Effective communication is an essential ingredient that can help in achieving the set goal of a construction project. The study scrutinizes the Communication as a tool for Building Project Delivery. In achieving this aim, the following specific objectives were laid out to identify the problem caused by ineffective communication in the construction industry, identify the major factors that causes ineffective communication in the construction industry and identify factors affecting the accuracy of the building construction projects delivery cost estimating process. Effective communication has not been given enough attention in construction firms thereby creating many loop holes in information dissemination. As a result of this poor attitude in the industry, it is found necessary to create solution to such problems through this research as to improve productivity in construction firms. The research design used in this report is descriptive design, utilizing questionnaire method to obtain information from the respondents for this project. A total of 50 (fifty) respondents were selected for this study to represent the entire population of the study. Primary data were collected from the primary source which questionnaire was used as an instrument of data collection while secondary data were sources from textbooks, journals, newspapers and the internet were employed. The data were presented on a frequency distribution table and analyzed using simple percentage, while hypothesis was tested using chi-square test. The beneficiaries of this research work are, the contractors the clients who are placed in position not to bear the burden of risk inherent in variation and fluctuations, that is, increase in costs which most often than not cumulate to time and costs overruns. These on the long run lead to abandonment of building projects. This study will be of immense benefit to other researchers who intend to know more on this study and can also be used by non-researchers to build more on their research work.


CHAPTER ONE

1.1 Introduction

Effective communication is an essential ingredient that can help in achieving the set goal of a construction project. Craig (2001) defined communication as the process of sharing ideas, thoughts and feelings with target set of person or group of persons and having those ideas, thoughts and feelings understood by them. In other word, communication could be regarded as transfer of information from a person to another. It involves the use of technical term, symbol, letters, drawings, signs, posters and words. The technical terms used should be understood by the receiver; else the essence of communication is hindered. Communication links group of members together and help to coordinate their activities.

As a prelude to other parts of this study, this chapter will discuss the background upon which this study was initiated, the statement of problems that led to this study, the Aim and Objectives of the study. Others are Significance of the study, Scope of work, Research hypothesis and questions, Limitations of the Study and Definition of technical terms.


1.2 Background of Study

Construction is the world's largest and most challenging industry. The industry is highly a dynamic sector and plays a very important role in the development of a country. However, construction industry, faces chronic problems such as poor productivity, poor performance of time and cost etc, as reported only 37.2% of projects were completed within their predetermined cost. This was as a result of lack of investigation on construction labour productivity and cost performance.

The traditional contract theory has ensured that a contract should contain the agreement that would deal specifically with all expected incident which may or may not occur in the future in the course of managing the execution of the building project. If the parties to the contract intend therefore to contend and contain all agreement for uncertain situation in one simple document “the contract”, the contract document would likely become extremely complex. This is why the construction contract is regarded as “incomplete” contracts which do not provide specific responses for all contingencies but is based on the rule of “risk sharing”.

Oresegun (2012) defined communication as transfer of knowledge which could be downward, horizontal or upward. Prasad and Tata (2000) posited that communication strengthens connection between employees, build cooperation, reinforce interdependency and help in having common focus when adequately harnessed by a manager. Communication is a linking mechanism between different organisation sub-systems and also an inter-construction and intra-undermined in goal-driven organisation like construction industry.

Considering the above definition of communication, it is observed that everybody in an organization is responsible for communication irrespective of the role of the person being the originator or the receiver of the information. In all aspects of human professions, communication is seen as a vital central organ especially through the use of language. Humans have transferred culture, record history and document occurrences to a good deal with the use of language from one generation to another. The organ called communication has helped man to build societies and other social groups which has contributed immensely to the growth of man’s life 3 enjoyable. Through effective communication, the workers especially in construction firms find it easy and highly productive to work together. Instruction and order are given and they are carried out as expected once they are well understood and acted upon rightly. The working day of every personnel is filled with communication indifferent ways and forms through orders, directives, information, conversation, requests and rumors.

Therefore, in Nigeria where the research was carried out, the activities that was conducted is to know the Communication as a tool for Building Project Delivery.


1.3 Statement of Problem

Effective communication has not been given enough attention in construction firms thereby creating many loop holes in information dissemination. As a result of this poor attitude in the industry, it is found necessary to create solution to such problems through this research as to improve productivity in construction firms.

Many factors are responsible for the influence of labour productivity on cost performance in project. These factors when not put in place could bring about reduction in level of productivity and consequently affect cost performance of projects. There has been lack of investigation into labour productivity and cost performance which is probably due to the low level of awareness of the merits of such investigations. This problem has overtime denied construction works of its ideal cost and if un-attended to, it might in the nearest future overshadow the important potentials of improved labour productivity.

