Project Topics | Seminar Topics | Related Topics
Assessment of Information Technology (IT) Uses At Pre-Contract Stage of Building Projects

ASSESSMENT OF INFORMATION TECHNOLOGY (IT) USES AT PRE-CONTRACT STAGE OF BUILDING PROJECTS


CHAPTER ONE

1.0 Introduction

1.1 Background to the study

Every construction process requires heavy exchange of data and information between project participants on a daily basis. This makes the construction industry on of the most information-intensive industries. Information Technology (IT) has been widely applied across many sectors in order to increase competitiveness and reduce consists and is today seen as a medium to gain a competitive advantage (Earl, 1993). Construction industries usually use Information Technology (IT) in order to overcome problems and achieve improvements in construction process. The average annual growth rate of IT investment in the construction industry is increasing every year and this now constitutes a significant part of the total project cost. (Issa et al. 2007).

Information Technology (IT) is seen as a mechanism that enables fundamental change to be effected in the construction industry. However, firms in the construction industry are slowly responding and adapting to developments in information and communication technologies (Alshawi and Ingirige 2003). O’Connor and Yang (2003) opined that the success of a project is related to the level of IT use. The duo approached the issues of IT by means of statistical methods and discovered that there is a statistically significant correlation between the use of IT and projects being successful. In Nigeria, Oladapo (2007) argued that the level of use of IT in the construction industry is low and one of the reasons is attributed to the project leaders’ attitudes toward the use of IT in their organization.

The integration of construction processes using IT offers considerable potential for construction firms while poor flow and integration of information have led to low productivity and competitiveness in the industry (Hampson, 1993). Technological developments such as the internet and internet are re-defining the way construction firms should carry out many of their strategic, tactical and operational business processes. It is observed that the construction industry is currently experiencing a change from traditional paper-based to digitally based information exchange, which other industries such as aircraft manufacturing and banking have adopted and benefited from, long ago. The use of IT can impact on the traditional processes of organization in construction and result in change in organizational processes, working methods and culture (Alshawi and Ingirige 2002).

This study attempts to evaluate the level of use of IT on construction project. The study will examine the relative effects of selected factors on the use of IT in project delivery, the level of use of IT at the pre-contact stage of construction projects in Akwa Ibom State and its influence on project performance. IT has been an effective tool adopted in other industries to enhance work processes and achieve digital-based documentation and communication, resulting in a real-time connection among work stakeholders and suppliers (Fischer and Kunz, 2004). The use of IT reduces task fragmentation and improves coordination and collaboration, resulting in better communication practices among term members of the construction project.

IT use and implementation is not a straightforward process because many issues need to be considered at the earlier stages when IT is to be adopted. However, implementing IT in construction companies does not usually provide all the benefits initially envisaged at the expected time. Other benefits require more time for maturity, therefore, there is a time gap between the initial investment and revenues (Peppard et al., 2007).


1.2 Statement of the Problem

In this era of rapidly advancing technologies, many organizations and governments around the globe are spending a great amount of money on technologies in order to increase their productivity, efficiency and the quality of the work they do. Effective use of information technology will require those who are involved in information management to accept if first. According to Willcocks (2002), it is widely accepted that unless decision makers develop positive attitudes toward IT, they will not use them in their work practice.

Therefore, there is need to understand whether project leaders in construction organizations accept technological advances, what the primary elements of successful adoption and utilization of information technology are and what the primary factors affecting the use of IT are. Thus, Nigerian government need to provide the necessary tools in order to overcome such issues and identify the benefits and gains that this technology would contribute to construction benefits and gains that this technology would contribute to construction industries and project performance.

By providing the necessary tools and policies, it will most likely create conditions that will guarantee the adoption, acceptance and use of information technology. Cooper (2001) asserted that knowing the factors that influence project leaders, adoption of information technology will help to identify and predict how information technology will contribute to project success and organizational performance in terms of effectiveness and efficiency gain. In Nigeria, Oladapo (2007) argued that the level of use of IT in Nigeria is low and one of the reasons is attributed to the project leaders’ attitudes toward the use of technology in their organizations. As a result, it is important to determine if project leaders are willing to adopt the use of this technology in their daily work and why some may avoid using it.

The problem addressed in this study is to determine the level of use of IT at pre-contract stage, the factors that factors that affect the use of IT in construction projects in Akwa Ibom State and the influence of the of use of IT on the project performance.


