with its processes of actualization analysis inclusive the processes of planning and controlling with the construction site.
CHAPTER ONE
1.1 Introduction
The design and construction of a 4-bed room senior staff quarter with facilities, this could be referred to as a building of any senior staff could stay. According to the description oxford dictionary it stated that a 4-bed room is where senior staff stays for their safety and be comfortable for the work. A 4-bedroomm must possess facilities and services which will make the staff safe and comfortable at any given time. Such facilities and service include plumbing services, electricity, carriage, dining, bedrooms, kitchen, lobby, store, good pipe born water, water close, bathroom, varrandar and electrical; appliances such as fan, portable size refrigerator, television and so on.
These facilities and services must always be in good working order so as to prevent an uncomfortable environment to the user. The objectives and uses of staff room with facilities include the following:
- To provides security, comfort and good working environment to staffs and visitors
- To provides health and social facilities to the staff.
- To provides opportunity for communal working team spirit and good interpersonal relationship.
1.2 Feasibility Study of Site
Before one begins to design and construct a building, one should carefully consider the implications of its proposed context, the building site. In federal polytechnic Nekede Owerri located at umuerim Nekede. It was found out that it has a good environment and site conditions which will be suitable for construction, habitation and for learning purposes. The site is located in a well site and healthy environment. The soil test carried out on the site using trial holes was found to be sandy-loamy soil which geological faults, poor clay soil undulating ground was not in existence. It was also found that there is no existence of overhead and underground service such as electricity, water service pipe and so on. Around and within the site so, in the construction of 4-bed room senior staff with facilities require, must be provided, in order to make the building conducive for the staffs.
Also good site and investigation of soil conditions and environment will enhance continuation of construction without any obstruction or malpractices on site. It will also increase consistency of work and eliminate unnecessary in the lost of production of the building, hence enabling the contractor to be aware of the exact operation to be carried out during construction
1.3 Factors for the Choice of Site
The choice of building site could be influence by a number of factors namely:
- Geographical factors.
- Climatic factors
- Economical factors
- Political factors
- Social-cultural factors
- Accessibility factors
- Environmental factors
1.3.1 Geographical Factor
This includes soil type, topography and vegetation. The bearing capacity of the soil ascertain from the soil type. The type of foundation to be adopted for any given structure is determined by the soil bearing capacity. The soil type will also indicate the case of drainage both for surface and ground water. The choice of machinery to be deployed to the site for clearing, excavations, will also be influenced by the soil type. Certain soils are so weak that building on them, without ad equates preparation creates adverse consequences. Topography which refers to land forms and ground slope will indicate the foundation type. The building form and the site drainage, site climate / wind, temperature, solar radiation) will affect the construction. The vegetation of an area will dictate the type of plant to be hired in the site.
1.3.2 Climatic Factor
This includes sun, wind precipitation and temperature. This climatic factor influence positioning of the building, it can influenced the construction activities. The investigation we carry out proved that the sun usually rises from the east and the temperature, wind and pressure on the site is moderate. Therefore, positioning the building, the front elevation should not be at the east.
1.3.3 Economical Factor
The cost of acquiring land in the urban areas is more expensive compared to the rural area. The economic turnover in both area vary. Building in the urban areas attracts more rentage than in the rural areas thus; the initial cost of land acquisition influences the choice of building site the cost of acquiring land can affect the client choice of building site
1.3.4 Political Factor
The land use degree 1975 vest constitutional ownership of all land in the state on the state government. The government has the right to allocate or revoke allocation of land for development of people, organization, government agencies etc. Layout has also been created in the urban areas for given or stipulated development, residential, commercial, Industrial etc. This land can e used to compensate political friends and victims of political enemies, it mean that people may be deprived of their intended site due to political inclination.
1.3.5 Socio-Cultural Factor
The land tenure system and the traditional made of inherent influence some choice of building site during our investigation, we find out that the customs and believe of Federal Polytechnic Nekede staff is quite encouraging and their law is not against the project.
1.3.6 Accessibility factor
These include the noise level; of an area and surrounding environment. Through the investigation, the environment of Federal Polytechnic Nekede is very quite Okay. All the factors that influence the choice of building site were taken care of.