Another problem that has been identified is that of inconsistency in the level of labour productivity. This has subsequently affected cost of the project. It is therefore imminent for this problem to be assessed and solved so as to institutionalize a consistent standard for construction projects.


1.4 Aim and Objectives of Study

The aim of the study is to scrutinize the Communication as a tool for Building Project Delivery. In achieving this aim, the following specific objectives were laid out as follows:

  1. To identify the problem caused by ineffective communication in the construction industry.
  2. To identify the major factors that causes ineffective communication in the construction industry.
  3. To identify factors affecting the accuracy of the building construction projects delivery cost estimating process.
  4. To assess the effects of communication among the professionals on building project delivery with a view to developing models for determining the effects of communication on completion time, cost, client satisfaction, and project management.

1.5 Research Questions

The study came up with research questions so as to be able to ascertain the above stated objectives. The specific research questions for the study are stated below as follows:

  • What are the factors affecting the accuracy of the building construction projects delivery cost estimating process?
  • Is there any significant factor affecting the accuracy of the cost estimates?
  • What productivity related factors influences cost performance?
  • What is the most significant productivity factors influencing cost performance?
  • What is the relationship between building project delivery labour productivity and cost performance?

1.6 Research Hypothesis

In order to pursue the objective of this study, the following generalized statements have been designed to guide and aids in obtaining the result for the experiment to be conducted. For this work, the null hypothesis will be represented with H0 while the alternative hypothesis will be represented with hypothesis H1.

Hypothesis One

  • H0: There is no significant problem caused by ineffective communication in the construction industry.
  • H1: There is a significant problem caused by ineffective communication in the construction industry.

Hypothesis Two

  • H0: There is no relationship between estimation practice and cost performance of a building project delivery
  • H1: There is a relationship between estimation practice and cost performance of a building project delivery

1.7 Significance of Study

Construction clients, contracting organizations, specialist, consultants and suppliers, individual professional contractors, lecturers and students in the construction and allied field would find the study very useful as it will contribute to their own effort to optimize their level of involvement in construction activities. Based on the results and findings of this research work, construction stakeholders, would be able to appreciate and control the parameters involved in the productivity and cost performance concept of construction projects.

This study will be of immense benefit to other researchers who intend to know more on this study and can also be used by non-researchers to build more on their research work. This study contributes to knowledge and could serve as a guide for other study.


1.8 Scope of Study

The study focuses on the Communication as a tool for Building Project Delivery in Nigeria using Akwa Ibom State building projects as a case study.


1.9 Limitations of the Study

During the course of this study, many things militated against its completion, some of which are:

  1. Time Constraint: The time frame given to accomplish this project was very short due to school academic calendar and it was carried out under pressure which made the researcher not to implement some necessary features.
  2. Research material: availability of research material is a major setback to the scope of the study.
  3. Frequent power failure: This made the researcher append more money on fuel to ensure sustainable power.
  4. Financial Constraint: Insufficient fund tends to impede the efficiency of the researcher in sourcing for the relevant materials, literature or information and in the process of data collection (internet, questionnaire and interview).

CHAPTER TWO

2.0 Literature Review

2.1 Introduction

The review of relevant literature is the main topic of this chapter. A literature review covers theoretical and methodological contributions to a certain issue in addition to the state of knowledge at the time of writing. It provides information about the state of the art in relation to the subject you are writing about. It examines the body of work on the chosen subject. The literature evaluation in this study comprises the …


Procedure for Downloading the PDF (Docx) Material


Communication as a tool for Building Project Delivery can be downloaded by requesting the full set of materials at the project or seminar cost. The document will be sent via Microsoft Word (MS-Word) format via WhatsApp (e-mail) following payment confirmation.


Seminar Material Cost
₦3,000
Project Material Cost
₦5,000


Request Complete Material

Complete Material Chapters of Communication as a tool for Building Project DeliveryClick here to request the Complete Material via WhatsApp including;
  • Preliminary Pages,
  • Chapter 1-5,
  • References and Appendix.