1.3 Aim and Objectives of the Study

The aim of this study is to evaluate the use of IT in project delivery and its impact on project performance with a view to promoting IT based project delivery process in Akwa Ibom State. The research objectives are to:

  1. Determine the factors that affect the use of IT at pre-contract stage
  2. Determine the extent of use of IT as pre-contract stage in building projects
  3. Determine the influence of IT utilization at pre-contract on project performance

1.4 Significance of the study

The importance of this study comes from the role that project leaders play in the management and execution of construction projects in Akwa Ibom State, Nigeria. In order for the Project leaders to carry out this role successfully, they need an awareness of the benefits that information technology brings to construction. The study provides very helpful and important information regarding the organizational, project, technological and managerial characteristics and explains the factors influencing the adoption and use of IT.

This study further provides a strong understanding of this observable fact and makes a clear understanding of the factors affecting the project leaders’ attitude toward the successful adoption and utilization of information technology for project delivery. This study assesses the level of use of IT at pre-contract stage; this assessment determines which pre-contract process utilizes IT more. This will enable the project leader and construction organization to be fully aware of the IT applications that should be invested in. this study also explores the relationship between the level of use of IT at pre-contract and the performance of projects.

The significance of this study comes from the fact that IT has an important role to play in the speed, cost and quality of project documentation which should translate to improved project performance. In order for this to be achieved, there is the need for greater understanding of the benefits that IT brings to construction. The results will assist oil and gas companies, construction organizations and project leaders to promote the use of IT in the delivery of construction projects in Akwa Ibom State Nigeria. This understanding prompts this study.


1.5 Research Questions

The study came up with research questions so as to be able to ascertain the above stated objectives. The specific research questions for the study are stated below as follows:

  • Does the level of Use of IT at pre-contract have signification influence on project performance?
  • What is the extent of use of IT at the pre-contract stage of project delivery?
  • What are the factors that influence IT utilization at pre-contract stage of building project?

1.6 Research Hypothesis

Based upon the research questions, one research hypothesis is postulated and tested in this study. The hypothesis states as follows:

Hypothesis One

  • H0: There is no significant positive relationship between the level of IT use at pre- contract stage and project performance.
  • H1: There is a significant positive relationship between the level of IT use at pre- contract stage and project performance

1.7 Scope and Delimitation of the Study

This study is concerned with determining the factors affecting the use of IT at pre-contract stage of construction project in Akwa Ibom State, assessment of the level of use of IT and its influence on project performance. The focus of the study is restricted to the pre-contract stage because it is the stage when major documentation on a project is done.

Project location used for the study is also restricted public and private sector building projects. Project category used for the study is grouped into two category namely residential and institutional projects.

The study is limited to building projects construction projects completed between 2011 and 2014 within the state capital and other local government areas.


1.8 Definition of Operational Terms

Computer-based Information Technology:

Computer-based Information Technology is any computer-based information processing system using an extensive technology designed to allow decision makers within organizational units to process data from their external environment into information to reduce uncertainty (Harrington, 1996).

Computer-based Systems:

Computer-based system is a collection of computer hardware and software brought together to facilitate the processing of information for an organization. They are used for a variety of functions within organizations, including component design and manufacturing customer recordkeeping, presentation development, decision making, training, budgeting, planning and controlling (Harrington, 1996).

Pre-contract Stage:

Pre-contract stage in construction project includes the conceptual stage, feasibility studies, front-end engineering design stage, detailed design stage, tender and bid analysis (Soh, 1992).

Project Leader:

Project leaders in this study are professionals employed in clients’ organizations and they represent the project clients. The project leaders are those at the management level of the hierarchy such as project manager, construction manages, discipline engineers, project engineers, and project coordinator. They are the decision maker in the project.

Information:

According to Love (2004), information is an important or useful facts obtained as output from a compute by means of processing input data with a program.

Information and communication Technology (ICT):

The term is broadly defined to include the direct operations of any compute-based o communication technologies, networked or standalone, hardware and software. In general, it is any product that uses of computer or communication hardware or software for the technological base (Cooper, 2001).

Information Technology (IT):

Andersen (2002) define information technology (IT) as all components that together provide necessary information, such as hardware, software, communication technology essential equipment and attendant techniques, the people and the procedures with which they work, and the data that are processed by the system.

Technology:

Defined simply as a collection of processes for transforming inputs into outputs and the knowledge and skills necessary for their application IT is also defined technology as a set of systems for getting the organization’s work done (cited in Harrington, 1996).


CHAPTER TWO

2.0 Literature Review

2.1 Introduction

The review of relevant literature is the main topic of this chapter. A literature review covers theoretical and methodological contributions to a certain issue in addition to the state of knowledge at the time of writing. It provides information about the state of the art in relation to the subject you are writing about. It examines the body of work on the chosen subject. The literature evaluation in this study comprises the …


Procedure for Downloading the PDF (Docx) Material


Assessment of Information Technology (IT) Uses At Pre-Contract Stage of Building Projects can be downloaded by requesting the full set of materials at the project or seminar cost. The document will be sent via Microsoft Word (MS-Word) format via WhatsApp (e-mail) following payment confirmation.


