Assessment of Project Planning Practices and It’s Impact on Contractors Profitability

ASSESSMENT OF PROJECT PLANNING PRACTICES AND IT'S IMPACT ON CONTRACTORS PROFITABILITY


ABSTRACT

Planning in construction involve defining the activities, actions, time, cost, durations and performance milestone which will result into successful completion of the project. Previous researches attributed insufficient construction planning to Nigerian indigenous construction companies; this insufficiency in construction planning was found to contribute to their low productivity, profitability, time overrun and cost overrun. This study was carried out to assess construction project planning of indigenous contractors with a view to enhance their performance. The methodology of the research involve use of purposive sampling technique, sample size of 50 companies was determined using 90% confidence level from a population size of 1920 calculated with sample size table and formula. Questionnaire was self-administered to respondents, Questionnaires were analyzed and results were presented in tables and bar charts. Findings from the research revealed that construction project planning is insufficient and requires improvement. Cost overrun, time overrun, poor scope control and reduction in profit are problems experienced by contractors. The failure of construction project planning was attributed to client unethical dealings, lack of integrity in financial dealings of client and poor communication among project members. In order to improve planning of construction project, the research recommends contractors to perform financial and ethical check on client, employ distinct project manager to each project, employ the use of computerized systems and experience in planning construction projects. The research also recommends contractors to improve communication among project team through establishment of reliable and accessible communication channel.


CHAPTER ONE

1.0 Introduction

1.1 Background of the Study

Projects are used in all economic and non-economic fields as mean of organizing the activity, aiming the achievement of desired objectives. There is a direct relationship between projects, projects portfolio, programs and the organizational strategy. Projects, as the main way of creating and dealing with change (Cleland, Gareis, 2006), are used to implement strategies. Meskendahl (2010) refers to projects as the central building block used in implementing strategies, therefore business success is determined by the success of the projects.

A project is an individual or collaborative enterprise, possibly involving research or design that is carefully planned, usually by a project team, to achieve a particular aim New York Time (2009). A project is also temporary because it has a defined beginning, end time, and defined scope and resources (Cathy, 2009). A project is unique because it is not a routine operation, but a specific set of operations designed to accomplish a singular goal. Based on these characteristics, carefully it is imperative to plan to achieve targeted outcome. Thus; Project planning can be defined as a part or branch of project management, which relates to the use of schedules to plan and subsequently report progress within the project environment.

Dubois and Gadde (2002) described the construction industry as decoupled and McKinsey (2017) confirmed that it is still true. The lack of coupling is present both between the construction project and its subcontractors as well as between the project and the parent company and other projects. This hampers the possibility to have a successful coordination of resources on a portfolio level within the contractor, as resources are in many cases utilised from a common resource pool (Engwall and Jerbrant 2003).

The construction industry therefore embraces a wide range of loosely integrated organizations that collectively construct, alter and repair a wide range of different building and civil engineering projects. Individuals, organizations and government need to carry out some form of project planning for building and civil engineering project before embarking on whatever activity they are engaged to do. According to Lock (2002), the principal identifying characteristics of a project is its novelty, it's a step unknown fraught with risk and uncertainty. No two projects are ever exactly alike and even a repeated project will differ from its predecessor in one or more commercial, administrative and physical aspect.

Construction is also characterized by time and cost intensive production processes which make it prone to project risks and failure, mainly in terms of time and cost. In practice, this means, that the performance of construction projects is usually low. In particular, construction projects are very often delayed and over budget. This is not just due to problems faced during project scheduling, but also during related processes.

Therefore, in Nigeria where the research was carried out, the activities that was conducted is to know the Assessment of Project Planning Practices and It’s Impact on Contractors Profitability.


1.2 Statement of Problems

The performance of Nigerian indigenous construction companies was found by Ibrahim et al (2014) to be hindered by mismanagement, which often result into inefficient planning of construction project. Kirmani (1988) observed that this inefficiency in construction project planning has significantly hinders productivity of the industry to a level lower than that of its multinational counterparts, resulting to major percentage of the total project in Nigeria going to multinational contractors.

