CONSTRUCTION OF VENTURIMETER


ABSTRACT

The project was on the construction of a venturimeter. Venturimeter being a measuring instruction was used in determining the flow rate of fluid down a pipe or the rate of discharge in a pipeline and is often fixed permanently at different sections of the piple line to know the discharge there.

The research was made possible by the consultation of the internet, textbooks, and relevant information from friends. The construction was based on these dimensions.

  1. Throat diameter — 2.5cm
  2. Thickness of metal sheet — 0.2cm
  3. Length of diverging — 28.6m
  4. Length of converging 24.cm.

The main purpose of this study was to respond to both the reality and preciption of venturimeter, also the scope and the uses are reviewed such as, how it works, it important and uses.

During the construction of these venturimeter machines like the drilling machines, smothering machines, were used in carrying out major operations of how drilling and smoothing enhanced the work with less time spent in operation like this.

Also manual tools and equipment such as the hack, saw, hand file, meter rule and maters was found to consume more time and back precious to the job.


CHAPTER ONE

1.0 Introduction

1.1 Background of Study

A venturi meter or venturi flow meter is a device used to measure the velocity, or flow rate, of fluid flowing through a pipeline. The venturi meter constricts the flow using a Herschel venturi tube. As the liquid flows through the pipeline, the device measures the pressure of liquid before it enters the venturi tube and as it exist the constricted area. These measurements are then compared to figure the volumetric flow rate of the fluid. The flow meter is commonly used in plumbing applications to determine the flow of fluids such as water, liquid propane, and oil.

For this procedure the venturi tube is typically a long pipe with conically shaped entry and exist points. The entry point is usually a thirty degree cone which constricts to five degree cone at the exit. The venturi meter result is less degradation of the head pressure due to the tube's design.

The venturi mater can accurately measure flow rate using Bernoulli's principle. bernoulli stated that the velocity of liquid increases in direct proportion to a decrease in pressure. When the liquid is forced through a constricted pipeline, it begins to make at a higher rate of speed because the majority of the pressure is held behind the constriction.

A common example of Bernoulli's principle in action can be found in the nozzle of a garden hose. As the nozzle is turned fully open, the water glows slowly and usually falls just a short distance from the nozzle. When the nozzle is turned towards the closed position, it restricts the flow of the water and increases its velocity. The pressure held behind the nozzle builds and the velocity can carry the water for great distances.

The venturi meter precisely calculates the volumetric flow rate of a fluid using a complete formula. this computation considers the radius of the pipeline, whether or not the measured liquid is compressible, and the total volume of fluid present. Various coefficient are added to compensate for the viscosity of the fluid, changes in the conical angles of the venturi and other variables. When these numbers are calculated, along with the pressure measurements taken by the venturi meter, an accurate description of the liquid flow rate can be ascertained.

Historically

In some years past, the measurement of the amount of fluids which flows through pipes was very difficult, simply because, there was past, it was discovered that most of air industrial process or operations require fluid and the quantity of these fluids needed to be known for effective operations and to minimize issue. This stimulated the scientists to go into a research work, which led to the discovery of these metering devices or instrument. Lenode de Vin was the first scientist to discover ‘Orifice meter' in the year 1452 — 1519, during his study of hydraulics of water flow in channels and he decided to use the orifice meter in his research. He also observed that the meter was good for the study of fluid. He also noticed that the introduction of an orifice meter into a pipeline is necessary as this causes a change in the kinetic of the fluid.

Furthermore, still in the field of hydraulic experiment, a scientists called “VENTURI” after 7000 AD discovered a venturi meter. Also, before the beginning of the 20th century, a scientist called “HAREHEL DEUTSHER” discovered the flow nozzle in their various studies of hydraulics.

However, flow meters used for measurement has become a device with the advent of the industrial age because of the need for controlled flow process, accounting methods and more efficiently in operation and also because of the realization that controls flow rate is simple and convenient method to other process variable such as temperature and pressure. But in this project write up, more emphasis will be placed on the working principles of the venturi meter, the advantage and disadvantage and finally it uses.


1.2 Aims / Objectives of the Study

The objective of this study to applying basic knowledge of fluid mechanism chemical engineering design and how to construct venturi flow meter.


1.3 Scope of the Study

The scope of this project is to produce detail and distinctive format of construction of venturi flow meter.


1.4 Significance of the Study

The significance of this project is mainly concerned with the construction and design of venturi flow meter when producing a venturi meter.


1.5 Method of Research

Construction of venturimeter was born out of several workshops, seminars and information from advanced textbook,internet that is related to the flow of a venturimeter and its constructional elements.