Seminar Material Cost
₦3,000
Project Material Cost
₦5,000


Request Complete Material

Complete Material Chapters of Assessment of Information Technology IT Uses At PreContract Stage of Building ProjectsClick here to request the Complete Material via WhatsApp including;
  • Preliminary Pages,
  • Chapter 1-5,
  • References and Appendix.



TABLE OF CONTENTS

PRELIMINARY PAGES


CHAPTER ONE

INTRODUCTION


    • 1.0 Introduction
    • 1.1 Background …

    CHAPTER TWO

    LITERATURE REVIEW

    • 2.1 Introduction
    • 2.2 Conceptual Review
    • 2.3 Theoretical Framework
    • 2.4 Empirical Studies
    • 2.5 Research Gaps
    • 2.6 Summary of Literature Review

    CHAPTER THREE

    RESEARCH METHODOLOGY

    • 3.1 Introduction
    • 3.2 Research Design
    • 3.3 Population of Study
    • 3.4 Sampling and Sampling Technique
    • 3.5 Validation of Research Instrument
    • 3.6 Method of Data Collection
    • 3.7 Method of Data Analysis
    • 3.8 Questionnaire Administration
    • 3.9 Ethical Consideration
    • 3.10 Statistical Analysis

    CHAPTER FOUR

    DATA ANALYSIS, RESULT AND DISCUSSION

    • 4.1 Introduction
    • 4.2 Presentation and Analysis of Data
    • 4.3 Re-statement of Research Questions
    • 4.4 Test of Hypotheses
    • 4.5 Discussion of Findings

    CHAPTER FIVE

    SUMMARY, CONCLUSION AND RECOMMENDATION

    • 5.1 Introduction
    • 5.2 Summary of Findings
    • 5.3 Conclusion
    • 5.4 Recommendation
    • 5.5 Suggestion for Further Study

    REFERENCES

    APPENDIX A - “QUESTIONNAIRE”


    Disclaimer for Complete Material Utilization

    The displayed research work titled "Assessment of Information Technology (IT) Uses At Pre-Contract Stage of Building Projects" is stated as a research guideline towards accomplishing your assigned project / seminar research work. All the research materials on this website are ONLY for research purposes and should be used as a guideline in developing your research work. For no reason should you copy word for word as projectlist.com.ng will not be liable for any who copied the material. By ordering the complete research guideline, it signifies that you've accepted our terms of service.


    Frequently Asked Questions (FAQ)


    Is the topic “Construction of a 2kva Variac (0v – 240v) Range” recommended for Electrical / Electronics Engineering (EE) Project?

    Yes it is highly recommended — Variac is a single primary winding wrapped around a magnetic core is used as in the autotransformer but instead of being fixed at some point, the secondary is tapped continuously over the output voltage range. The aim of the study is to design and construct a 2kva (0v - 240v) range, with a step up of 20v at 10 step. In achieving this aim, the following specific objectives were set out to power the electrical/electronic and laboratory equipments with a fixed input voltage, design a system that will be able to vary voltage from 0V to 240V, construct the system stated in the aim above using locally available materials, and examine the design process of 2kva autotransformer with a step …


    Can the material for “Impact of Online Marketing on Small and Medium Enterprises (SMEs) in Nigeria” be used as a guide for Marketing (MKT) Project?

    Yes it can be used — Online marketing is the application of the internet and related digital technologies to achieve marketing objectives. The study was carried out to examine the impact of online marketing on small and medium enterprises (SMEs) in Nigeria. In achieving this aim, the following specific objectives were laid out to determine if an online marketing application has a significant and positive impact on business performance in small and medium enterprises and investigate the nature of the relationship between online marketing and small and medium sized businesses’ productivity. Investigation revealed that online marketing has changed and is still changing the way business is conducted around the world. The commercialization of the Internet has driven online marketing to become one of the most promising …


    Can the material for “Grammatical Error Analysis of Selected News Scripts of the Broadcasting Corporation” be used as a guide for English Language Project?

    Yes it can be used — This study was carried out in respect to the grammatical errors that currently exist in the Broadcasting Corporation of Abia State Radio, Umuahia. The sole aim of this study was to carefully investigate the above station’s news scripts, examine their structure, and to find out the causes, types and patterns of grammatical errors which include punctuation, concord, omission, preposition and pluralisation errors in the selected news scripts of different years. The most selected news scripts used were world news, news in brief, news headlines, news package, news segment, and news digest. The data were collected from the news room of the BCA Radio, Umuahia, which represents other media houses all over the country. Each of the above news scripts was …


    Can the material for “Nigeria Public Service, Problems and Prospect” be used as a guide for Public Administration (PA) Project?