CHAPTER TWO
2.0 Literature Review
2.1 Introduction
The review of relevant literature is the main topic of this chapter. A literature review covers theoretical and methodological contributions to a certain issue in addition to the state of knowledge at the time of writing. It provides information about the state of the art in relation to the subject you are writing about. It examines the body of work on the chosen subject. The literature evaluation in this study comprises the …
Procedure for Downloading the PDF (Docx) Material
Design and Construction of a Four Bedroom Senior Staff Quarters with Facilities can be downloaded by requesting the full set of materials at the project or seminar cost. The document will be sent via Microsoft Word (MS-Word) format via WhatsApp (e-mail) following payment confirmation.
Seminar Material Cost ₦3,000 | Project Material Cost ₦5,000 |
Request Complete Material
Click here to request the Complete Material via WhatsApp including;
|
TABLE OF CONTENTSPRELIMINARY PAGES
- Title page
- Approval page
- Dedication
- Acknowledgement
- Table of Contents
- Abstract
INTRODUCTION
- 1.1 Introduction
- 1.2 Feasibility Study of Site
- 1.3 Factors for the Choice of Site
- 1.3.1 Geographical Factor
- 1.3.2 Climatic Factor
- 1.3.3 Economical Factor
- 1.3.4 Political Factor
- 1.3.5 Socio-Cultural Factor
- 1.4.6 Accessibility factor
LITERATURE REVIEW
- 2.1 Introduction
- 2.2 Transportation of Materials
- 2.3 Storage of Materials
- 2.4 Foundation Fittings
RESEARCH METHODOLOGY
- 3.1 Methodology
- 3.2 Preliminary Involved on Site/ Construction Processes of a Four – Bedroom of Senior Staff Quarters
- 3.2.1 Investigation and Exploration
- 3.2.2 Foundation Type
- 3.2.3 Access Road
- 3.2.4 Fencing and Hoarding
- 3.2.5 Plant and Equipment in Construction
- 3.2.6 Labour
- 3.2.7 Water Supply
- 3.2.8 Materials
- 3.2.9 Electrical Supply
- 3.2.10 Transportation
- 3.2.11 Food and Cateries Facilities
- 3.2.12 Storage of Materials
- 3.2.13 Construction Process of the Main Building
- 3.2.14 Sub-Structure
- 3.2.15 Site Clearance and Leveling of Site
- 3.2.16 Excavation of Over-site
- 3.2.17 Setting out of the Building
- 3.2.18 Excavation of Foundation Trenches and Surface Treatment
- 3.2.19 Excavation of Foundation Trenches and Base
- 3.2.20 Earthwork Support and Treatment
- 3.2.21 Batching
- 3.3.22 Foundation Concrete
- 3.2.23 Mixing
- 3.2.24 Transportation
- 3.2.25 Placing
- 3.2.26 Wetting
- 3.2.27 Curing
- 3.2.28 Block Work Up To D.P.C
- 3.2.29 Back Filling of Selected Excavated Material
- 3.2.30 Laterite Filling
- 3.2.31 Hardcore Filling
- 3.2.32 Formwork to Oversite Concrete
- 3.2.32.1 Super Structure
- 3.2.32.2 Erection of Super Structural Walls and Partition
- 3.2.32.3 Formwork