CHAPTER TWO

2.0 Literature Review

2.1 Introduction

The review of relevant literature is the main topic of this chapter. A literature review covers theoretical and methodological contributions to a certain issue in addition to the state of knowledge at the time of writing. It provides information about the state of the art in relation to the subject you are writing about. It examines the body of work on the chosen subject. The literature evaluation in this study comprises the …


Procedure for Downloading the PDF (Docx) Material


Construction of Venturimeter can be downloaded by requesting the full set of materials at the project or seminar cost. The document will be sent via Microsoft Word (MS-Word) format via WhatsApp (e-mail) following payment confirmation.


Seminar Material Cost
₦3,000
Project Material Cost
₦5,000


Request Complete Material

Complete Material Chapters of Construction of VenturimeterClick here to request the Complete Material via WhatsApp including;
  • Preliminary Pages,
  • Chapter 1-5,
  • References and Appendix.



TABLE OF CONTENTS

PRELIMINARY PAGES


CHAPTER ONE

  • Introduction
  • 1.1 Background of the study
  • 1.2 Objective of the study
  • 1.3 Scope of the study
  • 1.4 Method of Research
  • 1.5 Significance of the study

CHAPTER TWO

  • 2.0 Literature Review
  • 2.1 Theory of venturi meter
  • 2.2 The characteristics of venturi meter
  • 2.3 Types of venturi meter
  • 2.4 Advantages of venturi meter
  • 2.5 Disadvantages of venturi meter
  • 2.6 The uses of venturi meter

CHAPTER THREE

  • 3.0 Construction Method

CHAPTER FOUR

  • Discussion
  • Recommendations
  • Conclusion

REFERENCES

  • Numencletures
  • APPENDIX


    Disclaimer for Complete Material Utilization

    The displayed research work titled "Construction of Venturimeter" is stated as a research guideline towards accomplishing your assigned project / seminar research work. All the research materials on this website are ONLY for research purposes and should be used as a guideline in developing your research work. For no reason should you copy word for word as projectlist.com.ng will not be liable for any who copied the material. By ordering the complete research guideline, it signifies that you've accepted our terms of service.


    Frequently Asked Questions (FAQ)


    Can the material for “A Study of Job Stress Among Secondary School Teachers” be used as a guide for Education Project?

    Yes it can be used — This paper take a look at the study of job stress among secondary school teachers in Tambuwal Local Government Area of Sokoto State. One hundred and five (105) teachers in five secondary schools were randomly selected using simple sampling techniques. A 15-item questionnaire was drawn in line with the four research questions raised for the study. Data were collected using a research-made questionnaire titled Job Stress and Teachers Effectiveness Questionnaire (JSTEQ). Collected data were analyzed through the use of table and percentage. Findings revealed that most of the teachers find teaching job stressful and students misbehavior also contributed to teachers’ stress. Subsequently, it is recommended that government and authority concerned should reduce with urgency all identified stressors in schools for …


    Can the material for “Factors Influencing the Attitude of Women Towards Family Planning in Nigeria” be used as a guide for Physical and Health Education Project?

    Yes it can be used — Family planning is the process of controlling the number of children wanted in a marriage using contraceptive method, often known as birth control measure. The study determines the Factors influencing the attitude of women towards family planning in Nigeria. In achieving this aim, the following specific objectives were laid out to examine the role and attitude of women in family planning, find out reasons poor application of contraceptive method in the area of study and Proffer solution or recommendation that will further improve on the existing use of contraceptive method and to further open the eyes of the male folk in full participation in family planning. Depreciating standard of living, inadequate facilities due to increase in population demands are also …


    Can the material for “Design and Implementation of a Computerized Mathematics Teacher” be used as a guide for Computer Science (CS) Project?

    Yes it can be used — Computerized Mathematics Teacher is the process of capturing, developing, sharing, and effectively using organizational, it refers to a multi-disciplinary approach to achieving organizational objectives by making the best use of knowledge in mathematics. The aim of the study is to develop a Computerized Mathematics Teacher using algebraic learning as a case study. In achieving this aim, the following specific objectives were set out as follows to develop a software that will: facilitate quick response to students complaints or challenges is guarantee, enable the students or staff link to various instant massages platform of Computerized Mathematics Teacher Systems, assist the students or staff make better contribution, and facilitate instant feedback to students with challenges of Algebra in Mathematics. The motivation for …


    Can the material for “An Empirical Determination of Labour Output for Painting in the Nigerian Construction Industry” be used as a guide for Quantity Surveying (QS) Project?