    Yes it can be used — This research is basically focused on the problems of Nigerians public service with Nigeria Television Authority channel 6 Aba as the case study. Many problems encountered by the Nigerian public service were realizes. The problems impede efficiency and productivity in the public service. The study was carried out for the purpose of explaining the relevance of public service in the state. And to comprehend the things that impede effective performance in the Nigerian public service, the impact of the problems was examined. Several ways of curbing the problem were stated. And recommendations were proffered. …


    Can the material for “The Influence of Smart Phones and Social Networking Sites on the Academic Performance of Senior Secondary School Students” be used as a guide for Social Work Project?

    Yes it can be used — The study investigated the influence of smart phones and social networking sites on the academic performance of secondary school students in Amwuwo-Odofin local government area of Lagos State. The descriptive research design was adopted for this study. Three (3) public secondary schools were selected from the list of Public Schools in Amuwo-Odofin Local Government Area of Lagos State using the Simple Random Sampling Technique. Two hundred (200) students were selected using stratified Random Sample Technique. The research instrument used was a four point modified Rennis Likert Rating Scale Questionnaire type. Five research questions were raised and five hypotheses were formulated. Data analyses was done using the descriptive statistics of frequency counts and percentages to answer research questions while the hypotheses formulated …


    Can the material for “Impact of Macroeconomic Policy on Poverty Alleviation in Nigeria” be used as a guide for Economics Project?

    Yes it can be used — The objective of this study is to examine the impact of macro economic policy on poverty alleviation in Nigeria. In order to test the hypothesis formed on the study, secondary data were collected from reliable sources like CBN official bulletins FOS etc, three general models were formulated and tested using ordinary least square analysis where the relationship between the dependent and independent variables were tested. The reliability of the parameters estimated for the models were tested using T − test and Durbin Watson test of auto correlation. It was discovered that poverty alleviation allocations increased annually. In terms of approaches to poverty alleviation, there is the need to increase the demand and therefore the prices for those factors of production that …


    Can the material for “Providing Renewable Energy Solutions” be used as a guide for Business Administration and Management (BAM) Project?

    Yes it can be used — This thesis was prepared as part of the CONNECT project embarked on by Laurea University of Applied sciences, other Universities of Applied Sciences and other stakeholders in partial fulfillment of a bachelor’s degree in business management. The main purpose of the CONNECT project is to enhance growth and speed up the internationalization within developing country markets of Finnish Small and Medium scale Enterprises (SMEs) renewable energy companies. The main research question addressed is whether Finnish renewable energy companies should invest in Ghana or not. On this premise, the business environment of Ghana was analyzed using the PESTEL framework. The purpose of the study is to determine the most feasible way to enter into the Ghanaian renewable energy market, to identify which renewable …


    Can this topic “The Social Cultural Factors Affecting the Use of Family Planning” be used for Sociology Project?

    Yes it can be utilized for research — The study was carried out to examine the Social Cultural Factors Affecting the Use of Family Planning using Oredo Local Government Area as a case study. Research has shown that the issues with using family planning techniques include the perception that women should bear the brunt of the blame for having a large number of children. Furthermore, until an unintended pregnancy occurs, women do not discuss family planning or contraception with their spouses.One of the social-cultural factors that are the rules that determine what should or should not be done. The researcher observed that the study area does not have a norm that promotes the use of family planning. The research design used in this report is descriptive design, utilizing questionnaire …


    Is the topic “Design and Implementation of Face Recognition System for Home Security” recommended for Computer Science (CS) Project?

    Yes it is highly recommended — Face recognition system is an application for identifying, detecting object, analyzing the face, understanding the localization of the face and face recognition. The aim of the study is to design and implement a Face Recognition System for Home Security. In achieving this aim, the following specific objectives were laid out as follows to develop an application software that will assist in maintaining a strong security in an organizational work environment, highlight areas of vulnerability in the new system and create a ridged and secure database for the organization to enable them secure their sensitive data and records. The motivation that led to the implementation of the proposed system is as a result of the issues with face detection and recognition …


    Can the material for “An Evaluation on the Attitude of Child Care Givers Towards Child Care Practices in Nursery School” be used as a guide for Education Project?

    Yes it can be used — The study attempted to investigate an evaluation of the attitudes of child caregivers towards child care practices in nursery schools in Agege and Ikeja Local Government Areas of Lagos State. In this study, some relevant and related literatures were reviewed under sub-headings. The descriptive research survey design was applied in the assessment of the opinions of the respondents with the aid of the questionnaire and the sampling technique. A total of 200 (Two hundred) respondents were used in this study. A total of three null hypotheses were formulated and tested in this study with the use of the Pearson Product Moment Correlation Coefficient statistical tool. All the hypotheses were tested at 0.05 level of significance. At the end of the tests, …



    Chat with us on WhatsApp