An Investigation Into Design Errors and It’s Impact on Initial Cost of a Construction Project

AN INVESTIGATION INTO DESIGN ERRORS AND IT'S IMPACT ON INITIAL COST OF A CONSTRUCTION PROJECT


CHAPTER ONE

1.0 Introduction

1.1 Background Of The Study

Diverse construction process disciplines cannot agree upon a common definition when asked to define "design error." Based on different definitions of "design" and "error," we conclude that a design error is a deviation from a drawing or specification, including omissions and ambiguities. Depending on which discipline you address, the owner, the designer, or the contractor, there will be a common understanding surrounded by varied conclusions, "a mistake." Managing the all too common cost and schedule overruns that affect the construction industry is one of the most significant challenges facing management today (Diekmann and Thrush, 1986). The gravity of this error must be taken into account to determine its impact on the project's overall outcome.

The owner, designer and contractor all have different interests in, or uses for the design of a facility. But what they do share is the commitment to complete the project safely and within a given budget and completion time. There are many initiatives being conducted to control the growth of cost and schedule within the construction industry.

The major issue is “accuracy of the drawings,” or the number of design errors, omissions and ambiguities within the plans and specifications that affect the quality of the facility. Inadequacies in the plans and specifications are the major causes of changes to the contract So much emphasis is placed on the issue of time and cost that quality takes a back seat.

The quality of the project depends on the conformance of the objectives and requirements from the owner. An informative quality management technique will provide an agreement to procedures and definitions among the principle parties for the project. Since design errors have an impact on the outcome of the effectiveness of the contractor’s effort on the project it is essential that all parties determine what the definition of a design error should be. When asked to define design error, not all disciplines in the construction process agree on a common definition. From the basic definition of design and error it can be determined that a design error is a deviation from a drawing or specification. It is the seriousness of this error that must be considered to determine its consequences on the overall outcome of the project.


1.2 Statement Of The Problem

Design errors indicate the total design in-effectiveness of a project. Major design quality problems occur during construction when errors, omissions and ambiguities in plans and specifications become evident (Davis and Ledbetter, 1987). This statement directs that the inadequacies in the plans and specifications are the major causes of changes to the contract. There have been extreme examples of design errors such as numerous building collapse in Nigeria projects that have wrought disaster after the construction are completed.

These are examples of design errors that escaped the close scrutiny of all parties. One or two major errors that can be corrected with only cost considerations and little effect on the schedule can impact projects. The projects that really suffer are those with many small errors (design, rework or change of scope) which when finally added up cause major impacts on the cost and schedule growth. Through Davis and Ledbetters research it was determined that “accuracy of the design documents” was the most critical of the criteria used in the initial evaluation of design effectiveness.

This accuracy was further described as the concern for the frequency and impact of errors in the specifications and drawings. This is due to the fact that the drawings and specifications are the most “readily identifiable outputs of the design process.” It is evermore important that the quality control of designs be addressed during the planning phase and closely monitored during the construction phase.


1.3 Aim and Objectives of the Study

The main aim of the study is to investigate how design errors can affect the initial cost of a project. The specific objectives are:

  1. To determine what constitutes a design error.
  2. To examine the contributing factors to design errors in Nigeria.
  3. To examine how these factors can affect initial cost and growth of a project.

1.4 Research Questions

The study came up with research questions so as to be able to ascertain the above stated objectives. The specific research questions for the study are stated below as follows:

  • What makes or contributes to a design error?
  • What are the factors that lead to design errors?
  • What effect can design errors have on initial cost and growth of a project?

1.5 Hypothesis Formulation

In order to pursue the objective of this study, the following generalized statements have been designed to guide and aids in obtaining the result for the experiment to be conducted. For this work, the null hypothesis will be represented with H0 while the alternative hypothesis will be represented with hypothesis H1.

Hypothesis One

  • H0: There is no significant relationship between design error and initial project cost.
  • H1: There is significant relationship between design error and initial project cost.

1.6 Significance Of The Study

This study gives a clear insight into the various ways in which contractors in the construction companies in Nigeria can maximise profits and reduce initial cost through effective and efficient contract planning and management.

The study also gives a clear insight into the various effects of design errors on the cost of a project. The findings and recommendations of the researcher will help in building a strong and better project management guideline for contractors in Nigeria.