According to Aibinu and Jagboro (2002), another major criticism facing the Nigerian construction industry is the growing rate of delays in construction project delivery and other associated problems, which often results into dispute, arbitration, total abandonment and protracted litigation by the parties. These problems, according to Odeyinka and Yusif (1997) are associated with planning and scheduling, they are internal factors in an organization that causes delay in construction project delivery.

According to Inuwa et al (2014), Nigerian indigenous construction companies were found to be using their central administration to plan project operations instead of an identified project manager, in appropriate application of planning techniques and non-adoption of computer applications and ICT in planning of construction projects.

In a research by Oladimeji and Ojo (2012), Nigerian indigenous construction companies were found to lack the ability to efficiently and profitably deliver project due to in adequate planning and budgetary provisions among other factors. The outcome of these inefficiencies have been several report of abandoned or malfunctioned facilities, project executed at higher sums and frequent cases of collapsed structures. The recurrent nature of these traits create dissatisfaction among clients which result into award of major capital intensive project to foreign firms especially were quality and completion period are of utmost demand.

Despite the evidence identified in previous literature that linked inefficient planning to negative project outcomes, these researches were unable to harmonize various aspects of construction planning into a single research. Each of the studies, such as Adebayo (1980) was able to identify problems associated with construction planning and concentrate on some aspects of construction planning such as planning techniques, planning technology and planning manpower. This approach has not provide the necessary solution to the problem of construction planning in Nigeria, and the result has been recurrent experience of same problems through the decades.

The study of Adebayo (1980) select few construction companies and compare the project planning techniques they adopt in planning, this only provide result relating to only planning technique in the selected organizations. But planning is influenced not only by technique but also other aspects of planning such as technology and other external factors. Hence, there is need undertake research in order to study more organizations, more variables relating to construction planning also need to be considered.

Other studies, such as Agbo (2004) and Mohammed (1988) study cost planning relating to construction project, Audu (2001) study how planning techniques affects construction project planning, while Yazid (2009) study the impact of software applications in construction project planning. Each of the researches was able to identify at least an existing problem relating to construction planning but was not able to provide the necessary understanding of the problems collectively, their causes and how to improve planning taking into consideration key variables used in planning of construction projects.

Nigerian indigenous construction companies were shown to be associated with inefficient planning which result into low productivity and growing rate of delay. They were also found to be wrongly adopting methods and procedures of planning which was shown to reduce the profitability of the companies and cause frequent cases of contract abandonment. Inefficiency in construction planning also have a negative impact on the national economy. Researches in construction were able to identify inefficiency in planning but do not provide holistic approach to understanding current methods of planning used by contractors, why those methods are inadequate and provide solution on how to improve construction planning methods.


1.3 Aim and Objectives of the Study

The aim of this study was to assess project planning practices and its impact on contractors' profitability. In achieving this aim, the following specific objectives were laid out as follows:

  1. To identify project planning techniques and tools used by contractors in construction project delivery;
  2. Determine factors affecting project planning practices of contractors; and
  3. To evaluate the impact of proper project planning on contractor's profitability.

1.4 Research Questions

The study came up with research questions so as to be able to ascertain the above stated objectives. The specific research questions for the study are stated below as follows:

  • What are the project planning techniques and tools used by contractors in construction project delivery?
  • What are the factors that affect project planning practices of contractors?
  • What is the impact of proper project planning on contractor's profitability?

1.5 Research Hypothesis

In order to pursue the objective of this study, the following generalized statements have been designed to guide and aids in obtaining the result for the experiment to be conducted. For this work, the null hypothesis will be represented with H0 while the alternative hypothesis will be represented with hypothesis H1.