TABLE OF CONTENTS

PRELIMINARY PAGES


CHAPTER ONE

INTRODUCTION

  • 1.1 Introduction
  • 1.2 Background of Study
  • 1.3 Statement of Problem
  • 1.4 Aim and Objectives of Study
  • 1.5 Research Questions
  • 1.6 Research Hypothesis
  • 1.7 Significance of Study
  • 1.8 Scope of Study
  • 1.9 Limitations of the Study

CHAPTER TWO

LITERATURE REVIEW

  • 2.1 Introduction
  • 2.2 Conceptual Review
  • 2.3 Overview of Cost Performance
  • 2.3.1 Cost Overrun
  • 2.4 Definitions Cost Estimating in Building Project Delivery
  • 2.5 Types of Cost Estimating in Building Project Delivery
  • 2.6 Theoretical Framework of Building Projects Delivery
  • 2.6.1 Estimating Process
  • 2.6.2 Cost Performance Ratio
  • 2.6.3 Risk Management during Building Project Delivery Execution
  • 2.6.4 Appropriate Contractual Framework
  • 2.7 Empirical Studies

CHAPTER THREE

RESEARCH METHODOLOGY

  • 3.1 Introduction
  • 3.2 Research Design
  • 3.3 Population of Study
  • 3.4 Sampling and Sampling Technique
  • 3.5 Validation of Research Instrument
  • 3.6 Method of Data Collection
  • 3.7 Method of Data Analysis
  • 3.8 Questionnaire
  • 3.8.1 Interview
  • 3.8.2 Key Informants Interview
  • 3.8.3 Observation
  • 3.9 Statistical Analysis

CHAPTER FOUR

DATA ANALYSIS, RESULT AND DISCUSSION

  • 4.1 Introduction
  • 4.2 Presentation and Analysis of Data
  • 4.3 Test of Hypothesis 1
  • 4.4 Test of Hypothesis 2
  • 4.5 Discussion of Findings
  • 4.5.1 Characteristics of Effective Communication
  • 4.5.2 Level of Usage of Communication Mechanisms
  • 4.5.3 Effects of Communication on Building Projects Delivery

CHAPTER FIVE

SUMMARY, CONCLUSION AND RECOMMENDATION

  • 5.1 Introduction
  • 5.2 Summary
  • 5.3 Conclusion
  • 5.4 Recommendation

REFERENCES

APPENDIX A - “QUESTIONNAIRE”


Disclaimer for Complete Material Utilization

The displayed research work titled "Communication as a tool for Building Project Delivery" is stated as a research guideline towards accomplishing your assigned project / seminar research work. All the research materials on this website are ONLY for research purposes and should be used as a guideline in developing your research work. For no reason should you copy word for word as projectlist.com.ng will not be liable for any who copied the material. By ordering the complete research guideline, it signifies that you've accepted our terms of service.


Frequently Asked Questions (FAQ)


Can the material for “Internal Auditing Efficiency as a Tool for Improving Company’s Performance” be used as a guide for Accountancy / Accounting Project?

Yes it can be used — This research adopts descriptive research design. A well-structured questionnaire was used in collected data with simple random sampling technique. Forty (40) staff of the study were sampled and questionnaires administered to them. Twenty Eight (28) questionnaires were returned and Twelve (12) were not returned. The data collected were analyzed with basic descriptive statistics such as frequency and simple percentages. The core findings from the results obtained show that the internal auditing efficiency in achieving the company’s performance are effective. It also shows that the internal auditing tool in determining the ills and weak points of the company’s performance is efficient. It was recommended that there should be relative independence of the internal auditor. …


Can this topic “Advertising as a Strategic Instrument in the Marketing of Communication Service” be used for Marketing and Advertising Project?

Yes it can be utilized for research — Advertising is any paid form of non-personal presentation and promotion of ideas, goods and services through mass media such as newspapers, magazines, television or radio by an identified sponsor. The study was carried out to examine the Advertising as a Strategic Instrument in the Marketing of Communication Service using MTN Communication Centre Enugu State as a case study. In achieving this aim, the following specific objectives were laid out to evaluate the public perception and attitude towards MTN products advertisements, evaluate the impact of advertising in the sale of MTN products and recommend ways to increase sale through advertising. The research design used in this report is descriptive design, utilizing questionnaire method to obtain information from the respondents for this …


Can the material for “Assessment of Student's Coding Skills for Self-employment in Computer Science Education” be used as a guide for Computer Education Project?

Yes it can be used — The study was carried out to assess the Student's Coding Skills for Self-employment in Computer Science Education. The population of the study comprises a sample of a total of 100 computer science education students in both Federal and State universities in Anambra State. Three research questions guided the study. The instrument for data collection was a structured questionnaire which was made up of a five (5) point rating scale was used in the data analysis. A mean of 3.0 and above was adopted as a cut of mark for the acceptance of items. The data collected was analyzed using mean and standard deviation. The result of the analysis shows that the students in computer science education lack the necessary programming …


Can the material for “Teachers Perception of Supervisors and Roles in Primary Schools” be used as a guide for Education Project?