- 3.2.32.5 Concrete Lintel
- 3.2.32.6 Scaffolding
- 3.2.32.7 Block Work on Lintels
- 3.2.32.8 Roofing
- 3.2.32.9 Ceiling
- 3.2.32.10 Fixing of Door and Window Frame
- 3.2.32.11 Electrical Installation
- 3.2.32.12 Plumbing And Fitting Work
- 3.2.32.13 Plastering and Rendering
- 3.2.32.13 Procedures for Plastering
- 3.2.32.14 Dressing
- 3.2.32.16 Glazing
- 3.2.32.17 Plumbing Services
- 3.2.32.18 Internal Plumbing
- 3.2.32.19 External Plumbing
- 3.2.32.20 Types of Sewage Plants
- 3.2.32.21 Functions of Sewage Plan or System
- 3.2.32.23 Principles in Planning Drainage System
- 3.2.32.23 Floor Finishing and Filling
- 3.2.32.24 Wall Tilling
- 3.2.32.25 Painting and Decoration
- 3.2.32.26 Priming Coat
- 3.2.32.26 Under Coat
- 3.2.32.27 Finishing Coat
- 3.2.32.28 Testing
- 3.2.32.29 Cleaning Up Site
- 3.2.32.30 Handing Over
- 3.3 Specification of Materials and Workmanship
- 3.3.1 Gravel (Coarse Aggregate)
- 3.3.2 Water
- 3.3.3 Consistency of Concrete
- 3.3.4 Concrete Mixing
- 3.3.5 Transporting Concrete
- 3.3.6 Concrete Placing
- 3.3.7 Concrete Protection
- 3.3.8 Hard Core and Filing
- 3.3.9 Formwork
- 3.3.10 Reinforcement
- 3.3.11 Brick Work/ Block Work
- 3.3.11.1 Mix Proportion
- 3.3.11.2 Curing
- 3.3.11.3 Strength
- 3.3.11.5 Workmanship
- 3.3.12 Cement Storage
- 3.3.13 Roofing (Corrugated Roofing Sheet)
- 3.3.14 Hollow Clay Blocks
- 3.3.15 Sandcrete
- 3.3.16 Excavation and Earthwork
- 3.3.17 Inspection and Excavation
- 3.3.18 Cement
- 3.3.19 Delivery on Site
- 3.3.20 Backfiling
- 3.3.21 Carpentry
- 3.3.22 Joinery
- 3.3.23 Timber Construction
- 3.3.24 Plywood
- 3.2.25 Preservative Treatment
- 3.3.26 Framing
- 3.3.27 Fixing
- 3.3.28 Door Frames
- 3.3.29 Fabrication
- 3.3.30 Iron Mongery
- 3.3.31 Tile, Slab or Block Finishing
- 3.3.32 Tile Paving
- 3.3.33 Wall Tilling
- 3.3.34 Terrazzo Paving
- 3.3.35 Granolithic Paving
- 3.3.36 Carborandum Finish
- 3.3.37 Skirtings
- 3.4 Work Programme
- 3.4.1 Calculation Input of Work Programme
RESULTS AND DISCUSSION
- 4.1 Bill of quantities
CONCLUSION AND RECOMMENDATION
- 5.1 Conclusion
- 5.2 Recommendation
Reference
Disclaimer for Complete Material Utilization
The displayed research work titled "Design and Construction of a Four Bedroom Senior Staff Quarters with Facilities" is stated as a research guideline towards accomplishing your assigned project / seminar research work. All the research materials on this website are ONLY for research purposes and should be used as a guideline in developing your research work. For no reason should you copy word for word as projectlist.com.ng will not be liable for any who copied the material. By ordering the complete research guideline, it signifies that you've accepted our terms of service.