Hypothesis One

  • H0: There is no significant difference between Project Planning Practices and Contractors Profitability
  • H1: There is significant difference between Project Planning Practices and Contractors Profitability

1.6 Significance of Study

This study will be of immense benefit to researchers who intend to know more on this study and can also be used by non-researchers to build more on their research work. This study contributes to knowledge and could serve as a guide for other study.


1.7 Scope of Study

The study focuses on the Assessment of Project Planning Practices and It’s Impact on Contractors Profitability.


1.8 Limitations of the Study

During the course of this study, many things militated against its completion, some of which are:

  1. Time Constraint: The time frame given to accomplish this project was very short due to school academic calendar and it was carried out under pressure which made the researcher not to implement some necessary features.
  2. Research material: availability of research material is a major setback to the scope of the study.
  3. Frequent power failure: This made the researcher append more money on fuel to ensure sustainable power.
  4. Financial Constraint: Insufficient fund tends to impede the efficiency of the researcher in sourcing for the relevant materials, literature or information and in the process of data collection (internet, questionnaire and interview).

1.9 Definition of Terms

Contract Planning: It is a process of systematically and efficiently managing contract creation, execution and analysis for the purpose of maximizing financial and operational performance and minimizing risk.

Evaluation: According to Farlex Partner, 2012, evaluation is a systematic, objective assessment of relevance, effectiveness and impact of activities in the light of specified objectives. Indeed, it is an assessment, judgment of the worthiness or value of a project, policy, intervention, state of affairs, self.


CHAPTER TWO

2.0 Literature Review

2.1 Introduction

The review of relevant literature is the main topic of this chapter. A literature review covers theoretical and methodological contributions to a certain issue in addition to the state of knowledge at the time of writing. It provides information about the state of the art in relation to the subject you are writing about. It examines the body of work on the chosen subject. The literature evaluation in this study comprises the …


Procedure for Downloading the PDF (Docx) Material


Assessment of Project Planning Practices and It’s Impact on Contractors Profitability can be downloaded by requesting the full set of materials at the project or seminar cost. The document will be sent via Microsoft Word (MS-Word) format via WhatsApp (e-mail) following payment confirmation.


Seminar Material Cost
₦3,000
Project Material Cost
₦5,000


Request Complete Material

Complete Material Chapters of Assessment of Project Planning Practices and Its Impact on Contractors ProfitabilityClick here to request the Complete Material via WhatsApp including;
  • Preliminary Pages,
  • Chapter 1-5,
  • References and Appendix.



TABLE OF CONTENTS

PRELIMINARY PAGES


CHAPTER ONE

INTRODUCTION

  • 1.1 Background of the Study
  • 1.2 Statement of Problem
  • 1.3 Aim and Objectives of the Study
  • 1.4 Research Questions
  • 1.5 Research Hypothesis
  • 1.6 Significance of Study
  • 1.7 Scope of Study
  • 1.8 Limitations of the study
  • 1.9 Definition of Terms

CHAPTER TWO

LITERATURE REVIEW

  • 2.1 Introduction
  • 2.2 Conceptual Review
  • 2.3 Theoretical Framework of Construction Project Planning
  • 2.3.1 Level of Planning
  • 2.4 Construction Planning Techniques
  • 2.5 The Role of Planning in Increasing Contractors Profit
  • 2.6 Factors Contributing to Profit Maximization or Loss in Contracting Firms
  • 2.7 Planning in the Construction Industry
  • 2.8 Effect of Planning on Project Delivery
  • 2.9 Empirical Studies

CHAPTER THREE

RESEARCH METHODOLOGY

  • 3.1 Introduction
  • 3.2 Research Design
  • 3.3 Population of Study
  • 3.4 Sampling Technique
  • 3.5 Research Instrument
  • 3.6 Method of Data Collection
  • 3.7 Method of Data Analysis
  • 3.8 Questionnaire
  • 3.8.1 Interview
  • 3.8.2 Key Informants Interview
  • 3.8.3 Observation
  • 3.9 Statistical Analysis