Yes it can be used — This study investigated ?Teachers? Perception of Supervisors? Roles in Primary Schools in Minna Education Zone, Niger State.? Six research questions answered using Mean and SD and three null hypotheses tested at 0.05 level of significance using t-test statistic and ANOVA guided the study. Population of the study was 8,087 primary school teachers in the 764 public primary schools in the zone. The sample was 404 teachers drawn though multi-stage sampling technique. The study adopted descriptive survey design. The instrument for data collection was a structured questionnaire developed by the researcher and was validated by three experts from the Faculty of Education, University of Nigeria, Nsukka. Main findings of the study revealed, among others, that supervision in primary schools is perceived by …


Can the material for “Development of an Automatic Street Light Control System” be used as a guide for Electrical / Electronics Engineering (EE) Project?

Yes it can be used — Street Lighting systems in the public sector are still designed according to the old standards reliability and they often do not have advantage of the latest technological development, the use of new technologies for the sources of light and also combination of sensors. This project is carried out so as to provide an alternative means of generating electricity through sunlight for lighting purpose. The aim of the study is to Design and Construct a Solar Operated Automatic Street Light Control System. In achieving this aim, the following specific objectives were laid out to power up a street lighting system through solar energy, protect the solar battery from quick deterioration as a result of continuous day and night working, control a …


Can this topic “Design and Construction of a Single Phase Auto-Transformer of Rating Ikva, 240v/110, 80 12v, 6v” be used for Electrical / Electronics Engineering (EE) Project?

Yes it can be utilized for research — This project work-up deals on the design and construction of a single phase step down nations fermor, with raking IKVA, 240V/11OV, 80V 12U, 6V. It is a multi-circuit transformer that has one input as the primary and tappins to produce the output (secondary). It is considered as a single coil in series with the supply and a common coil to the head. It is experimentally done using flat metal shocks of cast steel to form the “E” and “I” shaped laminations and coils of various turns. Not much progress has been made by those who were in the field in the production of a much circuit auto-transformer. While working this project, we got information from some textbooks on auto-transformer and …


Is the topic “Heavy Metal Distribution in Sediment of Akpabuyo Stream, Cross River Basin Southeastern Nigeria” recommended for Geology Project?

Yes it is highly recommended — Heavy metals are natural elements with atomic number greater than 20, characterized by a relatively high density, and are toxic even at low concentrations. The study was carried out to examine the Heavy Metal Distribution in Sediment using Akpabuyo Stream, Cross River Basin Southeastern Nigeria as a case study. In achieving this aim, the following specific objectives were laid out to estimate the anthropogenic input and to assess the pollution status on the area and determine the total content of heavy metals in surface sediments of Akpabuyo. Investigation revealed that heavy metals pollution of aquatic ecosystem is becoming a potential global problem, pollution typically refers to chemicals or other substance in concentration greater than it would occur under natural conditions. …


Can this topic “The Problem of Oral Expression in English Language” be used for English Language Project?

Yes it can be utilized for research — The study targets the problem of oral expression among students in some selected junior secondary school in Oredo Local Government Area of Edo State. some researcher questions were formulated to guide the direction of the study. A review of related literature was carried out to find out the views of other writers on the topic studied. Both teachers and students in the selected schools were involved in the study with data for the study collected through the administration of questionnaire to both teachers and students. Their responses were tabulated and placed side by side related research questions for analysis and interpretation for a desired result. Lastly, Summary, findings and conclusion with recommendation were made. …


Can this topic “Computerized Students Certificate Management System” be used for Software Engineering Project?

Yes it can be utilized for research — Computerized Students Certificate Management System is a system designed to computerize the process of adding certificates and verifying the certificates records of students. The aim of the study is to design and implement a Computerized Students Certificate Management System. In achieving this aim, the following objectives were set out to develop an application software that will resolve the issue of manual verification of certificates and enable the registrar to automatically generate unique certificate code for each certificate added. The motivation that led to the implementation of the proposed system is that during verification of a student certificate there were cases of employers spending lot of money in order to verify the authenticity of a certificate presented to them during job …


Can the material for “The Effects of the New Salary Scheme on Teachers’ Performance” be used as a guide for Education Project?

Yes it can be used — This research work evaluated the effects of the new salary scheme on teachers’ performance with reference to selected secondary schools in ogun-state. 50 copies of questionnaire were administered by teachers in different secondary schools. The non-parametric of chi-square was used to measure the relationship between the new salary scheme and teachers performance. The study found out that there is significant relationship between the new salary scheme and teachers performance, it was also discovered that there is a significant relationship between teachers’ efficiency, productivity and incentives given. The study equally showed that teachers will not see the new salary scheme has adequate and well compensating. The researcher however recommended that a professional body or association should be established to regulate the …



Chat with us on WhatsApp