1.7 Scope Of Study

This research focuses mainly on the investigation of design errors on initial cost of a project. Results and recommendations may not be used to generalise other construction companies in Nigeria, as the researcher could not cover a wider scope due to financial and time constraints.

Based on the findings of this study other possible researchable areas may include studies on the various effects of other aspects of contracts such as contract laws in Nigeria and contract management and control.


1.8 Limitation Of The Study

During the course of this study, there were some problems encountered which stood as limitations to the research work. Some of the limitations include:

  1. Time Constraint:

    The time frame given to accomplish this project was very short due to school academic calendar and it was carried out under pressure which made the researcher not to implement some necessary features.

  2. Financial Constraint:

    Insufficient fund tends to impede the efficiency of the researcher in sourcing for the relevant materials, literature or information and in the process of data collection (internet, questionnaire and interview).

  3. Initial Cooperation Delay from Respondents:

    A particular limitation of this work came as a result of the respondent refusal to offer their cooperation at the initial time they were contacted. This contributed in making the success of this research study difficult.


1.9 Definition Of Terms

Design Error:

From the evaluation above a simple definition of design error is “a deviation from the plans and specifications.” It is not the intention of this definition to include any cost or schedule growth or insinuate its root causes or legal responsibility.

It is the responsibility of the owner, designer and contractor to establish the criteria in order to make a reasonable determination for responsibility. The survey shows a common theme, that of a mistake or error in the design. The survey also indicates several reasons why design errors exist and who cause them. This provides evidence that there is not a concise definition within the construction industry.

Contract:

Erikson (2002) defined Contract as an agreement that creates an obligation binding upon the parties thereto.

Contract Planning:

According to Simmons (2007), Contract planning is the process of systematically and efficiently managing contract creation, execution and analysis for maximising operational and financial performance and minimising risk.

Contractor:

General contractor, organization or individual that contracts with another organization or individual (the owner) for the construction of a building, road or other facility.

Profit:

Tucy (2008) defined profit as the difference between the purchase price and the costs of bringing to market

Initial Cost:

Initial costs are fixed, one-time expenses incurred on the purchase of land, buildings, construction, and equipment used in the production of goods or in the rendering of services. Put simply, it is the total cost needed to bring a project to a commercially operable status. Whether a particular cost is capital or not depend on many factors such as accounting, tax laws, and materiality.

Design:

The basic definition of design, according to Webster, is “the making of drawings or plans to plan and fashion the form and structure of an object to have intentions or purposes”. The quality of planning and design is one of the primary factors of success in any project endeavor (Chalabi, Beaudin and Salazar, 1987).

Error:

An error is defined, according to Webster, as “a deviation from accuracy or correctness; a mistake, as in action or procedure; an inaccuracy, as in speaking or writing”. There are basically three types of errors: imperfections, non-conformance and omissions. Imperfections are deviations in details that have no affect on the assembly or facility (Davis and Ledbetter, 1987).


CHAPTER TWO

2.0 Literature Review

2.1 Introduction

The review of relevant literature is the main topic of this chapter. A literature review covers theoretical and methodological contributions to a certain issue in addition to the state of knowledge at the time of writing. It provides information about the state of the art in relation to the subject you are writing about. It examines the body of work on the chosen subject. The literature evaluation in this study comprises the …


Procedure for Downloading the PDF (Docx) Material


An Investigation Into Design Errors and It’s Impact on Initial Cost of a Construction Project can be downloaded by requesting the full set of materials at the project or seminar cost. The document will be sent via Microsoft Word (MS-Word) format via WhatsApp (e-mail) following payment confirmation.


Seminar Material Cost
₦3,000
Project Material Cost
₦5,000


Request Complete Material

Complete Material Chapters of An Investigation Into Design Errors and Its Impact on Initial Cost of a Construction ProjectClick here to request the Complete Material via WhatsApp including;
  • Preliminary Pages,
  • Chapter 1-5,
  • References and Appendix.