CHAPTER FOUR

PRESENTATION AND ANALYSIS OF DATA

  • 4.1 Introduction
  • 4.2 Presentation and Analysis of Data
  • 4.3 Re-statement of Research Questions
  • 4.4 Test of Hypothesis 1
  • 4.5 Discussion of Findings

CHAPTER FIVE

SUMMARY, CONCLUSION, AND RECOMMENDATION

  • 5.1 Introduction
  • 5.2 Summary of Findings
  • 5.3 Conclusion
  • 5.4 Recommendation

REFERENCES

APPENDIX A - “QUESTIONNAIRE”


Disclaimer for Complete Material Utilization

The displayed research work titled "Assessment of Project Planning Practices and It's Impact on Contractors Profitability" is stated as a research guideline towards accomplishing your assigned project / seminar research work. All the research materials on this website are ONLY for research purposes and should be used as a guideline in developing your research work. For no reason should you copy word for word as projectlist.com.ng will not be liable for any who copied the material. By ordering the complete research guideline, it signifies that you've accepted our terms of service.


Frequently Asked Questions (FAQ)


Can the material for “Analysis of Christian Handbills' Pragmatic Content” be used as a guide for English Education Project?

Yes it can be used — The study was carried out to analyze of Christian handbills using Ughelli in Delta State as a case study. In achieving this aim, the following specific objectives were laid out to identify the different graphosyntactic errors in the language used in Christian handbills and analyze the possible semantic implications of Christian handbills in Ughelli. Christian handbills are one of the leading non-verbal means of communication in the society today especially the church handbills and posters. Technically put, posters are very important forms of visual communication. It presents picture(s) with meanings lying behind it. However, there exist some graphosyntactic errors, lexical, syntactic features and semantic features used in Christian handbills. The problem of grapho-syntactic errors contravenes syntactic and graphological norms of …


Can the material for “The Knowledge and Practice of Contraception among Male Adolescent Students” be used as a guide for Sociology Project?

Yes it can be used — Contraceptives are drugs or device used to prevent a woman from being pregnant and also used to protect men and women from sexually transmitted diseases. How can this be driven home is truth to our adolescences, utilized to reduce our teaming population and to reduce the diseases that are sexually transmitted. To assess the knowledge and improve the practice of this knowledge in our teaming adolescent population bearing in mind that a good beginning will eventually grow to a good end. The research design used in this report is descriptive design, utilizing questionnaire method to obtain information from the respondents for this project. A total of 133 (one hundred and thirty three) respondents were selected for this study to represent …


Can the material for “Design and Implementation of a Computer Based Management System for Hotel Front Desks” be used as a guide for Computer Science (CS) Project?

Yes it can be used — This project “Hotel front Office Management System” tends to deal with the system of all the information needs of the different sections of a hotel. The hotel presidential ltd (which is a large and fast growing hotel) has because of its size and location, made its mark in the tourism industry in the city. Most times, the hotel runs into problem of getting necessary information in the sections of registration of guest, guest bookings and reservation, check in and check out process of a guest, and other sections of the hotel which include the accounts and security sections. In essence, the study led to the development of “Hotel-info package” which will help a long way in reducing the problems encountered by …


Can this topic “Thermal Properties of Some Selected Materials Used as Ceiling in Building” be used for Physics Project?

Yes it can be utilized for research — A ceiling is an overhead interior surface that covers the upper limits of a room. It is not generally considered a structural element, but a finished surface concealing the underside of the roof structure or the floor of a story above. The study was conducted to investigate the Thermal Properties of Some Selected Materials Used as Ceiling in Building. In achieving this aim, the following specific objectives were laid out to study the possibility of making use of local raw materials for the production of ceiling board and determine thermal resistivity and measure thermal conductivity, absorptivity and diffusivities of the ceiling. Investigation revealed the challenge of the existing research which entails that there is health threat of the existing production …


Can the material for “Language of Persuasion; An Examination of Governor Aliyu Wamakko’s Selected Speeches” be used as a guide for English Language Project?