PRELIMINARY PAGES
- Title page
- Approval page
- Dedication
- Acknowledgement
- Table of Contents
- Abstract
INTRODUCTION
- 1.1 Introduction
- 1.2 Feasibility Study of Site
- 1.3 Factors for the Choice of Site
- 1.3.1 Geographical Factor
- 1.3.2 Climatic Factor
- 1.3.3 Economical Factor
- 1.3.4 Political Factor
- 1.3.5 Socio-Cultural Factor
- 1.4.6 Accessibility factor
LITERATURE REVIEW
- 2.1 Introduction
- 2.2 Transportation of Materials
- 2.3 Storage of Materials
- 2.4 Foundation Fittings
RESEARCH METHODOLOGY
- 3.1 Methodology
- 3.2 Preliminary Involved on Site/ Construction Processes of a Four – Bedroom of Senior Staff Quarters
- 3.2.1 Investigation and Exploration
- 3.2.2 Foundation Type
- 3.2.3 Access Road
- 3.2.4 Fencing and Hoarding
- 3.2.5 Plant and Equipment in Construction
- 3.2.6 Labour
- 3.2.7 Water Supply
- 3.2.8 Materials
- 3.2.9 Electrical Supply
- 3.2.10 Transportation
- 3.2.11 Food and Cateries Facilities
- 3.2.12 Storage of Materials
- 3.2.13 Construction Process of the Main Building
- 3.2.14 Sub-Structure
- 3.2.15 Site Clearance and Leveling of Site
- 3.2.16 Excavation of Over-site
- 3.2.17 Setting out of the Building
- 3.2.18 Excavation of Foundation Trenches and Surface Treatment
- 3.2.19 Excavation of Foundation Trenches and Base
- 3.2.20 Earthwork Support and Treatment
- 3.2.21 Batching
- 3.3.22 Foundation Concrete
- 3.2.23 Mixing
- 3.2.24 Transportation
- 3.2.25 Placing
- 3.2.26 Wetting
- 3.2.27 Curing
- 3.2.28 Block Work Up To D.P.C
- 3.2.29 Back Filling of Selected Excavated Material
- 3.2.30 Laterite Filling
- 3.2.31 Hardcore Filling
- 3.2.32 Formwork to Oversite Concrete
- 3.2.32.1 Super Structure
- 3.2.32.2 Erection of Super Structural Walls and Partition
- 3.2.32.3 Formwork
- 3.2.32.5 Concrete Lintel
- 3.2.32.6 Scaffolding
- 3.2.32.7 Block Work on Lintels
- 3.2.32.8 Roofing
- 3.2.32.9 Ceiling
- 3.2.32.10 Fixing of Door and Window Frame
- 3.2.32.11 Electrical Installation
- 3.2.32.12 Plumbing And Fitting Work
- 3.2.32.13 Plastering and Rendering
- 3.2.32.13 Procedures for Plastering
- 3.2.32.14 Dressing
- 3.2.32.16 Glazing
- 3.2.32.17 Plumbing Services
- 3.2.32.18 Internal Plumbing
- 3.2.32.19 External Plumbing
- 3.2.32.20 Types of Sewage Plants
- 3.2.32.21 Functions of Sewage Plan or System
- 3.2.32.23 Principles in Planning Drainage System
- 3.2.32.23 Floor Finishing and Filling
- 3.2.32.24 Wall Tilling
- 3.2.32.25 Painting and Decoration
- 3.2.32.26 Priming Coat
- 3.2.32.26 Under Coat
- 3.2.32.27 Finishing Coat
- 3.2.32.28 Testing
- 3.2.32.29 Cleaning Up Site
- 3.2.32.30 Handing Over
- 3.3 Specification of Materials and Workmanship
- 3.3.1 Gravel (Coarse Aggregate)
- 3.3.2 Water
- 3.3.3 Consistency of Concrete
- 3.3.4 Concrete Mixing
- 3.3.5 Transporting Concrete
- 3.3.6 Concrete Placing
- 3.3.7 Concrete Protection
- 3.3.8 Hard Core and Filing
- 3.3.9 Formwork
- 3.3.10 Reinforcement
- 3.3.11 Brick Work/ Block Work
- 3.3.11.1 Mix Proportion
- 3.3.11.2 Curing
- 3.3.11.3 Strength
- 3.3.11.5 Workmanship
- 3.3.12 Cement Storage
- 3.3.13 Roofing (Corrugated Roofing Sheet)
- 3.3.14 Hollow Clay Blocks
- 3.3.15 Sandcrete
- 3.3.16 Excavation and Earthwork
- 3.3.17 Inspection and Excavation
- 3.3.18 Cement
- 3.3.19 Delivery on Site
- 3.3.20 Backfiling
- 3.3.21 Carpentry
- 3.3.22 Joinery
- 3.3.23 Timber Construction
- 3.3.24 Plywood
- 3.2.25 Preservative Treatment
- 3.3.26 Framing
- 3.3.27 Fixing
- 3.3.28 Door Frames
- 3.3.29 Fabrication
- 3.3.30 Iron Mongery
- 3.3.31 Tile, Slab or Block Finishing
- 3.3.32 Tile Paving
- 3.3.33 Wall Tilling
- 3.3.34 Terrazzo Paving
- 3.3.35 Granolithic Paving
- 3.3.36 Carborandum Finish
- 3.3.37 Skirtings
- 3.4 Work Programme
- 3.4.1 Calculation Input of Work Programme
RESULTS AND DISCUSSION
- 4.1 Bill of quantities
CONCLUSION AND RECOMMENDATION
- 5.1 Conclusion
- 5.2 Recommendation
Reference
Disclaimer for Complete Material Utilization
The displayed research work titled "Design and Construction of a Four Bedroom Senior Staff Quarters with Facilities" is stated as a research guideline towards accomplishing your assigned project / seminar research work. All the research materials on this website are ONLY for research purposes and should be used as a guideline in developing your research work. For no reason should you copy word for word as projectlist.com.ng will not be liable for any who copied the material. By ordering the complete research guideline, it signifies that you've accepted our terms of service.