TABLE OF CONTENTS

PRELIMINARY PAGES


CHAPTER ONE

INTRODUCTION


    • 1.0 Introduction
    • 1.1 Background …

    CHAPTER TWO

    LITERATURE REVIEW

    • 2.1 Introduction
    • 2.2 Conceptual Review
    • 2.3 Theoretical Framework
    • 2.4 Empirical Studies
    • 2.5 Research Gaps
    • 2.6 Summary of Literature Review

    CHAPTER THREE

    RESEARCH METHODOLOGY

    • 3.1 Introduction
    • 3.2 Research Design
    • 3.3 Population of Study
    • 3.4 Sampling and Sampling Technique
    • 3.5 Validation of Research Instrument
    • 3.6 Method of Data Collection
    • 3.7 Method of Data Analysis
    • 3.8 Questionnaire Administration
    • 3.9 Ethical Consideration
    • 3.10 Statistical Analysis

    CHAPTER FOUR

    DATA ANALYSIS, RESULT AND DISCUSSION

    • 4.1 Introduction
    • 4.2 Presentation and Analysis of Data
    • 4.3 Re-statement of Research Questions
    • 4.4 Test of Hypotheses
    • 4.5 Discussion of Findings

    CHAPTER FIVE

    SUMMARY, CONCLUSION AND RECOMMENDATION

    • 5.1 Introduction
    • 5.2 Summary of Findings
    • 5.3 Conclusion
    • 5.4 Recommendation
    • 5.5 Suggestion for Further Study

    REFERENCES

    APPENDIX A - “QUESTIONNAIRE”


    Disclaimer for Complete Material Utilization

    The displayed research work titled "An Investigation Into Design Errors and It's Impact on Initial Cost of a Construction Project" is stated as a research guideline towards accomplishing your assigned project / seminar research work. All the research materials on this website are ONLY for research purposes and should be used as a guideline in developing your research work. For no reason should you copy word for word as projectlist.com.ng will not be liable for any who copied the material. By ordering the complete research guideline, it signifies that you've accepted our terms of service.


    Frequently Asked Questions (FAQ)


    Can the material for “Socio-Economic Effects of Graduate Unemployment in Urban Centres” be used as a guide for Public Administration (PA) Project?

    Yes it can be used — Graduate unemployment in Nigeria Urban Centres has reached an alarming proportion. This study therefore investigated the socio-economic effects of graduate unemployment in urban centres using Kogi State as a case study. It examined the socio-economic effects of graduate unemployment both on the individual and the society in general, with the view to finding solution to graduate unemployment which will be useful to both government and non-governmental organization. The data for the study was collected through the questionnaire method; the research also interviewed a few highly placed and widely experienced individuals whose valuable contributions enabled the researcher to grasp the tropical development of graduate unemployment in Nigeria since independence. These findings indicate that unemployment is a distasteful experience to the individual …


    Is the topic “Assessment of Physical Distribution System Used by Beverage Firms” recommended for Purchasing and Supply (PS) Project?

    Yes it is highly recommended — This research work tries to appraise the assessment of physical in the management of customer service level in the beverage industry with special reference to beverage firm company Owerri. The focus of this research work is to find out the effect of distribution strategies and factors in the achievement of customer service level of beverage firm company, thus work further highlight on the assessment and impact of physical distribution in the creation of satisfied customers and the general profitability of the company. This project is composed of five chapter, chapter one is the introduction of the subject master, General description of the study, statement of problem, purpose of the study, relevant research question and hypothesis, definition of terms , significance as …


    Can this topic “The Causes and Effect of Tax Evasion on the Infrastructural Development of Imo State” be used for Business Administration and Management (BAM) Project?

    Yes it can be utilized for research — The main aim of this research is to look critically to understand the causes and effects of personal income tax evasion in the infrastructural development of imo state. This research work consists of five chapters chapter which tried to x-ray the causes and effects of personal income tax in owerri municipal l.G.A. Chapter two takes look at the concept and meaning of tax in imo state chapter three state the methods and procedures through which information is gathered while chapter four deals with data presentation analysis and test of research questions. Finally the chapter five which is the last chapter is the conclusion part of the research work. It summarizes all that is said about the topic. …


    Can this topic “Effect of Fermentation Time and Addition of Citric Acid on the Quality Characteristics of Cassava Flour” be used for Food Science and Technology (FT) Project?

    Yes it can be utilized for research — The study determines the effect of fermentation time and addition of citric acid on the quality characteristics of cassava flour. In achieving this aim, the following specific objectives were laid out to investigate how different fermentation times influence the quality characteristics of cassava flour, produce cassava flour at controlled conditions of temperature, relative humidity and time, monitor the fermentation time for breakdown and removal of cyanogenic compounds and cyanide, determine the proximate composition, functional and pasting properties of the final products, and determine the sensory attributes of the products. Fresh cassava roots were fermented for different time intervals of 12hr, 24 hr and 36hr with an additional sample to serve as control. Further analysis was carried out for the proximate …


    Can the material for “Local Government as an Instrument of Democratic Sustainability” be used as a guide for Public Administration (PA) Project?