Yes it can be used — This research work focuses on the language of persuasion by examining some selected speeches of Governor Aliyu Magatakurda Wamakko. It has been carefully observed that the Sokoto state Governor is fond of using persuasive expressions in most of his speeches. He uses the language mostly to captivate and convince his audience and this tends to endear him across the state to achieve his political goals …


Can the material for “The New Morality of Joseph Fletcher: A Philosophical Analysis” be used as a guide for Philosophy Project?

Yes it can be used — The purpose of the study is to critically examine Joseph Fletcher’s situation ethics on New Morality. Fletcher’s ethics is a response to universalist or absolute approach to the question of morality. The problem to be treated is about moral decision-making. How is one to act when faced with a moral decisive situation? Life presents us with situations where decisions are not so clear-cut. Saying yes to one perceived good often means saying no to another. Data were sources from textbooks, journals, newspapers and the internet were employed. The data were presented on a frequency distribution table and analyzed using simple percentage. The relevance of this study is that it shows that some actions are not right or wrong in themselves, …


Is the topic “Overview and Impact of Frauds” recommended for Banking and Finance (BF) Project?

Yes it is highly recommended — Fraud is an awful phenomenon, which like a view has invaded Nigeria banking industries and the society in general, and puts any organisation that is comes into in a distress point of in a state of liquidation. This study highlights the nature and various types of fraud, causes of bank fraud extent of fraud in banks, effect of bank fraud, detection and control measure adopted by management to check fraud incidents. The purpose of this research work is to find out whether there is significance level of fraud in Nigeria banks to know whether Nigeria practice, aid or abate fraud and to consider the adequacy of the internal control system in detecting and preventing fraud in the bank. The method of data collection …


Can the material for “The Educational and Development and Marketing of Service Products in the Educational Sector” be used as a guide for Education Project?

Yes it can be used — The evaluation and development and marketing of service products in educational sector is a very interesting topic to research on because it will help both the service industries and government at large to enact policies that will help in boosting the educational level of our community. In trying to make this study a success, the researcher used Imo State University as a case study to validate the findings of this study. The researcher chose this institution because it represents the service industries in Nigeria. The researcher used oral interviews and questionnaires to collect information relative to this study. The researcher made use of primary and secondary data sources; the primary data sources is made up of interviews and questionnaires while the …


Can this topic “The Effect of Motivation on Employee’s Performance in Global Polythene Industry” be used for Human Resource Management (HRM) Project?

Yes it can be utilized for research — The research project attempt to examine the effect of motivation on employees’ performance in global polythene industry Kaduna. The objectives of the study amongst others are to determine the relationship between motivation and performance and to assess the adequacy of employees reward in global polythene industry. The researcher adopted questionnaire and interview in the collection of primary data and documentary evidences such as literature review for secondary data. It was found out that incentives are not the only tools for motivating employee’s other motivational factor or tools discovered includes good working tools, good work environment, equitable salaries, and recognition e.g. promotion. The researcher recommended that motivational tools such as training should be extended to junior staff and those employees should …


Can the material for “An Assessment of the Contribution of the Leadership Skills to Effective Management of Schools” be used as a guide for Education Project?

Yes it can be used — This study examined the development of leadership skills in schools; an assessment of the contribution of leadership skills to effective management of Caleb International and Supreme Foundation schools located in Kosofe Local Government Area of Lagos State. Literature review was carried out under relevant sub-headings. The descriptive research survey design was applied in the assessment of respondents’ opinions using the questionnaire and the sampling technique. A total of one hundred and fifty (150) respondents were involved in this study to represent the entire population of the study. A total of four null hypotheses were formulated and tested using the pearson product moment correlational statistic and independent t-test statistic at 0.05 level of significance. Also, the bio-data and the responses of the …



Chat with us on WhatsApp