    Yes it can be used — Research has shown that construction labour output is crucial to the success of construction projects. However, existing labour output used for the preparation of construction estimates in Nigeria are outputs derived from untested experiences. The focus of this study is to use the work study approach to empirically establish labour output for painting activities for the Nigeria construction industry using the classification in the BESMM3 as a guide. The procedure adopted field survey involving work measurement to observe and measure operatives output. Data were collected from on-going construction works and analysed using descriptive and regression analysis. The analysis carried out established general average output value per day as follows; painting of general surfaces of walls, girth greater than 300mm with (textured …


    Is the topic “Causes of Low Productivity by Public Service Workers” recommended for Public Administration (PA) Project?

    Yes it is highly recommended — This research project is a very crucial study for the national electric power authority (nepa). The study was motivated by the necessity to establish the causes of low productivity by public service workers, to solve the research problem, both primary and secondary data were collected. The research instrument used in collecting the data were questionnaires and oral interview. Other forms of data collection were also used, such as personal observation and consultation of relevant texts. The conclusion of the study revealed that factors like breakdown of machine …


    Can the material for “Influence of Child Abuse on the Academic Performance of Secondary School Students” be used as a guide for Guidance and Counselling Project?

    Yes it can be used — This project work focuses on the effects of child abuse on students’ academic performance. The study attempts to unravel the causes, effects and remedies to child abuse among secondary school students in Lagos State. It was carried out in Bariga Local Government Area of Lagos State. A sample of 100 was randomly drawn from selected secondary schools in the local government and questionnaires were administered to the respondents. The mean percentage test, which was adopted in the study’s analysis, indicated that excessive battering of a child by parents/teacher/guidance; broken homes, child hawking before and after school and unconducive learning environment are all causes of child abuse. Also, it was found that child abuse negatively affects child’s school performance; such abused children …


    Can the material for “COI P4C a Solid Base for Sustainable Democracy in Nigeria” be used as a guide for Political Science Project?

    Yes it can be used — Nigeria has grown old enough to be faced with the challenge of the option of either to rise to the challenge of building a new society, a new civilization, or to slide into chaos of interethnic suspicion and rivalry. The task of rebuilding does not however take place in a vacuum. It requires an understandable approach of what we call Democracy. Thanks today for synergy system of leadership that parents and citizenry with range of alternative to make up for lost ground. To keep abreast with current happenings in this world and the world outside him. So for us as a people to be political and democratically up-to date, we must embrace COIP4C as a functional educational paradigm that will …


    Can the material for “Arsenic Pollution of the Subsurface Water” be used as a guide for Geology Project?

    Yes it can be used — Study on arsenic pollution was conducted in Onitsha town in Anambra State, Nigeria to examine the pollution status of surface and subsurface water. Arsenic concentration in surface water within Onitsha metropolis ranged from 0.2001 mg/L (River Niger upstream) to 1.5883 mg/L (River Niger central drainage surface), while concentration in boreholes lies within the range of 0.0000 mg/L (22.2% of boreholes) and 1.2507 mg/L (creek road), respectively. Arsenic concentration in sampled water from river sources is above the WHO standard (0.01 mg/ L) while 87.8% of Arsenic concentration in boreholes adjacent and closest to these rivers and creek is also above the world Health Organization standard (WHO, 2011) of mg/L. it is discovered that pollution of surface water is greater than that …


    Can the material for “Design and Implementation of Computerized Information Extraction System” be used as a guide for Computer Science (CS) Project?

    Yes it can be used — Information extraction is the task of automatically extracting structured information such as entities, relationships between entities, and attributes describing entities from unstructured or semi-structured machine-readable documents. The motivation that led to this study, is that the existing system encounters an uninformative extraction, which occurs when extractions omit critical information. The aim of the study is to design and develop an Automated Information Extraction System. In achieving this aim, the following specific objectives were laid out to design and develop an application system that will: carry out the analysis of manual processes involved in Information Extraction System, extract accurate information according to the data inputted and Implement the design using Web Based programming languages such as; HTML, CSS, JAVASCRIPT, and PHP. …


    Can this topic “Design and Implementation of Financial Tracking System for a Health Organisation” be used for Computer Science (CS) Project?

    Yes it can be utilized for research — Financial tracking is the practice of keeping track of one’s income and spending on a daily basis. The aim of the study is to design and implement a Financial Tracking System for a Health Organisation. In achieving this aim, the following specific objectives were laid out to implement a computerized platform for health organisation financial tracking and properly store and secure the financial statement, report and records of the daily expenditures on health organization. The motivation that led to the implementation of the proposed system is that there is consistent prevalence of errors in calculations arrived out on financial reports which are traceable to human mistakes and shortcoming. There is also the problem of poor handling of financial statement, report …



    Chat with us on WhatsApp