    Yes it can be used — This research work is centre on the local government as an instrument of democratic sustainability with a case study of Lokoja Local Government Area, Kogi State. The major objectives of the work is to offer a pragmatic solution to the problem of development in Lokoja Local Government. primary and secondary methods were used in collecting data, while simple percentage method was used in analyzing data. The findings revealed that local government contributes to democratic sustainability. The researcher recommended that local government in Nigeria should be made to be more financially stable and independent. …


    Can the material for “Effect of Leadership Style on Workers Performance in an Organization” be used as a guide for Business Administration and Management (BAM) Project?

    Yes it can be used — Leadership style plays an important role in the motivation of workers performance. The style of leading adopted by a manager can affect the performance of the subordinates. It is important that before any leader adopts any style of leading, he should first of all understand the nature and characteristics of the subordinates since this can affect his performance. The purpose of this study is therefore, to examine the effect of leadership style on workers performance among the staff of federal polytechnic of Nasarawa. For this purpose, data was collected through questionnaire from the administrative staff of the institution. The chi square test was used to analyze the data, from the findings it was discovered that the participative style of leadership …


    Can the material for “Impact of Language Laboratory for Effective Teaching and Learning of Oral English in Junior Secondary School” be used as a guide for English Language Project?

    Yes it can be used — Oral language is the system through which we use spoken words to express knowledge, ideas, and feelings. The study was carried out to examine the Impact of Language Laboratory for Effective Teaching and Learning of Oral English in Junior Secondary Schools. In achieving this aim, the following specific objectives were laid out to find out the extent to which teachers’ incompetency has influence the proper use of language laboratory and if there are language laboratories available for effective teaching and learning of oral English in junior secondary schools. The research design used in this report is descriptive design, utilizing questionnaire method to obtain information from the respondents for this project. A total of 200 (two hundred) respondents were selected for …


    Can the material for “The Effect of Teachers’ Motivation on the Academic Performance of Secondary School Students” be used as a guide for Education Project?

    Yes it can be used — This research was carried out specifically to evaluate the effect of teachers’ motivation on the performance of secondary school students. This research was carried at in three schools under Agbado, Ifo District of Ogun State to actually known the extent in which teacher’s motivation goes in affecting the performance of secondary school students. Many motivational theorist, who propounded and experimented motivation theories stated that is the only techniques to make workers effective and efficiency whether on school setting or in an organization is motivation. Motivation is seen as an energizer that energizes workers in order to give their best in discharging this duties. However, it can be concluded that teachers are not satisfied because they are not adequately motivated and their have brought …


    Can the material for “Antibacterial Activity of Prunus Armaniaca” be used as a guide for Microbiology Project?

    Yes it can be used — Apricots (Prunus armeniaca) are stone fruits also known as Armenian plums. Round and yellow, they look like a smaller version of a peach but share the tartness of purple plums. The present study describes the antibacterial and antioxidant activity of methanol and water extracts of sweet and bitter apricot (Prunus armeniaca L.) kernels. The antioxidant properties of apricot kernels were evaluated by determining radical scavenging power, lipid peroxidation inhibition activity and total phenol content measured with a DPPH test, the thiocyanate method and the Folin method, respectively. In contrast to extracts of the bitter kernels, both the water and methanol extracts of sweet kernels have antioxidant potential. The highest percent inhibition of lipid peroxidation (69%) and total phenolic content (7.9 …


    Can this topic “Design, Construction and Performance Evaluation of an Axial-Flow Millet Thresher” be used for Agricultural Economics and Extension Project?

    Yes it can be utilized for research — Existing millet threshers have not been performing up to expectation. Based on this, the physical properties of pearl millet grains were determined and used to design an axial-flow millet thresher. The length, width, thickness, geometric diameter, sphericity, surface area of the grains were found to decreased with decrease in moisture content of the grains from 11.6 to 7.8 %. The bulk and true densities of the grains were gotten as 0.73 and 1.14 kg m-3 respectively and the coefficient of friction of the grains on sheet metal and aluminium were obtained as 0.35 and 0.36 respectively. The thresher was made from locally available materials and evaluated at 3 levels of crop moisture content of 7.8, 9.7 and 10.3 % (dry …



    Chat with us on WhatsApp