Frequently Asked Questions (FAQ)
Can the material for “Compensation Management as a Tool for Improving Organisational Performance in the Public Sector” be used as a guide for Public Administration (PA) Project?
Yes it can be used — The growing emphasis on employee engagement as critical to organizational performance means that the concept of total reward is exerting more and influence on reward strategy. Reward management however, is concerned with the formulation and implementation of strategies and policies that aim to reward people fairly, equitably and consistently in accordance with their value to the organization. This study attempted to examine compensation management as a tool for improving organizational performance in public sector. Relevant literatures were reviewed to highlight the subject matter. State Internal Revenue Service [LIRS] was chosen as the case study. Selected representative comprising of staff and management of LIRS formed the sample size examined. A sample of one hundred (100) was drawn from the population. Simple Random Sampling …
Can the material for “The Impact of Construction Industry in the Development of Nigeria” be used as a guide for Building Technology (BT) Project?
Yes it can be used — The construction industry is a driver of growth in other sectors due to its heavy reliance on an extended and varied supply chain. All other sectors of the economy like manufacturing, agriculture, entertainment, transportation, education, health and sports depend on construction industry as well as the construction industry relying on them for performance. The study was carried out to examine the Impact of Construction Industry in the Development of Cross River State Nigeria. In achieving this aim, the following specific objectives were laid out to establish the relationship between construction industry and socio-economic development of Nigeria and examine the factors affecting the use of incentive schemes on building sites in the study area. Investigation revealed that the construction industry in …
Can the material for “Alternative Police System in Nigeria: A Predictive Framework” be used as a guide for Criminology and Security Studies Project?
Yes it can be used — Police System allows police personnel to plan effectively for emergency response, determine mitigation priorities, analyze historical events, and predict future events. The study is to examine the predictive framework for combating crime and conflict management alternative police system in Nigeria. In achieving this aim, the following specific objectives were laid out to examine the alternative police system contribution towards national security and investigate the factors affecting predictive framework for combating crime and conflict management in police system. The research design used in this report is descriptive design, utilizing questionnaire method to obtain information from the respondents for this project. A total of 200 (two hundred) respondents were selected for this study to represent the entire population of the study. For …
Can the material for “An Appraisal of Communication as a Tool for Resolving Conflict in the Banking Industry” be used as a guide for Banking and Finance (BF) Project?
Yes it can be used — This study is a research work to assess an appraisal of communication as a tool of resolving conflict in banking industry. It was motivated by the desire to use, understand more closely the significant of communication as a tools of resolving conflicts. In carrying out this research work, five objectives was outlined, survey method of research was used. A questionnaire was designed and administered. The two hypothesis generated was properly analyzed using the chi-square, tables and percentage. The population was 100 and the sample size was 80. In my findings, it was discovered that many communications failed because of sender tries to convey everything that she or he knows about the subject which a message contains too much information, it is …
Is the topic “The Causes of Bank-Runs on Banking Institutions and Its Impacts on Management Operations” recommended for Banking and Finance (BF) Project?
Yes it is highly recommended — Acknowledging that bank-run is one of the most dangerous thing to happen to a bank as banks in our society continuously face such problems as a result, at times leads to a fall of the bank, causing problems for the government to control the monetary policy of the economy and also loss of confidence and trust in the country’s banking system. The main objective of this study was to find out the extent to which insolvency can lead to bank-run. The research was also to find out the effect of loss of customer’s confidence on the bank and the effect of rumors from the general public on the bank. Considering the problem, some suggestions were provided in chapter six. The work …
Can the material for “Information Technology and Corporate Performance in Banking Industry” be used as a guide for Accounting Technology Project?
Yes it can be used — This research work tried to investigate the Information Technology and Corporate Performance in Banking Industry. One important question, which often confronts an ideal organization, is how to impact Information Technology control system, deal with and lead people in achieving organizational goals, aims and objectives. Therefore, the ability to use Information Technology and Corporate Performance and lend is vital to managerial success. It also helps in anticipating future requirement, think strategically about their company’s position and impact of changing conditions. The objective of this study intend to Analyze, Examine, Appraise, determine and identify the importance of Information Technology and Corporate Performance in Banking Industry. Tine methodology involves the techniques and procedures in designing the research activities and the determination of the population required, …
Can this topic “Sino-african Relations and Development” be used for International Relations Project?
Yes it can be utilized for research — Sino-African relations refer to the historical, political, economic, military, cultural connection between mainland Nigeria and the African continent, and social, in which the Nigerian Railway Corporation (NRC) remains a government-owned entity with the largest asset-base in terms of landed property. The relationship between Africa and Nigeria has assumed a matter of significant interest for scholars, policy makers and the global development community in general. Investigation reveals the following problem of the existing Sino-African relations and development (a case study of railway transport) research work; the railway institution suffered casualty in greater part of post-colonial administrations, in Nigeria as a result of longstanding neglect, though efforts are on to revamp the Nigerian railway system, issues of uneven rail network-spread, minority groups’ …
Can this topic “Design and Implementation of a Computerized Students ID-Card Processing System” be used for Computer Science (CS) Project?
Yes it can be utilized for research — Student identification card processing system is an application software packaged with all of the components needed to be up-and-running and printing Identification Cards within a stipulated period of time. The aim of the study is to design and develop a Computerized Students Id-card Processing System. In achieving this aim, the following specific objectives were laid out to examine the recent procedures employed in IMT Enugu with regards to ID-card processing, design a system with the capability of providing a wait-and-take processed ID-card and design an ID-card processing system that ensures timely processing. The methodology adopted in this study is the object oriented analysis and design methodology (OOADM) which is a technical approach for analyzing and designing an application or system …
Can this topic “Development of Promotion of Cultural Tourism as a Panacea to Economic Sustability in Ekiti State” be used for Tourism and Hospitality Management Project?
Yes it can be utilized for research — The study investigates the Development of Promotion of Cultural Tourism as a Panacea to Economic Suitability. In achieving this aim, the following specific objectives were set out to determine the relationship between cultural tourism and economic sustainability, explore the weakness and challenges of cultural tourism within the Egungun Festival in Ikole Ekiti and evaluate the Egungun Festival weaving industry in Ikole Ekiti. The research design used in this report is descriptive design, utilizing questionnaire method to obtain information from the respondents for this project. A total of 200 (two hundred) respondents were selected for this study to represent the entire population of the study. Primary data were collected from the primary source which questionnaire was used as an instrument of …
Can the material for “Africa’s Reaction Towards Globalization” be used as a guide for Political Science Project?
Yes it can be used — Theoretical postulations on the benefits of globalization are quite contradictory. In the light of prevailing conditions in Africa, it is obvious that something is quite wrong with the arrangement of the world economic system. Thus simple fact is that Africa remains a dwarf compared to other continents resulting from the unjust economic woes it is experiencing from these imbalances. This work attempts to analyse and create a link between globalization and economic development (general development) drawing from the experiences of the various regions of the world. The research work notes that globalization is multidimensional, encompassing all facts of human endeavour and this fact has made the world economy to growth tremendously in the twentieth century and Africa has not realized much …